Planning application

77 - 87 Silkstream Road Edgware HA8 0DD

Granted Barnet 25/4803/FUL Full Application

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Reinstatement and refurbishment of external and internal building features following fire Damage at nos. 77 - 87 including replacement of roof structure and finishes and external windows and doors

As published by the council, reference 25/4803/FUL

Application record

Reference
25/4803/FUL
Type
Full Application
Status
Approved subject to conditions
Decision
Approve subject to conditions
Received
1 Dec 2025
Validated
3 Dec 2025
Decided
5 Jan 2026
Ward
Burnt Oak
Decision by
Delegated Decision
Postcode
HA8 0DD

Timeline

Dates from the published record

  1. 1 Dec 2025

    Received by Barnet

  2. 3 Dec 2025

    Validated

    Checked as complete and ready for consideration.

  3. 5 Jan 2026

    Decision issued: Approve subject to conditions

  4. 10 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

9 applications on PlanIndex · across 7 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 51 Gervase Road Edgware HA8 0EW

    25/4142/HSE Submitted 15 Oct 2025 134m away

    77% historically approved · decision due ~10 Dec

    Single storey side and rear extension

    Awaiting decision Householder Extension 3 docs
    Small domestic
  • International Gospel Church 102A Watling Avenue Edgware HA8 0LN

    26/0368/FUL Submitted 2 Feb 2026 213m away

    61% historically approved · decision due ~30 Mar

    Construction of a new external platform lift to provide universal step-free access, a bridge link and the creation of a new entrance on the side elevation to the upper ground floor

    Awaiting decision Full applications 10 docs
  • St Alphage Church Hall Playfield Road Edgware HA8 0DF

    TCP/0015/26 Submitted 12 Jan 2026 232m away

    87% historically approved · decision due ~10 Mar

    1 x Large Hawthorn (applicants ref. T1) - Reduce height by 2.5 metres and thin out by 15%. 1 x Large Plum (applicants ref. T2) - Reduce height by 2.5 metres and thin out by 20%. 2 x Small Hawthorn (applicants ref. T3) - Reduce height by 1.5 metres and thin out by 10%. 1 x Cherry (applicants ref. T4) - Reduce height by 2.5 metres. 2 x Hawthorn (applicants ref. T5) - Reduce height by 2 metres and thin out by 15%. 2 x Ash (applicants ref. T6) - Reduce height by 2.5 metres. 2 x Plum (applicants ref. T7) - Reduce height by 2 metres and thin out by 15%.

    Awaiting decision Trees 6 docs
  • 19 Gilbert Grove Edgware HA8 0HJ

    25/4673/191 Submitted 24 Nov 2025 248m away

    79% historically approved · decision due ~19 Jan

    Reconfiguration of internal layout to create 1 additional bedroom to create 2 bed unit (AMENDED DESCRIPTION)

    Awaiting decision Lawful development 3 docs
  • Burnt Oak Underground Station Watling Avenue Edgware HA8 0LA

    26/0538/CON Submitted 11 Feb 2026 264m away

    Submission of details of Condition 3 (Metal Panelling) pursuant to planning permission 19/4837/PNG dated 06/12/2019

    Granted Conditions 3 docs
  • Burnt Oak Underground Station Watling Avenue Edgware HA8 0LA

    26/1615/NMA Submitted 29 Apr 2026 265m away

    70% historically approved · decision due ~24 Jun

    Non material amendment to planning permission 19/4837/PNG dated 06/12/2019 for 'Installation of a free access lift shaft, elevated walkway and overbridge linking the island platform, switch room, removal and repositioning of existing maintenance stair, minor demolition(including platform waiting shelter and redundant station office) and associated works.'. Amendments include updated lift shaft design, additional glazed screen perch seat at upper lift lobby, overbridge cladding setting out and floor levels and structural changes to overbridge columns and stairs

    Awaiting decision Amendments Demolition Windows or glazing 3 docs

In Barnet

  • 26/3199/FUL Awaiting decision

    494 Finchley Road London NW11 8DE

    Demolition of the existing dwelling and erection of a two storey building over basement car park with rooms in the roofspace to provide 6no. self-contained residential dwellings. Associated amenity space, cycle stores and refuse/recycling storage

    1 Sep 2026 Full applications
  • 26/3200/FUL Awaiting decision

    289 Regents Park Road London N3 3JY

    Removal of front extension. Single storey side extension including new walls to replace existing boundary fences. (Part Retrospective)

    1 Sep 2026 Full applications
  • 26/3205/FUL Awaiting decision

    The Knoll Highwood Hill London NW7 4ET

    Demolition of the existing dwelling and erection of a new two storey dwelling with rooms in the roofspace. Associated bike storage

    1 Sep 2026 Full applications
  • 26/3204/FUL Awaiting decision

    136 Station Road London N3 2SG

    Conversion of existing property into 3no. self-contained flats including: Part single, part two storey rear extension; Roof extension including hip to gable with 1no. rear dormer window, 3no. front facing rooflights and 1no. gable window

    1 Sep 2026 Full applications
  • 26/3195/FUL Awaiting decision

    128 - 130 Woodfield Drive Barnet EN4 8PB

    Creation of new vehicle hardstanding and vehicular access to provide off-street parking, with associated retaining walls, steps, railings, landscaping and electric vehicle charging points to both properties. (Part Retrospective Application)

    1 Sep 2026 Full applications