Planning application
Mathilda Marks Kennedy Jewish Primary School 68 Hale Lane London NW7 3RT
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of solar panels to roof
As published by the council, reference 26/2168/FUL
Application record
- Reference
- 26/2168/FUL
- Category
- Full applications
- Status
- Pending Consideration
- Received
- 10 Jun 2026
- Validated
- 2 Jul 2026
- Postcode
- NW7 3RT
Timeline
Dates from the published record
-
10 Jun 2026
Received by Barnet
-
2 Jul 2026
Validated
Checked as complete and ready for consideration.
-
9 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 27 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Barnet took a median of 42 days over the applications it decided in the last year.
What happens while it is decided
The process from here
This application is with Barnet for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Mathilda Marks Kennedy Jewish Primary School 68 Hale Lane London NW7 3RT
79% historically approved · decision due ~14 Sep
Installation of solar panels to roof
Awaiting decision Heritage and listed buildings -
2 Downhurst Avenue London NW7 3QA
Single storey rear extension with a maximum proposed depth of 6.0m, a maximum height of 2.99m and an eaves height of 2.99m
Refused Prior approval Extension 8 docsSmall domestic -
2 Downhurst Avenue London NW7 3QA
79% historically approved · decision due ~21 Jul
Roof extension involving rear dormer window and 2no. front facing rooflghts. New front porch
Awaiting decision Lawful development Extension Loft or dormer +1 6 docsSmall domestic -
The Orchard 104 Hale Lane London NW7 3SE
95% historically approved · decision due ~11 Feb
Submission of details of condition 4 (Cycle parking/storage) 5 (Refuse/recycling storage) pursuant to planning permission 23/3506/FUL dated 16/08/2023
Awaiting decision Conditions 3 docs -
5 Downhurst Avenue London NW7 3QA
79% historically approved · decision due ~11 Nov
Conversion of the existing garage to habitable room including the partial raising of the roof to provide a flat roof, insertion of window to replace the garage door
Awaiting decision Lawful development Windows or glazing 17 docs -
30 Sunbury Gardens London NW7 3SG
Conversion of the existing garage to habitable room, insertion of window to replace garage door
Granted Householder Windows or glazing 9 docsDomestic
Other full applications applications
In Barnet
-
26/3199/FUL Awaiting decision
494 Finchley Road London NW11 8DE
Demolition of the existing dwelling and erection of a two storey building over basement car park with rooms in the roofspace to provide 6no. self-contained residential dwellings. Associated amenity space, cycle stores and refuse/recycling storage
-
26/3200/FUL Awaiting decision
289 Regents Park Road London N3 3JY
Removal of front extension. Single storey side extension including new walls to replace existing boundary fences. (Part Retrospective)
-
26/3205/FUL Awaiting decision
The Knoll Highwood Hill London NW7 4ET
Demolition of the existing dwelling and erection of a new two storey dwelling with rooms in the roofspace. Associated bike storage
-
26/3204/FUL Awaiting decision
136 Station Road London N3 2SG
Conversion of existing property into 3no. self-contained flats including: Part single, part two storey rear extension; Roof extension including hip to gable with 1no. rear dormer window, 3no. front facing rooflights and 1no. gable window
-
26/3195/FUL Awaiting decision
128 - 130 Woodfield Drive Barnet EN4 8PB
Creation of new vehicle hardstanding and vehicular access to provide off-street parking, with associated retaining walls, steps, railings, landscaping and electric vehicle charging points to both properties. (Part Retrospective Application)