Skip to content
PlanIndex Get alerts
Menu

Planning application

Land At Eye Airfield Castleton Way Eye Suffolk

Granted Babergh DC/22/04864 Discharge of Condition(s)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Discharge of Conditions Application for 3563/15 - Condition 17 (Foul Sewerage Details) and Condition 18 (Surface Water Drainage Details)

As published by the council, reference DC/22/04864

Application record

Reference
DC/22/04864
Type
Discharge of Condition(s)
Status
Granted
Decision
Granted
Received
30 Sep 2022
Validated
6 Oct 2022
Decided
15 Dec 2022
Ward
Eye
Parish
Eye
Decision by
Delegated Decision

Site history

Applications at this address on the Babergh register

This site has had 11 applications since 2022: 9 approved, 1 refused.

  • DC/26/04470 Refused

    Land At Eye Airfield Castleton Way Eye Suffolk

    Application for a Non-Material Amendment relating to DC/23/05929 - To change the roof of the following plots from a pitched roof to a hipped roof for 13 plots; Plots 85-86 - Two semi-detached Grizedales, Plots 87-89 - A terrace of three Grizedales, Plots 90-91 - Two semi-detached Dallingtons, Plots 92-93 - Two semi-detached Warehams, Plots 104-105 -Two semi-detached Dallingtons, Plots 106-107 - Two semi-detached Warehams.

    Decided 4 Nov 2026 Amendments
  • DC/26/03969 Granted

    Land At Eye Airfield Castleton Way Eye Suffolk

    Discharge of Conditions Application for 3563/15 - Part discharge of Condition 12 (Renewables Details) in relation to phase 2 (plots 139-143, 145-152, 155-158, 169, 186) only.

    Decided 13 Oct 2026 Conditions
  • DC/26/00786 Granted

    Land At Eye Airfield Castleton Way Eye Suffolk

    Discharge of Conditions Application for DC/23/05929 - Condition 3 (PROW Construction Management Plan)

    Decided 17 Apr 2026 Conditions
  • DC/26/00553 Granted

    Land At Eye Airfield Castleton Way Eye Suffolk

    Discharge of Conditions Application for 3563/15 - Part discharge of Condition 12 (Renewables) for phase 2 only.

    Decided 6 Mar 2026 Conditions
  • DC/26/00431 Granted

    Land At Eye Airfield Castleton Way Eye Suffolk

    Discharge of Conditions Application for DC/23/05929 - Condition 8 (Material Schedule)

    Decided 23 Feb 2026 Conditions
  • DC/26/00364 Split decision

    Land At Eye Airfield Castleton Way Eye Suffolk

    Discharge of Conditions Application for DC/23/05929 - Discharge of Conditions 4 (Pedestrian and Cycle Connections) and 5 (Estate roads and footpaths).

    Decided 11 Mar 2026 Conditions
  • DC/25/04846 Granted

    Land At Eye Airfield Castleton Way Eye Suffolk

    Application for a Non-material Amendment relating to DC/23/05929 - This application proposes to change the house type of 10 plots to the Charndale house type (3 bed). A detailed list of proposed changes has been provided below; Removal of 9 Brightstones (5 bed) and 1 Kielder (4 bed + study), Replacing 10 units (detailed above) with 10 Charndales (3 bed), Quadruple garage of plots 35 and 36 changed to a double garage, Triple garage of plots 49 and 50 changed to a double garage, Double garage of plot 52 changed to a single garag, Double garage of plot 115 change to a single garage, Triple garage of plots 82 and 81 changed to a double garage.

    Decided 20 Nov 2025 Amendments
  • DC/25/03620 Granted

    Land At Eye Airfield Castleton Way Eye Suffolk

    Discharge of Conditions Application for DC/23/05929 - Condition 12 (Hedgehog Highways)

    Decided 29 Oct 2025 Conditions
  • DC/25/03621 Granted

    Land At Eye Airfield Castleton Way Eye Suffolk

    Discharge of Conditions Application for 3563/15 - Condition 21 (Fire Hydrants)

    Decided 2 Oct 2025 Conditions
  • DC/24/02760 Granted

    Land At Eye Airfield Castleton Way Eye Suffolk

    Discharge of Conditions Application for 3563/15 - Condition 22 (Construction Management Plan)

    Decided 15 Aug 2024 Conditions

Timeline

Dates from the published record

  1. 30 Sep 2022

    Received by Babergh

  2. 6 Oct 2022

    Validated

    Checked as complete and ready for consideration.

