Skip to content
PlanIndex Get alerts
Menu

Planning application

A28, Singleton, Great Chart with Singleton, KENT, TN23 5HY

Granted Ashford NOT/2023/0339 Prior notification: Development by telecoms operators

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Prior Notification for proposed 15.0m high Phase 8 Monopole, 2no. equipment cabinets, associated meter cabinet and ancillary development thereto.

As published by the council, reference NOT/2023/0339

Application record

Reference
NOT/2023/0339
Type
Prior notification: Development by telecoms operators
Status
Decision Made
Decision
Prior Approval Is Given
Received
21 Feb 2023
Validated
2 Mar 2023
Decided
21 Apr 2023
Ward
Weald Central
Parish
Great Chart with Singleton
Decision by
Delegated Decision
Postcode
TN23 5HY

Timeline

Dates from the published record

  1. 21 Feb 2023

    Received by Ashford

  2. 2 Mar 2023

    Validated

    Checked as complete and ready for consideration.

  3. 21 Apr 2023

    Decision issued: Prior Approval Is Given

  4. 28 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

19 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About telecoms applications

How this application type works

Telecommunications applications cover masts, antennas and cabinets, most of which come forward as prior approval cases under permitted development rules. The council typically has 56 days to consider siting and appearance only. The need for the network itself is treated as established, so objections carry most weight where they address visual impact or siting.

More on telecoms applications in our guide

Nearby applications

Within 500 metres

In Ashford

  • NOT/2026/0921 Granted

    Telecommunications Mast, Leacon Farm, Leacon Lane, Charing, TN27 0EP

    Prior Notification for the installation of a replacement 22.5mm monopole mast (22.9m to top of antenna) with headframe accommodating 3 no. new antennas (existing to be replaced), 2 no. 300mm and 1 no. 600mm diameter dish antennas, associated radio units and ancillary development thereto.

    21 May 2026 Telecoms
  • NOT/2023/0359 Granted

    Grass Verge at A2070 , A2070, Sevington, Ashford, TN24 0TP

    Prior Notification - Telecommunications mast and equipment/power cabinets including 20m high slim-line monopole, supporting 6no antennas, 2no equipment cabinets and 1no electric meter cabinet.

    23 Feb 2023 Telecoms
  • NOT/2023/0301 Granted

    CANTERBURY ROAD, BYBROOK, KENT, TN24 9SG

    Prior Notification for Proposed 15.0m phase 8 street works monopole, 2no. equipment cabinets with associated meter cabinet and ancillary development thereto.

    15 Feb 2023 Telecoms
  • NOT/2023/0302 Withdrawn

    LOUDON WAY, GODINTON PARK, KENT, TN23 3QS

    Prior Notification for a proposed 15.0m phase 9 street works monopole, 2no. equipment cabinets with associated meter cabinet and ancillary development thereto.

    15 Feb 2023 Telecoms
  • NOT/2023/0230 Granted

    Worten Home Farm, Great Chart, Kent, TN23 3BU

    Prior notification for proposed upgrade of an existing base station consisting of the removal of the 15m lattice and installation of a 30m lattice comprising 3 no antennas and 2 no dishes together with the internal upgrade to the existing ground based cabinets and ancillary development thereto.

    6 Feb 2023 Telecoms