Proposal
Front Porch Extension.
As published by the council, reference BE/35/26/HH
Timeline
Dates from the published record
-
18 May 2026
Received by Arun
-
4 Jun 2026
Validated
Checked as complete and ready for consideration.
-
24 Jul 2026
Decision issued: Permitted
-
31 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
BE/76/21/HH Granted
111 Stroud Green Drive Bersted PO21 5SZ
Loft conversion with 2 x front dormers and 1 x rear dormer with juliet balcony and alterations to fenestration/openings
-
BR/115/26/HH Decided
32 Pevensey Road Bognor Regis PO21 5NU
First floor extension.
-
BR/114/26/PD Decided
The Regis School Westloats Lane Bognor Regis PO21 5LH
Schedule 2, Part 14 Class J for installation of solar panels on the school roofs.
-
BE/80/21/DOC Granted
47 South Way Bersted PO21 5EY
Approval of details reserved by condition imposed under BE/43/20/PL relating to Condition Nos 3 - materials & finishes, 4 - screen walls & fences, 5 - dustbin storage, 7 - covered & secure cycle parking, 9 - site set up during construction, 10 - surface water drainage, 11 - contamination and 12 - electric vehicle charging.
-
BE/93/24/NMA Granted
Chalcroft Nurseries Land at Chalcraft Lane Bersted PO21 5TS
Non-material amendment following the grant of BE/1/23/RES relating to the repositioning of the pump station and visitor parking bays.
-
BE/49/26/DOC Decided
Chalcroft Nurseries Chalcraft Lane Bersted PO21 5TS
Approval of details reserved by condition under BE/13/24/S73 (amended by BE/77/25/NMA) relating to conditions 9- Contamination, 12- Noise Assessment, 16- Lighting Scheme, 26- Arboricultural Impact Assessment and Method Statement, 28- Reptile Mitigation, 31- Biodiversity Enhancement Measures, 33- Fire Hydrant/Stored Water Supply, 35- Broadband Provision and 36- Employment and Skills Plan.
Other full applications applications
In Arun
-
K/7/26/HH Withdrawn
Seaways 50 Coastal Road Kingston BN16 1SN
Proposed extensions and remodelling of existing family dwelling house.
-
BR/99/26/PL Granted
78 Aldwick Road Bognor Regis PO21 2PE
Shop front modernisation. This application is in CIL Zone 4 (Zero Rated) as other development.
-
LU/133/26/PL Granted
Office 34 New Road Littlehampton BN17 5AT
Change of use from part E(c) Business and part C4 Residential, to C3 Residential. This application is in CIL Zone 4 and is CIL Liable as a new dwelling.
-
LU/130/26/HH Granted
11 Fleet Close Littlehampton BN17 6SD
Proposed single storey side extension.
-
AW/92/26/HH Granted
9 Marquis Way Aldwick PO21 4AT
Enlargement of first floor dormer window above garage to include french doors, sidelights and glass balustrade.