  3. 15 Dec 2022

    Decision issued: Granted

  4. 20 Nov 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: 3563/15 (Granted)

Documents

The council's own list, drawings first

119 documents on file for this application

Drawings (79)

  • Detailed public open space landscape proposals 06 Oct 2022
  • Detailed public open space landscape proposals 06 Oct 2022
  • Detailed public open space landscape proposals 06 Oct 2022
  • Adoptable road long sections sheet 06 Oct 2022
  • Adoptable road long sections sheet 06 Oct 2022
  • Adoptable road long sections sheet 06 Oct 2022
  • Adoptable road long sections sheet 06 Oct 2022
  • Adoptable road long sections sheet 06 Oct 2022
  • Adoptable road long sections sheet 06 Oct 2022
  • Drainage layout 05 Dec 2022
  • Engineering layout 06 Oct 2022
  • Engineering layout 06 Oct 2022
  • Foul water pump station details 06 Oct 2022
  • Foul water pump station details air valve chamber 06 Oct 2022
  • Foul water pump station details kiosk & plinth 06 Oct 2022
  • Private drainage layout 06 Oct 2022
  • Private drainage details 06 Oct 2022
  • Engineering layout-surface finishes 06 Oct 2022
  • Engineering layout-surface finishes 06 Oct 2022
  • Engineering layout-surface finishes 06 Oct 2022
  • Engineering layout-surface finishes 06 Oct 2022
  • Engineering layout-surface finishes 06 Oct 2022
  • Engineering layout-surface finishes 06 Oct 2022
  • Engineering layout-surface finishes 06 Oct 2022
  • Engineering layout-surface finishes 06 Oct 2022
  • Engineering layout-surface finishes 06 Oct 2022
  • Engineering layout-surface finishes 06 Oct 2022
  • Engineering layout-surface finishes 06 Oct 2022
  • Engineering layout-surface finishes 06 Oct 2022
  • Engineering layout-surface finishes 06 Oct 2022
  • Engineering layout-surface finishes 06 Oct 2022
  • Engineering layout-surface finishes 06 Oct 2022
  • Engineering layout-surface finishes 06 Oct 2022
  • Engineering layout 06 Oct 2022
  • Engineering layout 06 Oct 2022
  • Engineering layout 06 Oct 2022
  • Engineering layout 06 Oct 2022
  • Engineering layout 06 Oct 2022
  • Engineering layout 06 Oct 2022
  • Engineering layout 06 Oct 2022
  • Engineering layout 06 Oct 2022
  • Engineering layout 06 Oct 2022
  • Engineering layout 06 Oct 2022
  • Engineering layout 06 Oct 2022
  • Engineering layout 06 Oct 2022
  • Engineering layout 06 Oct 2022
  • Engineering layout 06 Oct 2022
  • Engineering layout basin details 06 Oct 2022
  • Engineering layout basin details 06 Oct 2022
  • Engineering layout basin details 06 Oct 2022
  • Adoptable road setting out sheet 06 Oct 2022
  • Adoptable road setting out sheet 06 Oct 2022
  • Adoptable road setting out sheet 06 Oct 2022
  • Adoptable road setting out sheet 06 Oct 2022
  • Adoptable road setting out sheet 06 Oct 2022
  • Adoptable road setting out sheet 06 Oct 2022
  • Adoptable road setting out sheet 06 Oct 2022
  • Adoptable road setting out sheet 06 Oct 2022
  • Adoptable road setting out sheet 06 Oct 2022
  • Adoptable road setting out sheet 06 Oct 2022
  • Adoptable highway details 06 Oct 2022
  • Adoptable drainage details 06 Oct 2022
  • Adoptable drainage details 06 Oct 2022
  • Adoptable suds details 06 Oct 2022
  • Private drainage layout 06 Oct 2022
  • Private drainage layout 06 Oct 2022
  • Private drainage layout 06 Oct 2022
  • Private drainage layout 06 Oct 2022
  • Private drainage layout 06 Oct 2022
  • Private drainage layout 06 Oct 2022
  • Private drainage layout 06 Oct 2022
  • Private drainage layout 06 Oct 2022
  • Private drainage layout 06 Oct 2022
  • Private drainage layout 06 Oct 2022
  • Private drainage layout 06 Oct 2022
  • Private drainage layout 06 Oct 2022
  • Private drainage layout 06 Oct 2022
  • Private drainage layout 06 Oct 2022
  • Private drainage layout 06 Oct 2022

