Skip to content
PlanIndex Get alerts
Menu

Planning application

Land Rear Of 30 Market Hill Sudbury Suffolk CO10 2EN

Granted Babergh DC/25/05227 Full App Without Compliance of Condition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Application under S73 for Removal or Variation of a Condition following grant of Planning Permission DC/25/01085 dated 01.05.2025. Town and Country Planning Act 1990 (as amended) - Erection of 4No. (terraced) dwellings and alterations/improvement to: (1) outbuilding to form cycle store, (2) boundary wall and (3) existing access. To vary condition 2 (Approved Plans and Documents).

As published by the council, reference DC/25/05227

Application record

Reference
DC/25/05227
Type
Full App Without Compliance of Condition
Status
Granted
Decision
Granted
Received
27 Nov 2025
Validated
28 Nov 2025
Decided
23 Jan 2026
Ward
Sudbury South West
Parish
Sudbury
Decision by
Delegated Decision
Postcode
CO10 2EN

Timeline

Dates from the published record

  1. 27 Nov 2025

    Received by Babergh

  2. 28 Nov 2025

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jan 2026

    Decision issued: Granted

  4. 9 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • Land To The Rear Of 30 Market Hill Sudbury Suffolk

    DC/26/02125 Submitted 19 May 2026 0m away

    Discharge of Conditions Application for DC/25/01085 - Conditions 8 (External Hard Surfacing), 13 (Access Surfacing) and 14 (Surface Water Discharge Prevention)

    Granted Conditions 9 docs
  • Land Rear Of 30 Market Hill Sudbury Suffolk CO10 2EN

    DC/25/05617 Submitted 24 Dec 2025 0m away

    95% historically approved · decision due ~19 Mar

    Discharge of Conditions Application for DC/25/01085 - Conditions 3 (Materials), 4 (Fenestration), 5 (Rainwater Goods), 6 (Eaves and Verges), 7 (Vents), 9 (Boundary Treatments), 16 (Electric Vehicle Charging Points), and 20 (Archaeology) and 31 (Construction Management Plan)

    Awaiting decision Conditions Windows or glazing 26 docs
  • Land To The Rear Of 30 Market Hill Sudbury Suffolk

    DC/26/02125 Submitted 19 May 2026 0m away

    Discharge of Conditions Application for DC/25/01085 - Conditions 8 (External Hard Surfacing), 13 (Access Surfacing) and 14 (Surface Water Discharge Prevention)

    Granted Conditions 9 docs
  • Land Rear Of 30 Market Hill Sudbury Suffolk CO10 2EN

    DC/25/05617 Submitted 24 Dec 2025 0m away

    95% historically approved · decision due ~19 Mar

    Discharge of Conditions Application for DC/25/01085 - Conditions 3 (Materials), 4 (Fenestration), 5 (Rainwater Goods), 6 (Eaves and Verges), 7 (Vents), 9 (Boundary Treatments), 16 (Electric Vehicle Charging Points), and 20 (Archaeology) and 31 (Construction Management Plan)

    Awaiting decision Conditions Windows or glazing 26 docs
  • Land To The Rear Of 30 Market Hill Sudbury Suffolk

    DC/26/00355 Submitted 28 Jan 2026 0m away

    95% historically approved · decision due ~30 Mar

    Application under Section 73 of The Town and Country Planning Act 1990 - Variation of Condition 2 (Approved Plans and Documents) and Condition 12 (Provision of Access Prior to Any Other Works Commencing) of Planning Permission DC/25/05227 dated 23/01/2026 - Erection of 4No. (terraced) dwellings and alterations/improvement to: (1) outbuilding to form cycle store, (2) boundary wall and (3) existing access.

    Awaiting decision Conditions 11 docs
    Small domestic
  • Land To The Rear Of 30 Market Hill Sudbury Suffolk

    DC/26/01315 Submitted 26 Mar 2026 0m away

    Discharge of Conditions Application for DC/25/01085 - Conditions 4 (Fenestration), 6 (Eaves and Verges Details), 9 (Boundary Treatments) and Condition 20 (Archaeology)

    Split decision Conditions Windows or glazing 16 docs

In Babergh

  • DC/26/03850 Awaiting decision

    The National Grid (Bramford To Twinstead Reinforcement) Order 2024

    Submission of details reserved by Requirement 4(1)(d) Landscape and Ecological Management Plan for Stage 6 of the authorised development pursuant to The National Grid (Bramford to Twinstead Reinforcement) Order 2024

    4 Sep 2026 Conditions
  • DC/26/03834 Awaiting decision

    Land East And West Of Aubrey Drive Sudbury Part In The Parish Of Chilton

    Discharge of Conditions Application for DC/21/06676 - 3 (Surface Water Managemet Strategy), 4 (Surface Water Management Strategy - Implementation and maintenance), 6 (Construction Surface Water Management Plan), 8 (Biodiversity Enhancement Strategy), 10 (Archaeological Works), 13 (Construction Management - Environmental protection), 14 (Construction Management - Highway Safety) and 15 (Landscaping Scheme)

    3 Sep 2026 Conditions
  • DC/26/03842 Awaiting decision

    The National Grid (Bramford To Twinstead Reinforcement) Order 2024

    Submission of Details reserved by Requirement 4(a) - Construction Environmental Management Plan for Stages 6-8 of the authorised development pursuant to the The National Grid (Bramford to Twinstead Reinforcement) Order 2024

    3 Sep 2026 Conditions
  • DC/26/03458 Granted

    Land East Of Old Station Road Mendlesham Suffolk

    Discharge of Conditions Application for DC/24/04832 - Condition 26 (Site investigation and post investigation assessment)

    11 Aug 2026 Conditions
  • DC/26/03798 Awaiting decision

    Land To The East Of Ely Road Barham Suffolk

    Discharge of Conditions Application for DC/22/06117 - Discharge of Conditions 5 (Advance Planting), 6 (Landscape Management), 7 (Hard and Soft Landscaping), 9 (Open Space and Play Space), 19 (Fire Hydrants), 28 (Ecology Mitigation and Enhancement Measures), 30 (Landscape and Ecological Management Plan), 31 (Lighting Design Scheme for Biodiversity) and 32 (SPA and Ramsar Site)

    2 Sep 2026 Conditions