Skip to content
PlanIndex Get alerts
Menu

Planning application

979 High Road London N12 8QR

Granted Barnet 25/4246/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use of premises from partial use as car rental(Sui Generis) and workshop(Class B2) to full use as light vehicle repair workshop and installation of MOT Bay

As published by the council, reference 25/4246/FUL

Application record

Reference
25/4246/FUL
Type
Full Application
Status
Approved subject to conditions
Decision
Approve subject to conditions
Received
23 Oct 2025
Validated
28 Oct 2025
Decided
2 Dec 2025
Ward
Woodhouse
Decision by
Delegated Decision
Postcode
N12 8QR

Timeline

Dates from the published record

  1. 23 Oct 2025

    Received by Barnet

  2. 28 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 2 Dec 2025

    Decision issued: Approve subject to conditions

  4. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 979 High Road London N12 8QR

    25/4247/ADV Submitted 23 Oct 2025 0m away

    Installation of 1no. non-illuminated fascia sign

    Granted Advertising 12 docs
  • 979 High Road London N12 8QR

    26/0021/CON Submitted 5 Jan 2026 1m away

    95% historically approved · decision due ~2 Mar

    Submission of details of condition 3 (Noise Report) and Condition 5 (Contaminated Land) pursuant to planning permission 25/4246/FUL dated 02/12/2025.

    Awaiting decision Conditions 6 docs
  • 979 High Road London N12 8QR

    25/3980/192 Submitted 1 Oct 2025 6m away

    79% historically approved · decision due ~27 Nov

    Use as vehicle repair workshop, vehicle showroom and car wash

    Awaiting decision Lawful development 7 docs
  • 940 High Road London N12 9RT

    25/4062/FUL Submitted 8 Oct 2025 69m away

    60% historically approved · decision due ~4 Dec

    Alterations to existing kitchen extraction system including extension of existing flue

    Awaiting decision Full applications Extension 10 docs
  • 940 High Road London N12 9RT

    25/4069/S73 Submitted 8 Oct 2025 69m away

    95% historically approved · decision due ~5 Dec

    Variation of condition 2 (Hours of Use) of planning permission reference N06374A/02 dated 03/04/02 for 'Change of use to Class A3 (cafe) incorporating new shop-front and internally illuminated fascia sign together with erection of extract flue at the rear.' Variation to include change of opening hours to 8:00 am - 11:00 pm every day

    Awaiting decision Conditions Windows or glazing 4 docs
  • Brentmead House 2 Britannia Road London N12 9RS

    26/2458/FUL Submitted 29 Jun 2026 70m away

    60% historically approved · decision due ~24 Aug

    Construction of a roof extension to provide two additional storeys comprising 5 self-contained flats (Use Class C3), together with associated works including refuse/recycling storage and cycle parking

    Awaiting decision Full applications New dwelling Extension

In Barnet

  • 26/3239/FUL Awaiting decision

    Henley Court Watford Way London NW4 4SR

    Construction of additional floor to provide 7no. self-contained flats. Construction of two storey side extension with rooms in the roofspace to provide 2no. self-contained flats. Associated refuse storage

    4 Sep 2026 Full applications
  • 26/3238/FUL Awaiting decision

    2 North End Road London NW11 7PH

    New shopfront with double glazed front folding doors

    4 Sep 2026 Full applications
  • 26/3230/FUL Awaiting decision

    50 Ballards Lane London N3 2DP

    Installation of a kitchen extract ventilation system within existing commercial unit on ground floor and flat roof with a discharge flue fixed to the rear elevation, together with associated internal alterations

    3 Sep 2026 Full applications
  • 26/3199/FUL Awaiting decision

    494 Finchley Road London NW11 8DE

    Demolition of the existing dwelling and erection of a two storey building over basement car park with rooms in the roofspace to provide 6no. self-contained residential dwellings. Associated amenity space, cycle stores and refuse/recycling storage

    1 Sep 2026 Full applications
  • 26/3200/FUL Awaiting decision

    289 Regents Park Road London N3 3JY

    Removal of front extension. Single storey side extension including new walls to replace existing boundary fences. (Part Retrospective)

    1 Sep 2026 Full applications