Planning application
Flat 2 29 The Grove London N3 1QT
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of ground floor side window
As published by the council, reference 26/0680/FUL
Application record
- Reference
- 26/0680/FUL
- Type
- Full Application
- Status
- Approved subject to conditions
- Decision
- Approve subject to conditions
- Received
- 23 Feb 2026
- Validated
- 23 Feb 2026
- Decided
- 16 Apr 2026
- Ward
- West Finchley
- Decision by
- Delegated Decision
- Postcode
- N3 1QT
Timeline
Dates from the published record
-
23 Feb 2026
Received by Barnet
-
16 Apr 2026
Decision issued: Approve subject to conditions
-
10 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in London
38 applications on PlanIndex · across 6 councils · 81% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
31A The Grove London N3 1QT
60% historically approved · decision due ~27 May
Roof extension including rear dormer window with juliette balcony and 2no. rear and 4no. front facing rooflights
Awaiting decision Full applications Extension Loft or dormer +1 6 docs -
49 The Grove London N3 1QT
60% historically approved · decision due ~11 Mar
Alterations and extensions to existing property to provide 1no. additional self-contained flat at second floor level and extensions to existing 4no. flats, including: Demolition of existing rear extensions; Creation of new basement level including lowering floor level of existing storage areas with associated lower ground floor rear extension with sunken courtyard and access steps to garden; Ground and first floor rear extension; Roof extension including rear dormer window and insertion of front and rear facing rooflights; Provision of new soft landscaping to front, 1no. car parking space, cycle storage and refuse and recycling storage
Awaiting decision Full applications New dwelling Extension +3 11 docsSeveral homes -
345 Nether Street London N3 1JN
79% historically approved · decision due ~4 Mar
Erection of a rear outbuilding with patio area following demolition of the existing outbuilding
Awaiting decision Lawful development Demolition 5 docs -
11 Grove Avenue London N3 1QS
Roof extension involving 1no. rear dormer window over main roof and 1no. rear dormer over outrigger roof with side window and 2no. front facing rooflights.
Decided Lawful development Extension Loft or dormer +1 10 docs -
St Ronans Nether Street London N3 1QY
86% historically approved · decision due ~29 Oct
1 x Lime (applicants ref. T1) - Raise crown to 5m over the road and 3m over the pavement. Standing in T1 of Tree Preservation Order.
Awaiting decision Trees 3 docs -
39 Ballards Lane London N3 1XP
Installation of 4no. internally illuminated fascia signs, 8no. non-illuminated fascia signs, 2no. internally illuminated projecting signs and 1no window vinyl
Granted Advertising Windows or glazing 14 docs
Other full applications applications
In Barnet
-
26/3239/FUL Awaiting decision
Henley Court Watford Way London NW4 4SR
Construction of additional floor to provide 7no. self-contained flats. Construction of two storey side extension with rooms in the roofspace to provide 2no. self-contained flats. Associated refuse storage
-
26/3238/FUL Awaiting decision
2 North End Road London NW11 7PH
New shopfront with double glazed front folding doors
-
26/3230/FUL Awaiting decision
50 Ballards Lane London N3 2DP
Installation of a kitchen extract ventilation system within existing commercial unit on ground floor and flat roof with a discharge flue fixed to the rear elevation, together with associated internal alterations
-
26/3199/FUL Awaiting decision
494 Finchley Road London NW11 8DE
Demolition of the existing dwelling and erection of a two storey building over basement car park with rooms in the roofspace to provide 6no. self-contained residential dwellings. Associated amenity space, cycle stores and refuse/recycling storage
-
26/3200/FUL Awaiting decision
289 Regents Park Road London N3 3JY
Removal of front extension. Single storey side extension including new walls to replace existing boundary fences. (Part Retrospective)