Proposal
Removal of roof tiles, and installation of solar panels on the south facing roof of the main hall. This application is in CIL Zone 4 (Zero Rated) as other development.
As published by the council, reference FG/5/23/PL
Timeline
Dates from the published record
-
24 Jan 2023
Received by Arun
-
21 Mar 2023
Decision issued: Permitted
-
31 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
FG/124/24/PL Granted
60 Ferring Street Ferring BN12 5JP
Roof extensions to enclose walkway and the replacement external staircase. This application is in CIL zone 4 (zero rated) as other development.
-
FG/48/26/DOC Granted
58 Ferring Street Ferring BN12 5JP
Approval of details reserved by condition under FG/19/21/PL relating to condition 3 - Noise & Vibration.
-
FG/60/26/S73 Decided
58 Ferring Street Ferring BN12 5JP
Variation of condition 5 imposed under FG/19/21/PL relating to hours of operation.
-
FG/19/21/PL Granted
First Floor Flat 60 Ferring Street Ferring BN12 5JP
Change of use of flat above restaurant to a bar. This site is in CIL Zone 4 (Zero Rated) as other development.
-
FG/176/22/T Granted
Quiteways 1 Sea Lane Close Ferring BN12 5DT
Fell 1 No. Monterey cypress and grub out root.
-
FG/104/21/T Granted
The Old Flint House Church Lane Ferring BN12 5HR
1 No. Sycamore (T1) - Remove major deadwood and cut back from lamp to clear by 0.5m and 1 No. Mulberry (T7) remove dead wood and reduce lateral spread over lawn of The Old Flinthouse (eastern aspect only)to 4m and clear BT lines running through the centre of tree by up to 0.5m max.
Other full applications applications
In Arun
-
K/7/26/HH Withdrawn
Seaways 50 Coastal Road Kingston BN16 1SN
Proposed extensions and remodelling of existing family dwelling house.
-
BR/99/26/PL Granted
78 Aldwick Road Bognor Regis PO21 2PE
Shop front modernisation. This application is in CIL Zone 4 (Zero Rated) as other development.
-
LU/133/26/PL Granted
Office 34 New Road Littlehampton BN17 5AT
Change of use from part E(c) Business and part C4 Residential, to C3 Residential. This application is in CIL Zone 4 and is CIL Liable as a new dwelling.
-
LU/130/26/HH Granted
11 Fleet Close Littlehampton BN17 6SD
Proposed single storey side extension.
-
AW/92/26/HH Granted
9 Marquis Way Aldwick PO21 4AT
Enlargement of first floor dormer window above garage to include french doors, sidelights and glass balustrade.