Planning application
Woodgate Centre Oak Tree Lane Woodgate PO20 3GU
Relates to AL/107/21/PL
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Approval of details reserved by condition under AL/107/21/PL relating to conditions 22- Piling and 37- Biodiversity Enhancement Strategy.
As published by the council, reference AL/34/26/DOC
Application record
- Reference
- AL/34/26/DOC
- Type
- Conditions
- Status
- DOC Approved
- Decision
- Permitted
- Received
- 18 May 2026
- Validated
- 26 May 2026
- Decided
- 4 Sep 2026
- Parish
- Aldingbourne
- Postcode
- PO20 3GU
Site history
Applications at this address on the Arun register
This site has had 11 applications since 2021: 5 approved, 1 refused.
-
AL/57/26/A Awaiting decision
Woodgate Centre Oak Tree Lane Woodgate PO20 3GU
Installation of various signage.
-
AL/31/26/DOC Granted
Woodgate Centre Oak Tree Lane Woodgate PO20 3GU
Approval of details reserved by condition imposed under AL/107/21/PL relating to condition 3-materials and finishes.
-
AL/17/26/AOO Granted
Woodgate Centre Oak Tree Lane Woodgate PO20 3GU
Application for the approval of Public Open Space Scheme of Works (Schedule 3, Paragraph 1.1) and Play Areas Scheme of Works (Schedule 3, Paragraph 3.1(a)) as required under obligations set out in the Section 106 agreement dated 9th October 2023 in relation to planning permission AL/107/21/PL.
-
AL/133/25/DOC Decided
Woodgate Centre Oak Tree Lane Woodgate PO20 3GU
Approval of details reserved by condition imposed under AL/107/21/PL relating to conditions 32-hard an soft landscaping and 43-fire hydrants.
-
AL/134/25/AOO Refused
Woodgate Centre Oak Tree Lane Woodgate PO20 3GU
Application for the approval of Public Open Space Scheme of Works and Play Areas Scheme of Works as required under obligations set out in the Section106 agreement dated 9/10/23 in relation to planning application AL/107/21/PL, under Schedule 3 Paragraph 1.1 and Schedule 3 Paragraph 3.1a.
-
AL/127/25/DOC Decided
Woodgate Centre Oak Tree Lane Woodgate PO20 3GU
Approval of details reserved by condition imposed under AL/107/21/PL relation to conditions 12-Construction Management Plan and 35-Construction Environmental Management Plan.
-
AL/124/25/NMA Granted
Woodgate Centre Oak Tree Lane Woodgate PO20 3GU
Non material amendment following the grant of AL/107/21/PL to change wording of condition 43 to allow development up to damp proof course level prior to the submission of details of fire hydrants.
-
AL/105/25/DOC Decided
Woodgate Centre Oak Tree Lane Woodgate PO20 3GU
Approval of details reserved by condition imposed under AL/107/21/PL relating to conditions 15-foul drainage, 17-surface water drainage scheme, 18-maintenance and management of surface water system and 21-discharge of flows (please see AL/106/25/DOC for the discharge of conditions 13-waste storage, 14-archaeological works, 28-remediation strategy, 32-hard and soft landscape, 34-protection of existing trees/bushes/hedges, 40-decentralised and renewable energy or low carbon sources, 42-Employment and Skills Plan and 43-location of fire hydrants).
-
AL/106/25/DOC Decided
Woodgate Centre Oak Tree Lane Woodgate PO20 3GU
Approval of details reserved by condition imposed under AL107/21/PL relating to 13-waste storage, 14-archaeological works, 28-remediation strategy, 32-hard and soft landscape, 34-protection of existing trees/bushes/hedges, 40-decentralised and renewable energy or low carbon sources, 42-Employment and Skills Plan and 43-location of fire hydrants (please see AL/105/25/DOC for the discharge of conditions 15-foul drainage, 17-surface water drainage scheme, 18-maintenance and management of surface water drainage system and 21-discharge of flows).