Everything on file (119)

  • FLOOD AND WATER RESPONSE Consultee Comment · 15 Dec 2022
  • DISCHARGE OF CONDITION(S) - APPROVAL Decision · 15 Dec 2022
  • LLFA RESPONSE Consultee Comment · 08 Dec 2022
  • DRAINAGE LAYOUT Report · 05 Dec 2022
  • LLFA REFUSAL REPLY LETTER Report · 05 Dec 2022
  • ANGLIAN WATER RESPONSE Consultee Comment · 05 Dec 2022
  • FLOOD AND WATER RESPONSE Consultee Comment · 26 Oct 2022
  • COVER LETTER Correspondence · 06 Oct 2022
  • SURFACE WATER MANAGEMENT PLAN (275-E-220) Drawing · 06 Oct 2022
  • PHASE 2 GROUND INVESTIGATION REPORT (42919/3502/R1) Report · 06 Oct 2022
  • ANOMALY INVESTIGATION AND CLEARANCE REPORT Report · 06 Oct 2022
  • DRAINAGE STRATEGY (E3803-DRAINAGE STRATEGY-REV1) Report · 06 Oct 2022
  • CONSTRUCTION SURFACE WATER MANAGEMENT PLAN REVISION A Report · 06 Oct 2022
  • FOUL NETWORK 1 CALCULATIONS Report · 06 Oct 2022
  • FOUL NETWORK 2 CALCULATIONS Report · 06 Oct 2022
  • DETAILED PUBLIC OPEN SPACE LANDSCAPE PROPOSALS (1 OF 3) (P21-1325_20B) Drawing · 06 Oct 2022
  • DETAILED PUBLIC OPEN SPACE LANDSCAPE PROPOSALS (2 OF 3) (P21-1325_20B) Drawing · 06 Oct 2022
  • DETAILED PUBLIC OPEN SPACE LANDSCAPE PROPOSALS (3 OF 3) (P21-1325_20B) Drawing · 06 Oct 2022
  • STORM NETWORK 1 CALCULATIONS Drawing · 06 Oct 2022
  • STORM NETWORK 2 CALCULATIONS Drawing · 06 Oct 2022
  • STORM NETWORK 3 CALCULATIONS Drawing · 06 Oct 2022
  • ENGINEERING LAYOUT SHEET 3 OF 6 (230/022/275/E/253/P03) Drawing · 06 Oct 2022
  • ENGINEERING LAYOUT SHEET 4 OF 6 (230/022/275/E/254/P04) Drawing · 06 Oct 2022
  • ADOPTABLE MANHOLE SCHEDULE FOUL WATER (230/022/275/E/363/P02) Drawing · 06 Oct 2022
  • FOUL WATER PUMP STATION DETAILS (230/022/457/P01) Drawing · 06 Oct 2022
  • FOUL WATER PUMP STATION DETAILS AIR VALVE CHAMBER (230/022/458/P01) Drawing · 06 Oct 2022
  • FOUL WATER PUMP STATION DETAILS KIOSK & PLINTH (230/022/459/P01) Drawing · 06 Oct 2022
  • PRIVATE DRAINAGE LAYOUT SHEET 12 OF 16 (230/022/275/E/612/P01) Drawing · 06 Oct 2022
  • PRIVATE DRAINAGE DETAILS (230/022/651/P01) Drawing · 06 Oct 2022
  • SECTION 104 AGREEMENT PLAN SHEET 4 OF 16 (230/022/275/E/854/P02) Drawing · 06 Oct 2022
  • SECTION 104 AGREEMENT PLAN SHEET 9 OF 16 (230/022/275/E/859/P02) Drawing · 06 Oct 2022
  • SECTION 104 AGREEMENT PLAN SHEET 10 OF 16 (230/022/275/E/860/P02) Drawing · 06 Oct 2022
  • SECTION 104 AGREEMENT PLAN SHEET 11 OF 16 (230/022/275/E/861/P02) Drawing · 06 Oct 2022
  • SECTION 104 AGREEMENT PLAN SHEET 12 OF 16 (230/022/275/E/862/P02) Drawing · 06 Oct 2022
  • SECTION 104 AGREEMENT PLAN SHEET 13 OF 16 (230/022/275/E/863/P01) Drawing · 06 Oct 2022
