Proposal
Erection of rear extension
As published by the council, reference Y/62/21/HH
Timeline
Dates from the published record
-
11 May 2021
Received by Arun
-
20 May 2021
Validated
Checked as complete and ready for consideration.
-
14 Jul 2021
Decision issued: Permitted
-
31 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Y/80/21/DOC Granted
Land East of North End Road and West of Church Lane Nursery Yapton BN18 0GA
Approval of details reserved by condition imposed under ref Y/18/20/PL relating to Condition Nos 7 - surface water drainage and 8 - maintenance & management of surface water drainage.
-
Y/13/23/TC Granted
Holmlea Church Road Yapton BN18 0EN
Fell 1 No Lime tree (T1) in the Main Road/Church Road, Yapton Conservation Area,
-
Y/141/22/DOC Granted
Stakers Farm North End Road Yapton BN18 0DU
Approval of details reserved by condition imposed under ref Y/107/21/PL relating to Condition Nos 3 - flint flooring, stall dividers, exposed brick walls, timber ceiling and first floor of Barn 1 - 4 - details of repurposing flint flooring and materials, 5 - surface water drainage, 6 - details of new external doors and windows, 7 - details of exposed beams and joists, 8 - location of gas/electricity metres, 9 - boundary treatments, 10 - samples of materials for paving and 14 - electric vehicle charging.
-
Y/52/22/DOC Granted
Stakers Farm North End Road Yapton BN18 0DU
Approval of details reserved by condition imposed under Y/105/19/PL relating to conditions 3-flint flooring and stall dividers, timber ceiling details, 4-flint flooring details, 5-surface water drainage and 9-electric vehicle charging.
-
Y/22/23/DOC Granted
Stakers Farm North End Road Yapton BN18 0DU
Approval of details reserved by condition imposed under reference Y/124/22/PL, relating to condition nos 11 - Building regulation compliance and 14 - Decentralized, renewable and low carbon energy sources.
-
Y/44/24/DOC Granted
Clays Farm North End Road Yapton BN18 0DT
Approval of details reserved by condition imposed under Y/62/18/OUT relating to condition 10-surface water drainage.
Other full applications applications
In Arun
-
K/7/26/HH Withdrawn
Seaways 50 Coastal Road Kingston BN16 1SN
Proposed extensions and remodelling of existing family dwelling house.
-
BR/99/26/PL Granted
78 Aldwick Road Bognor Regis PO21 2PE
Shop front modernisation. This application is in CIL Zone 4 (Zero Rated) as other development.
-
LU/133/26/PL Granted
Office 34 New Road Littlehampton BN17 5AT
Change of use from part E(c) Business and part C4 Residential, to C3 Residential. This application is in CIL Zone 4 and is CIL Liable as a new dwelling.
-
LU/130/26/HH Granted
11 Fleet Close Littlehampton BN17 6SD
Proposed single storey side extension.
-
AW/92/26/HH Granted
9 Marquis Way Aldwick PO21 4AT
Enlargement of first floor dormer window above garage to include french doors, sidelights and glass balustrade.