Planning application
Ipswich Road Harkstead Suffolk
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Development by a Statutory undertaker - Erection of a 9m wooden pole
As published by the council, reference DC/26/03972
Application record
- Reference
- DC/26/03972
- Type
- Development by statutory undertaker
- Status
- Awaiting decision
- Received
- 11 Sep 2026
- Validated
- 14 Sep 2026
- Ward
- Stour
- Parish
- Harkstead
Timeline
Dates from the published record
-
11 Sep 2026
Received by Babergh
-
14 Sep 2026
Validated
Checked as complete and ready for consideration.
-
17 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 9 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Babergh took a median of 49 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
1 document on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Babergh for determination, against a statutory target of eight weeks. Over the last year Babergh's median decision took 49 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Babergh's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
Land Outside 10 River View Road Harkstead Suffolk
Development by Statutory Undertaker - Erection of 1no. 8m Light pole
Granted 1 doc -
Land Outside 10 River View Road Harkstead Suffolk
Development by Statutory Undertaker - Erection of 1no. 8m Light pole
Granted 1 doc -
Land West Of Hill Cottage The Street Harkstead IP9 1BN
Discharge of Conditions for planning application B/16/01456. Condition 4: Action Required in Accordance with a Specific Timetable:Agreement of Materials: See attached Covering Letter dated 5 October 2017 and Render Colour chartCondition 5. Action Required Prior To The First Occupation of Development:Details of Screen Walls and Fences: See attached Covering Letter dated 5 October 2017 and plan "Condition 5: Details of Screen Walls and Fences" drawing Discharge of Conditions for application B/16/01456, Conditions 4,5,6,7,8 and 10. GL.PR.1.1a dated 15 August 2017.Condition 6. Action Required Prior To Commencement of Development:Landscaping Scheme: See attached Covering Letter dated 5 October 2017 and plan "Condition 6: Landscaping Scheme" drawing GL.PR.1.1b dated 15 August 2017.Condition 7. Action Required Prior To Commencement of Development:Agreement of Measures to Improve Sustainability of Development: See attached Covering Letter dated 5 October 2017 and Sustainability Statement" dated 5 October 2017.Condition 8. Action Required in Accordance With A Specific Timetable - SurfaceWater Drainage Details: See attached Covering Letter and plan "Condition 8: Details of Surface Water Drainage" drawing GL.PR.1.1c dated 15 August 2017.Condition 10. Action Required Prior To Commencement of Works To Access:Highways - Surface Water Discharge Prevention Details Required: See attached Covering Letter dated 5 October 2017 and plan "Condition 10: Details of Highways - Surface Water Discharge Prevention" drawing GL.PR.1.1d dated 15 August 2017.
Granted Conditions 11 docs -
Land West Of Hill Cottage The Street Harkstead IP9 1BN
Discharge of Conditions for planning application B/16/01456. Condition 4: Action Required in Accordance with a Specific Timetable:Agreement of Materials: See attached Covering Letter dated 5 October 2017 and Render Colour chartCondition 5. Action Required Prior To The First Occupation of Development:Details of Screen Walls and Fences: See attached Covering Letter dated 5 October 2017 and plan "Condition 5: Details of Screen Walls and Fences" drawing Discharge of Conditions for application B/16/01456, Conditions 4,5,6,7,8 and 10. GL.PR.1.1a dated 15 August 2017.Condition 6. Action Required Prior To Commencement of Development:Landscaping Scheme: See attached Covering Letter dated 5 October 2017 and plan "Condition 6: Landscaping Scheme" drawing GL.PR.1.1b dated 15 August 2017.Condition 7. Action Required Prior To Commencement of Development:Agreement of Measures to Improve Sustainability of Development: See attached Covering Letter dated 5 October 2017 and Sustainability Statement" dated 5 October 2017.Condition 8. Action Required in Accordance With A Specific Timetable - SurfaceWater Drainage Details: See attached Covering Letter and plan "Condition 8: Details of Surface Water Drainage" drawing GL.PR.1.1c dated 15 August 2017.Condition 10. Action Required Prior To Commencement of Works To Access:Highways - Surface Water Discharge Prevention Details Required: See attached Covering Letter dated 5 October 2017 and plan "Condition 10: Details of Highways - Surface Water Discharge Prevention" drawing GL.PR.1.1d dated 15 August 2017.
Granted Conditions 11 docs -
Beach View Walnut Tree Lane Harkstead IP9 1BS
78% historically approved · decision due ~11 Jun
Full Planning Application - Demolition of existing dwelling and outbuildings and erection of 1 no. self-build dwelling and detached garage.
Awaiting decision Full applications New dwelling Demolition 31 docsDomestic -
Beach View Walnut Tree Lane Harkstead IP9 1BS
78% historically approved · decision due ~11 Jun
Full Planning Application - Demolition of existing dwelling and outbuildings and erection of 1 no. self-build dwelling and detached garage.
Awaiting decision Full applications New dwelling Demolition 31 docsDomestic