  • SECTION 104 AGREEMENT PLAN SHEET 14 OF 16 (230/022/275/E/864/P02) Drawing · 06 Oct 2022
  • SECTION 104 AGREEMENT PLAN SHEET 15 OF 16 (230/022/275/E/865/P02) Drawing · 06 Oct 2022
  • SECTION 104 AGREEMENT PLAN SHEET 16 OF 16 (230/022/275/E/866/P01) Drawing · 06 Oct 2022
  • ENGINEERING LAYOUT-SURFACE FINISHES SHEET 1 OF 6 (230/022/275/E/201/P02) Drawing · 06 Oct 2022
  • ENGINEERING LAYOUT-SURFACE FINISHES SHEET 2 OF 6 (230/022/275/E/202/P02) Drawing · 06 Oct 2022
  • ENGINEERING LAYOUT-SURFACE FINISHES SHEET 3 OF 6 (230/022/275/E/203/P02) Drawing · 06 Oct 2022
  • ENGINEERING LAYOUT-SURFACE FINISHES SHEET 4 OF 6 (230/022/275/E/204/P02) Drawing · 06 Oct 2022
  • ENGINEERING LAYOUT-SURFACE FINISHES SHEET 5 OF 6 (230/022/275/E/205/P02) Drawing · 06 Oct 2022
  • ENGINEERING LAYOUT-SURFACE FINISHES SHEET 6 OF 6 (230/022/275/E/206/P02) Drawing · 06 Oct 2022
  • ENGINEERING LAYOUT-SURFACE FINISHES SHEET 7 OF 16 (230/022/275/E/207/P01) Drawing · 06 Oct 2022
  • ENGINEERING LAYOUT-SURFACE FINISHES SHEET 8 OF 16 (230/022/275/E/208/P01) Drawing · 06 Oct 2022
  • ENGINEERING LAYOUT-SURFACE FINISHES SHEET 9 OF 16 (230/022/275/E/209/P02) Drawing · 06 Oct 2022
  • ENGINEERING LAYOUT-SURFACE FINISHES SHEET 10 OF 16 (230/022/275/E/210) Drawing · 06 Oct 2022
  • ENGINEERING LAYOUT-SURFACE FINISHES SHEET 11 OF 16 (230/022/275/E/211/P02) Drawing · 06 Oct 2022
  • ENGINEERING LAYOUT-SURFACE FINISHES SHEET 12 OF 16 (230/022/275/E/212/P01) Drawing · 06 Oct 2022
  • ENGINEERING LAYOUT-SURFACE FINISHES SHEET 13 OF 16 (230/022/275/E/213/P01) Drawing · 06 Oct 2022
  • ENGINEERING LAYOUT-SURFACE FINISHES SHEET 14 OF 16 (230/022/275/E/214/P01) Drawing · 06 Oct 2022
  • ENGINEERING LAYOUT-SURFACE FINISHES SHEET 15 OF 16 (230/022/275/E/215/P02) Drawing · 06 Oct 2022
  • ENGINEERING LAYOUT-SURFACE FINISHES SHEET 16 OF 16 (230/022/275/E/216/P01) Drawing · 06 Oct 2022
  • ENGINEERING LAYOUT SHEET 1 OF 6 (230/022/275/E/251/P05) Drawing · 06 Oct 2022
  • ENGINEERING LAYOUT SHEET 2 OF 6 (230/022/275/E/252/P03) Drawing · 06 Oct 2022
  • ENGINEERING LAYOUT SHEET 5 OF 6 (230/022/275/E/255/P04) Drawing · 06 Oct 2022
  • ENGINEERING LAYOUT SHEET 6 OF 6 (230/022/275/E/256/P03) Drawing · 06 Oct 2022
  • ENGINEERING LAYOUT SHEET 7 OF 16 (230/022/275/E/257/P02) Drawing · 06 Oct 2022
  • ENGINEERING LAYOUT SHEET 8 OF 16 (230/022/275/E/258/P02) Drawing · 06 Oct 2022
  • ENGINEERING LAYOUT SHEET 9 OF 16 (230/022/275/E/259/P02) Drawing · 06 Oct 2022
  • ENGINEERING LAYOUT SHEET 10 OF 16 (230/022/275/E/260/P02) Drawing · 06 Oct 2022
  • ENGINEERING LAYOUT SHEET 11 OF 16 (230/022/275/E/261 P02) Additional Information · 06 Oct 2022
