Planning application
Tara Hook Lane Aldingbourne PO20 3TE
Works: Extension Loft or dormer Demolition Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition of existing store/garage extensions and the construction of a first floor rear extension, alterations to roof including roof extensions, front and rear dormers, alterations to front porch and alterations to fenestration.
As published by the council, reference AL/78/25/HH
Application record
- Reference
- AL/78/25/HH
- Type
- Full
- Status
- ApproveConditionally
- Decision
- Permitted
- Received
- 12 Aug 2025
- Validated
- 14 Aug 2025
- Decided
- 3 Oct 2025
- Parish
- Aldingbourne
- Postcode
- PO20 3TE
Timeline
Dates from the published record
-
12 Aug 2025
Received by Arun
-
14 Aug 2025
Validated
Checked as complete and ready for consideration.
-
3 Oct 2025
Decision issued: Permitted
-
12 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Land to West of Hook Lane Lane Hook Westergate PO20 3TE
Approval of details reserved by condition imposed under reference AL/79/20/OUT relating to condition number 21 - surface water drainage system (as built drawings).
Refused Conditions -
St Helier Hook Lane Aldingbourne PO20 3TE
Lawful development certificate for a proposed conversion of free standing garage in to sleeping accomodation.
Granted Outline -
Springfield Hook Lane Aldingbourne PO20 3TE
Approval of details reserved by condition imposed under ref AL/64/20/PL relating to Condition Nos 5 - pre-commencement site meeting, 15 - screen walls & fences, 16 - hard & soft landscape, 18 - energy efficiency measures, 21 - broadband and 25 external lighting.
Granted Conditions -
Springfield Hook Lane Aldingbourne PO20 3TE
Approval of details reserved by condition imposed under AL/64/20/PL relating to conditions 9-foul drainage, 10-surface water drainage, 11-flows discharge & 12-maintenance & management of surface water drainage.
Granted Conditions -
Land West of Hook Lane Aldingbourne PO20 3BB
Approval of details reserved by condition imposed under ref AL/79/20/OUT relating to Condition Nos 5 - archaeology, 6 - foul drainage, 7 - surface water drainage, 8 - discharge flows to watercourses, 9 - maintenance and management of surface water drainage, 10 - decentralised and renewable or low carbon energy, 11 - Construction & Environmental Management Plan, 12 - contamination, 13 - noise levels, 14 - retained hedgerows, 16 - levels.
Granted Conditions -
Land West of Hook Lane Aldingbourne PO20 3BB
Approval of details reserved by condition imposed under reference AL/135/22/RES, relating to condition nos: 4 - Turning space mechanism, 5 - Covered & secure cycle storage and 7 - Refuse & recycling storage.
Granted Conditions
Other full applications applications
In Arun
-
P/56/26/PL Granted
Land to the west of Inglenook Hotel 255 Pagham Road Pagham PO21 3QB
Demolition of existing storage buildings and construction of 6 No. dwellings and associated works (resubmission following P/43/25/PL). This application is a Departure from the Development Plan and is in CIL Zone 5 and is CIL Liable as new dwellings.
-
LU/96/26/PL Granted
Flint Acre Toddington Lane Littlehampton BN17 7PN
Retention of change of use from agricultural land to containerised storage facility (B8). This application may affect the setting of a listed building and is in CIL Zone 2 (Zero Rated) as other development.
-
LU/95/26/PL Granted
P and O Scaffolding Ltd Toddington Lane Littlehampton BN17 7PN
Retention of change of use from agricultural land to scaffolding yard (Sui Generis). This application may affect the setting of a listed building and is in CIL Zone 2 (Zero Rated) as other development.
-
FP/66/26/PL Refused
Rabbit Island Rear of 84 Brooks Lane Bognor Regis PO22 8DN
Retention of an existing agricultural barn previously approved under FP/106/23/AG with a total roof height of 3.99m (compared to 2.9m as permitted). This application is in CIL Zone 5 (Zero Rated) as other development.
-
P/66/26/PL Granted
Land to the North of Nyetimber Forge Barton Close Pagham PO21 4NH
Extension and retention of resurfacing of land to form a permeable gravel area and front boundary fence (resubmission following P/165/25/PL). This application may affect the setting of listed buildings and is in CIL Zone 4 (Zero Rated) as other development.