Skip to content
PlanIndex Get alerts
Menu

Planning application

Sioux, Ashford Road, Bilsington, TN25 7JD

Refused Ashford PA/2025/2273 Full planning permission

Works: Extension Demolition Domestic

Read from the description, not a valuation. How we read the register

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

The conversion and extension of redundant stables into a single dwelling house, alongside a change of use of land to form associated amenity, parking, landscaping and biodiversity enhancements following demolition of some outbuildings and removal of sand school.

As published by the council, reference PA/2025/2273

Application record

Reference
PA/2025/2273
Type
Full planning permission
Status
Decision Made
Decision
Refuse
Received
9 Dec 2025
Validated
18 Dec 2025
Decided
11 Feb 2026
Ward
Mersham, Sevington South with Finberry;Saxon Shore
Parish
Bilsington;Mersham
Decision by
Delegated Decision
Postcode
TN25 7JD

Timeline

Dates from the published record

  1. 9 Dec 2025

    Received by Ashford

  2. 18 Dec 2025

    Validated

    Checked as complete and ready for consideration.

  3. 11 Feb 2026

    Decision issued: Refuse

  4. 13 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

22 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Ashford

  • PA/2026/0520 Withdrawn

    Ashenden Farm, Bell Lane, Biddenden, TN27 8LD

    Construction of a 20m by 40m menage / riding arena

    16 Mar 2026 Full applications
  • PA/2026/0312 Withdrawn

    89-91, High Street, Ashford, TN24 8SA

    Proposed change of use of the existing offices (Class E) to four residential flats (Use Class C3) and associated works

    17 Feb 2026 Full applications
  • PA/2026/0579 Granted

    Oakwood, Sparrow Hatch Lane, Bethersden, TN26 3ED

    Change of use of existing studio to a one bedroom self-contained holiday let together with the replacement of a window with a French door and decking

    25 Mar 2026 Full applications
  • PA/2026/0284 Granted

    Horton View, Fiddling Lane, Brabourne, Ashford, TN25 6AP

    Change of use to expand established residential curtilage and retention of ancillary mixed use outbuilding (Retrospective)

    12 Feb 2026 Full applications
  • PA/2026/1116 Granted

    International House, Dover Place, Ashford, TN23 1HT

    Proposed relocation of the plant space of International House from the ground floor to roof.

    23 Jun 2026 Full applications