  • ENGINEERING LAYOUT SHEET 12 OF 16 (230/022/275/E/262 P01) Additional Information · 06 Oct 2022
  • ENGINEERING LAYOUT SHEET 13 OF 16 (230/022/275/E/263 P01) Additional Information · 06 Oct 2022
  • ENGINEERING LAYOUT SHEET 14 OF 16 (230/022/275/E/264 P02) Additional Information · 06 Oct 2022
  • ENGINEERING LAYOUT SHEET 15 OF 16 (230/022/275/E/265 P02) Additional Information · 06 Oct 2022
  • ENGINEERING LAYOUT SHEET 16 OF 16 (230/022/275/E/266 P01) Additional Information · 06 Oct 2022
  • FLOOD EXCEEDANCE PLAN SHEET 1 OF 3 (230/022/275/E/271 P01) Additional Information · 06 Oct 2022
  • FLOOD EXCEEDANCE PLAN SHEET 2 OF 3 (230/022/275/E/272 P01) Additional Information · 06 Oct 2022
  • FLOOD EXCEEDANCE PLAN SHEET 3 OF 3 (230/022/275/E/273 P01) Additional Information · 06 Oct 2022
  • ENGINEERING LAYOUT- BASIN DETAILS SHEET 1 OF 3 (230/022/275/E/454 A01) Additional Information · 06 Oct 2022
  • ENGINEERING LAYOUT- BASIN DETAILS SHEET 2 OF 3 (230/022/275/E/455 A01) Additional Information · 06 Oct 2022
  • ENGINEERING LAYOUT- BASIN DETAILS SHEET 3 OF 3 (230/022/275/E/456 A01) Additional Information · 06 Oct 2022
  • ADOPTABLE ROAD LONG SECTIONS SHEET 1 (230/022/275/E/301 P05) Additional Information · 06 Oct 2022
  • ADOPTABLE ROAD LONG SECTIONS SHEET 2 (230/022/275/E/302 P06) Additional Information · 06 Oct 2022
  • ADOPTABLE ROAD LONG SECTIONS SHEET 3 (230/022/275/E/303 P02) Additional Information · 06 Oct 2022
  • ADOPTABLE ROAD LONG SECTIONS SHEET 4 (230/022/275/E/304 P04) Additional Information · 06 Oct 2022
  • ADOPTABLE ROAD LONG SECTIONS SHEET 5 (230/022/275/E/305 P02) Additional Information · 06 Oct 2022
  • ADOPTABLE ROAD LONG SECTIONS SHEET 6 (230/022/275/E/306 P02) Additional Information · 06 Oct 2022
  • ADOPTABLE ROAD SETTING OUT SHEET 1 (230/022/275/E/351 P02) Additional Information · 06 Oct 2022
  • ADOPTABLE ROAD SETTING OUT SHEET 2 (230/022/275/E/352 P02) Additional Information · 06 Oct 2022
  • ADOPTABLE ROAD SETTING OUT SHEET 3 (230/022/275/E/353 P02) Additional Information · 06 Oct 2022
  • ADOPTABLE ROAD SETTING OUT SHEET 4 (230/022/275/E/354 P02) Additional Information · 06 Oct 2022
  • ADOPTABLE ROAD SETTING OUT SHEET 5 (230/022/275/E/355 P02) Additional Information · 06 Oct 2022
  • ADOPTABLE ROAD SETTING OUT SHEET 6 (230/022/275/E/356 P02) Additional Information · 06 Oct 2022
  • ADOPTABLE ROAD SETTING OUT SHEET 7 (230/022/275/E/357 P01) Additional Information · 06 Oct 2022
  • ADOPTABLE ROAD SETTING OUT SHEET 8 (230/022/275/E/358 P01) Additional Information · 06 Oct 2022
  • ADOPTABLE ROAD SETTING OUT SHEET 9 (230/022/275/E/359 P01) Additional Information · 06 Oct 2022
