Skip to content
PlanIndex Get alerts
Menu

Planning application

149 High Street Barnet EN5 5SU

Awaiting decision Barnet 26/2245/FUL Full applications

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Single storey rear extension, enclosure of existing outdoor courtyard space to provide function room, alterations to internal layouts at basement and ground floor levels. Change of use of existing first and second floor levels into 2no. HMO units. Associated refuse and cycle storage

As published by the council, reference 26/2245/FUL

Application record

Reference
26/2245/FUL
Category
Full applications
Status
Pending Consideration
Received
16 Jun 2026
Validated
2 Jul 2026
Postcode
EN5 5SU

Timeline

Dates from the published record

  1. 16 Jun 2026

    Received by Barnet

  2. 2 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 9 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 27 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Barnet took a median of 42 days over the applications it decided in the last year.

What happens while it is decided

The process from here

This application is with Barnet for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 161 High Street Barnet EN5 5SU

    26/1911/CON Submitted 21 May 2026 48m away

    Submission of details of conditions 5 (Construction Management and Logistics Plan) and 11 (Means of Enclosure/Boundary Treatment) pursuant to planning permission 25/4516/FUL dated 08/04/2026

    Granted Conditions 5 docs
  • 13 Christ Church Lane Barnet EN5 4PL

    TCP/0176/26 Submitted 24 Mar 2026 57m away

    1 X Sycamore (Applicant Ref T1) - Crown reduction by 2m in height and 1.5m in lateral growth, leaving the tree a standing height of 6m 1 X Apple (Applicant Ref T2) - Crown reduction by 1m in height and 0.5m in lateral growth, leaving the tree a standing height of 4m 1 X Pear (Applicant Ref T3) - Crown reduction by 1m in height and 0.5m in lateral growth, leaving the tree a standing height of 4m

    Decided Trees 4 docs
  • 1 Christ Church Lane Barnet EN5 4PL

    25/4691/FUL Submitted 24 Nov 2025 83m away

    61% historically approved · decision due ~21 Jan

    Change of use of vacant (Class E) to 1no self-contained dwelling. Changes to ground floor fenestration. Associated refuse/recycling and cycle storage

    Awaiting decision Full applications Windows or glazing 7 docs
    Domestic
  • 204 High Street Barnet EN5 5SZ

    26/1037/RCU Submitted 18 Mar 2026 85m away

    70% historically approved · decision due ~13 May

    Installation of 6no. (HVAC) air condenser units to roof to replace the existing. New opening to side (south) elevation to form a fire door. Addition of an external window graphic/vinyl to side (north) elevation. (Retrospective Application)

    Awaiting decision Amendments Windows or glazing 8 docs
  • 204 High Street Barnet EN5 5SZ

    26/1861/191 Submitted 18 May 2026 85m away

    Exterior painting of the building

    Decided Lawful development 7 docs
  • 204 High Street Barnet EN5 5SZ

    25/5021/FUL Submitted 15 Dec 2025 85m away

    61% historically approved · decision due ~2 Mar

    Insertion of 6no. (HVAC) air condenser units to roof to replace the existing . New opening to form fire door. Changes to the existing shop front including repainting and insertion of new facade panels (Part Retrospective)

    Awaiting decision Full applications Windows or glazing 12 docs

In Barnet

  • 26/3199/FUL Awaiting decision

    494 Finchley Road London NW11 8DE

    Demolition of the existing dwelling and erection of a two storey building over basement car park with rooms in the roofspace to provide 6no. self-contained residential dwellings. Associated amenity space, cycle stores and refuse/recycling storage

    1 Sep 2026 Full applications
  • 26/3200/FUL Awaiting decision

    289 Regents Park Road London N3 3JY

    Removal of front extension. Single storey side extension including new walls to replace existing boundary fences. (Part Retrospective)

    1 Sep 2026 Full applications
  • 26/3205/FUL Awaiting decision

    The Knoll Highwood Hill London NW7 4ET

    Demolition of the existing dwelling and erection of a new two storey dwelling with rooms in the roofspace. Associated bike storage

    1 Sep 2026 Full applications
  • 26/3204/FUL Awaiting decision

    136 Station Road London N3 2SG

    Conversion of existing property into 3no. self-contained flats including: Part single, part two storey rear extension; Roof extension including hip to gable with 1no. rear dormer window, 3no. front facing rooflights and 1no. gable window

    1 Sep 2026 Full applications
  • 26/3195/FUL Awaiting decision

    128 - 130 Woodfield Drive Barnet EN4 8PB

    Creation of new vehicle hardstanding and vehicular access to provide off-street parking, with associated retaining walls, steps, railings, landscaping and electric vehicle charging points to both properties. (Part Retrospective Application)

    1 Sep 2026 Full applications