Skip to content
PlanIndex Get alerts
Menu

Planning application

1 Hudson Drive Rustington BN16 2AX

Granted Arun R/210/25/HH Full

Works: Extension Loft or dormer Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single-storey front and side extension, additional rooflights and rear dormer, front elevation changes and alterations to external materials.

As published by the council, reference R/210/25/HH

Application record

Reference
R/210/25/HH
Type
Full
Status
ApproveConditionally
Decision
Permitted
Received
24 Nov 2025
Validated
24 Nov 2025
Decided
15 Jan 2026
Parish
Rustington
Postcode
BN16 2AX

Timeline

Dates from the published record

  1. 24 Nov 2025

    Received by Arun

  2. 15 Jan 2026

    Decision issued: Permitted

  3. 12 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

Documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 5 Hudson Drive Rustington BN16 2AX

    R/143/21/CLP Submitted 10 Jun 2021 0m away

    Lawful development certificate for a proposed single storey extension to the rear of the property, including new plumbing, central heating, replacement windows.

    Granted Outline Extension Windows or glazing
    Small domestic
  • 1 Hudson Drive Rustington BN16 2AX

    R/199/25/NMA Submitted 5 Nov 2025 0m away

    Non material amendment following the grant of R/73/25/HH to change colour of window to Anthracite Gray, change porch design including flat roof to front and side extensions, removal of new window to East and West elevations and reconfiguration of kitchen doors/window.

    Refused Amendments Extension Windows or glazing
    Small domestic
  • 4 Hudson Drive Rustington BN16 2AX

    R/105/26/HH 2m away

    88% historically approved

    Single storey and double storey extension to rear elevation.

    Decided Householder Extension
    Small domestic
  • 46 Jervis Avenue Rustington BN16 2AS

    R/197/25/S73 Submitted 3 Nov 2025 77m away

    Variation of condition 2 imposed under R/37/25/HH relating to approved plans.

    Granted Amendments
  • 26 Pigeonhouse Lane Rustington BN16 2AZ

    R/119/21/PL Submitted 24 May 2021 168m away

    Conversion of existing double garage into holiday let accommodation replacing the existing shed with a conservatory. This site is in CIL Zone 4 (Zero Rated) as other development.

    Granted Full applications Extension
    Small domestic
  • 20 Tasman Close Rustington BN16 2BD

    R/114/26/HH Submitted 10 Aug 2026 197m away

    89% historically approved · decision due ~21 Oct

    Construction of single storey front, side and rear extension with internal changes and replacement of existing roof and windows with new rooflight and improvements to the driveway.

    Decided Full applications Extension Loft or dormer +1
    Small domestic

In Arun

  • P/56/26/PL Granted

    Land to the west of Inglenook Hotel 255 Pagham Road Pagham PO21 3QB

    Demolition of existing storage buildings and construction of 6 No. dwellings and associated works (resubmission following P/43/25/PL). This application is a Departure from the Development Plan and is in CIL Zone 5 and is CIL Liable as new dwellings.

    24 Apr 2026 Full applications
  • LU/96/26/PL Granted

    Flint Acre Toddington Lane Littlehampton BN17 7PN

    Retention of change of use from agricultural land to containerised storage facility (B8). This application may affect the setting of a listed building and is in CIL Zone 2 (Zero Rated) as other development.

    22 Apr 2026 Full applications
  • LU/95/26/PL Granted

    P and O Scaffolding Ltd Toddington Lane Littlehampton BN17 7PN

    Retention of change of use from agricultural land to scaffolding yard (Sui Generis). This application may affect the setting of a listed building and is in CIL Zone 2 (Zero Rated) as other development.

    22 Apr 2026 Full applications
  • FP/66/26/PL Refused

    Rabbit Island Rear of 84 Brooks Lane Bognor Regis PO22 8DN

    Retention of an existing agricultural barn previously approved under FP/106/23/AG with a total roof height of 3.99m (compared to 2.9m as permitted). This application is in CIL Zone 5 (Zero Rated) as other development.

    26 May 2026 Full applications
  • P/66/26/PL Granted

    Land to the North of Nyetimber Forge Barton Close Pagham PO21 4NH

    Extension and retention of resurfacing of land to form a permeable gravel area and front boundary fence (resubmission following P/165/25/PL). This application may affect the setting of listed buildings and is in CIL Zone 4 (Zero Rated) as other development.

    19 May 2026 Full applications