  • ADOPTABLE ROAD SETTING OUT SHEET 10 (230/022/275/E/360 P01) Additional Information · 06 Oct 2022
  • ADOPTABLE MANHOLE SCHEDULE (230/022/275/E/361 P03) Additional Information · 06 Oct 2022
  • ADOPTABLE MANHOLE SCHEDULE SURFACE WATER (230/022/275/E/362 P02) Additional Information · 06 Oct 2022
  • ADOPTABLE HIGHWAY DETAILS (230/022/401 P02) Additional Information · 06 Oct 2022
  • ADOPTABLE DRAINAGE DETAILS SHEET 1 OF 2 (230/022/451/P02) Drawing · 06 Oct 2022
  • ADOPTABLE DRAINAGE DETAILS SHEET 2 OF 2 (230/022/452/P01) Drawing · 06 Oct 2022
  • ADOPTABLE SUDS DETAILS (230/022/453/P03) Drawing · 06 Oct 2022
  • PRIVATE DRAINAGE LAYOUT SHEET 1 OF 6 (230/022/275/E/601 P04) Drawing · 06 Oct 2022
  • PRIVATE DRAINAGE LAYOUT SHEET 2 OF 6 (230/022/275/E/602 P02) Drawing · 06 Oct 2022
  • PRIVATE DRAINAGE LAYOUT SHEET 3 OF 6 (230/022/275/E/603 P02) Drawing · 06 Oct 2022
  • PRIVATE DRAINAGE LAYOUT SHEET 4 OF 6 (230/022/275/E/604 P03) Drawing · 06 Oct 2022
  • PRIVATE DRAINAGE LAYOUT SHEET 5 OF 6 (230/022/275/E/605 P03) Drawing · 06 Oct 2022
  • PRIVATE DRAINAGE LAYOUT SHEET 6 OF 6 (230/022/275/E/606 P03) Drawing · 06 Oct 2022
  • PRIVATE DRAINAGE LAYOUT SHEET 7 OF 16 (230/022/275/E/607 P03) Drawing · 06 Oct 2022
  • PRIVATE DRAINAGE LAYOUT SHEET 8 OF 16 (230/022/275/E/608 P03) Drawing · 06 Oct 2022
  • PRIVATE DRAINAGE LAYOUT SHEET 9 OF 16 (230/022/275/E/609 P03) Drawing · 06 Oct 2022
  • PRIVATE DRAINAGE LAYOUT SHEET 10 OF 16 (230/022/275/E/610 P03) Drawing · 06 Oct 2022
  • PRIVATE DRAINAGE LAYOUT SHEET 11 OF 16 (230/022/275/E/611 P02) Drawing · 06 Oct 2022
  • PRIVATE DRAINAGE LAYOUT SHEET 13 OF 16 (230/022/275/E/613 P01) Drawing · 06 Oct 2022
  • PRIVATE DRAINAGE LAYOUT SHEET 14 OF 16 (230/022/275/E/614 P03) Drawing · 06 Oct 2022
  • PRIVATE DRAINAGE LAYOUT SHEET 15 OF 16 (230/022/275/E/615 P03) Drawing · 06 Oct 2022
  • PRIVATE DRAINAGE LAYOUT SHEET 16 OF 16 (230/022/275/E/616 P01) Drawing · 06 Oct 2022
  • SECTION 104 AGREEMENT PLAN SHEET 1 OF 16 (230/022/275/E/851 P02) Drawing · 06 Oct 2022
  • SECTION 104 AGREEMENT PLAN SHEET 2 OF 16 (230/022/275/E/852 P02) Drawing · 06 Oct 2022
  • SECTION 104 AGREEMENT PLAN SHEET 3 OF 16 (230/022/275/E/853 P02) Drawing · 06 Oct 2022
  • SECTION 104 AGREEMENT PLAN SHEET 5 OF 16 (230/022/275/E/855 P02) Drawing · 06 Oct 2022
  • SECTION 104 AGREEMENT PLAN SHEET 6 OF 16 (230/022/275/E/856 P02) Drawing · 06 Oct 2022
  • SECTION 104 AGREEMENT PLAN SHEET 7 OF 16 (230/022/275/E/857 P02) Drawing · 06 Oct 2022
  • SECTION 104 AGREEMENT PLAN SHEET 8 OF 16 (230/022/275/E/858 P02) Drawing · 06 Oct 2022
  • APPLICATION FORM Application Form · 30 Sep 2022

