Skip to content
PlanIndex Get alerts
Menu

Planning application

Hadley Football Club Brickfield Lane Barnet EN5 3LD

Awaiting decision Barnet 26/2469/FUL Full applications

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of padel courts including lighting, parking and associated soft and hard landscaping. Renovation of the existing clubhouse with new front pergola and external seating area (Part Retrospective Application)

As published by the council, reference 26/2469/FUL

Application record

Reference
26/2469/FUL
Category
Full applications
Status
Pending Consideration
Received
30 Jun 2026
Validated
22 Jul 2026
Postcode
EN5 3LD

Timeline

Dates from the published record

  1. 30 Jun 2026

    Received by Barnet

  2. 22 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 7 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 16 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Barnet took a median of 43 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Barnet for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • The Gate 195 Barnet Road Barnet EN5 3LA

    TPP/0109/26 Submitted 23 Feb 2026 86m away

    4 x Thuja - Reduce height by 4 metres to bring them in line with the existing trees. These works will help safeguard their longevity while also ensuring the safety of patrons visiting and using the car park. Standing in Group G12 of Tree Preservation Order.

    Refused Trees 6 docs
  • Windmill House Windmill Lane Barnet EN5 3HX

    25/4273/LBC Submitted 24 Oct 2025 87m away

    The replacement of storm damaged sails to the windmill with associated works including repairing damage to the cap roof and handrails at the top of the windmill, together with the reapplication of traditional black tar to the mill body and white paint to the cap

    Granted Heritage and listed buildings 7 docs
  • 8 Barnet Gate Lane Barnet EN5 2AB

    25/4248/CON Submitted 23 Oct 2025 138m away

    Submission of details of condition 5 (ASHP - Noise Emission) pursuant to planning permission 24/4208/HSE dated 20/12/2024

    Granted Conditions 4 docs
  • Kimwood Windmill Lane Barnet EN5 3HX

    26/1657/CON Submitted 1 May 2026 179m away

    95% historically approved · decision due ~26 Jun

    Submission of details of condition 3 (Materials) 5 (Levels) pursuant to planning permission 26/0718/S73 dated 22/04/2026

    Awaiting decision Conditions 3 docs
  • Kimwood Windmill Lane Barnet EN5 3HX

    26/0718/S73 Submitted 24 Feb 2026 179m away

    Variation of Condition 1 (Approved Plans) of planning permission reference 23/0662/FUL dated 17/08/23 for 'Demolition of the existing dwelling and garage and the construction of a new detached two storey dwellinghouse with basement level and garage.' Variation to include introduction of single storey side additions, changes to fenestration and materials

    Granted Conditions Demolition Windows or glazing 11 docs
    Small domestic
  • Kimwood Windmill Lane Barnet EN5 3HX

    25/4888/CON Submitted 5 Dec 2025 182m away

    95% historically approved · decision due ~12 Feb

    Submission of details of conditions 4 (Demolition & Construction Management and Logistics Plan) 7 (Services excavations in relation to Trees) 8 (Tree Protection plan) 16 (Archaeological Written Scheme of Investigation) pursuant to planning permission 23/0662/FUL dated 28/02/2023

    Awaiting decision Conditions Demolition Trees 7 docs

In Barnet

  • 26/3239/FUL Awaiting decision

    Henley Court Watford Way London NW4 4SR

    Construction of additional floor to provide 7no. self-contained flats. Construction of two storey side extension with rooms in the roofspace to provide 2no. self-contained flats. Associated refuse storage

    4 Sep 2026 Full applications
  • 26/3238/FUL Awaiting decision

    2 North End Road London NW11 7PH

    New shopfront with double glazed front folding doors

    4 Sep 2026 Full applications
  • 26/3230/FUL Awaiting decision

    50 Ballards Lane London N3 2DP

    Installation of a kitchen extract ventilation system within existing commercial unit on ground floor and flat roof with a discharge flue fixed to the rear elevation, together with associated internal alterations

    3 Sep 2026 Full applications
  • 26/3199/FUL Awaiting decision

    494 Finchley Road London NW11 8DE

    Demolition of the existing dwelling and erection of a two storey building over basement car park with rooms in the roofspace to provide 6no. self-contained residential dwellings. Associated amenity space, cycle stores and refuse/recycling storage

    1 Sep 2026 Full applications
  • 26/3200/FUL Awaiting decision

    289 Regents Park Road London N3 3JY

    Removal of front extension. Single storey side extension including new walls to replace existing boundary fences. (Part Retrospective)

    1 Sep 2026 Full applications