Watch members (£5 a month) open the document list from here.

Open the documents

Working a patch? Trade sends you the drawings on every job in your area. 14 days free.

What this grant of permission means

Babergh granted permission on 15 December 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Land At Eye Airfield Castleton Way Eye Suffolk

    DC/25/03621 Submitted 14 Aug 2025 50 yards away

    Discharge of Conditions Application for 3563/15 - Condition 21 (Fire Hydrants)

    Granted Conditions Drawings (1) 9 docs
  • Land At Langton Grove Langton Grove Eye

    DC/23/02317 Submitted 16 May 2023 50 yards away

    Discharge of Conditions Application for 3563/15 - Conditions 9 (Ecological Mitigation - Skylarks), 12 (Renewables),15 (Archaeology), 16 (Waste Management), 17 (Foul Sewerage Details), 18 (Surface Water Drainage), 19 (Tree Protection), 20 (Landscape Management), 21 (Fire Hydrants), 22 (Construction Management), 23 (Land Contamination 1), 24 (Land Contamination 2), 25 (Land Contamination 3), 26 (Land Contamination 4), 31 (Highways 5) and 32 (Highways 6)

    Split decision Conditions Trees Drawings (22) 98 docs
  • Land At Langton Grove Langton Grove Eye

    DC/23/02317 Submitted 16 May 2023 50 yards away

    Discharge of Conditions Application for 3563/15 - Conditions 9 (Ecological Mitigation - Skylarks), 12 (Renewables),15 (Archaeology), 16 (Waste Management), 17 (Foul Sewerage Details), 18 (Surface Water Drainage), 19 (Tree Protection), 20 (Landscape Management), 21 (Fire Hydrants), 22 (Construction Management), 23 (Land Contamination 1), 24 (Land Contamination 2), 25 (Land Contamination 3), 26 (Land Contamination 4), 31 (Highways 5) and 32 (Highways 6)

    Split decision Conditions Trees 98 docs
  • Land At Eye Airfield Castleton Way Eye Suffolk

    DC/26/00553 Submitted 10 Feb 2026 50 yards away

    Discharge of Conditions Application for 3563/15 - Part discharge of Condition 12 (Renewables) for phase 2 only.

    Granted Conditions 23 docs
  • Land At Eye Airfield Castleton Way Eye Suffolk

    DC/26/00553 Submitted 10 Feb 2026 50 yards away

    Discharge of Conditions Application for 3563/15 - Part discharge of Condition 12 (Renewables) for phase 2 only.

    Granted Conditions 23 docs
  • Land At Eye Airfield Castleton Way Eye Suffolk

    DC/24/02760 Submitted 18 Jun 2024 50 yards away

    Discharge of Conditions Application for 3563/15 - Condition 22 (Construction Management Plan)

    Granted Conditions 13 docs

In Babergh

  • DC/26/04710 Granted

    The Poultry Farm Brent Eleigh Road Lavenham Sudbury Suffolk CO10 9PE

    Discharge of Conditions Application for DC/26/02969 - Condition 6 (Construction Management Plan)

    Received 2 Nov, published by the council 20 Nov 2026 Conditions
  • DC/26/04989 Awaiting decision

    Moat Cottage Great Green Cockfield Bury St Edmunds Suffolk IP30 0HN

    Discharge of Conditions Application for DC/26/02681 - Conditions 4 (Temporary Roofing) and 5 (Biodiversity Enhancement Strategy)

    Received 18 Nov, published by the council 20 Nov 2026 Conditions
  • DC/26/04980 Awaiting decision

    2 Doctors Lodge Skinners Lane Metfield Harleston Suffolk IP20 0LH

    Discharge of Conditions Application for DC/26/02753 - Conditions 3 (Roof Repairs) and 4 (Shortfall Materials)

    Received 18 Nov, published by the council 20 Nov 2026 Conditions
  • DC/26/04984 Awaiting decision

    Chapel Farm Chapel Lane Horham Eye Suffolk IP21 5ES

    Discharge of Conditions Application for DC/26/01373 - Condition 3 - (Fenestration Finish), 4 (Pamments) and 7 (Notification of Roof Stripping)

    Received 18 Nov, published by the council 20 Nov 2026 Conditions
  • DC/26/04986 Awaiting decision

    Moat Cottage Great Green Cockfield Bury St Edmunds Suffolk IP30 0HN

    Discharge of Conditions Application for DC/26/02682 - Conditions 3 (Schedule of works - Timber Frame), 4 (Schedule of works - Brickwork) and 5 (Strengthening Works)

    Received 18 Nov, published by the council 20 Nov 2026 Conditions