-
AL/107/21/PL Granted
Woodgate Centre Oak Tree Lane Woodgate PO20 3GU
Demolition of the Woodgate Centre buildings (including 3 No. residential dwellings) & the construction of 180 No. residential dwellings with the creation of new vehicular access with footways and cycleways, ancillary road infrastructure, emergency access arrangements, associated parking, public open space, including children's play space, landscape planting, surface water attenuation & drainage & other associated infrastructure. This site in in Cil Zone H SP2, BEW Strategic Site and is not CIL Liable.
Timeline
Dates from the published record
-
18 May 2026
Received by Arun
-
26 May 2026
Validated
Checked as complete and ready for consideration.
-
31 Jul 2026
Added to PlanIndex
-
4 Sep 2026
Decision issued: Permitted
Related applications
Cases linked to this one on the register
-
AL/107/21/PL Granted
Woodgate Centre Oak Tree Lane Woodgate PO20 3GU
Demolition of the Woodgate Centre buildings (including 3 No. residential dwellings) & the construction of 180 No. residential dwellings with the creation of new vehicular access with footways and cycleways, ancillary road infrastructure, emergency access arrangements, associated parking, public open space, including children's play space, landscape planting, surface water attenuation & drainage & other associated infrastructure. This site in in Cil Zone H SP2, BEW Strategic Site and is not CIL Liable.
Documents
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Arun granted permission on 4 September 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Woodgate Centre Oak Tree Lane Woodgate PO20 3GU
Non material amendment following the grant of AL/107/21/PL to change wording of condition 43 to allow development up to damp proof course level prior to the submission of details of fire hydrants.
Granted Amendments -
Woodgate Centre Oak Tree Lane Woodgate PO203GU
Application for the approval of estate road works scheme, highway works scheme and highway works agreement as required under obligation set out in the Section 106 Agreement dated 9/10/23 in relation to planning application AL/107/21/PL, under schedule 1 clauses P1.2, P4.2, P4.4.
Withdrawn -
Woodgate Centre Oak Tree Lane Woodgate PO20 3GU
Demolition of the Woodgate Centre buildings (including 3 No. residential dwellings) & the construction of 180 No. residential dwellings with the creation of new vehicular access with footways and cycleways, ancillary road infrastructure, emergency access arrangements, associated parking, public open space, including children's play space, landscape planting, surface water attenuation & drainage & other associated infrastructure. This site in in Cil Zone H SP2, BEW Strategic Site and is not CIL Liable.
Granted Full applications Demolition -
12 Oak Tree Lane Woodgate PO20 3GU
Application for certificate of lawfulness for a proposed rear conservatory.
Granted Outline Extension -
Woodgate Centre Oak Tree Lane Woodgate PO20 3GU
Approval of details reserved by condition imposed under AL/107/21/PL relating to condition 3-materials and finishes.
Granted Conditions -
Woodgate Centre Oak Tree Lane Woodgate PO20 3GU
Application for the approval of Public Open Space Scheme of Works (Schedule 3, Paragraph 1.1) and Play Areas Scheme of Works (Schedule 3, Paragraph 3.1(a)) as required under obligations set out in the Section 106 agreement dated 9th October 2023 in relation to planning permission AL/107/21/PL.
Granted
Other condition discharge and variation applications
In Arun
-
BR/166/26/DOC Awaiting decision
51 High Street Bognor Regis PO21 1RX
Approval of details reserved by condition imposed under BR/38/23/PL relating to condition 8-improvements to secure Biodiversity Net Gain.
-
AL/81/26/DOC Awaiting decision
The Square House Hook Lane Aldingbourne PO20 3TS
Approval of details reserved by condition imposed under AL/9/26/S73 relating to condition 3-panel of flintwork and brickwork.
-
BN/101/26/DOC Awaiting decision
Eastmere Stables Eastergate Lane Eastergate PO20 3SJ
Approval of details reserved by condition imposed under BN/99/22/OUT relating to conditions 10-decentralised, renewable and low carbon energy and 12-external lighting.
-
A/91/26/DOC Decided
Show Home And Marketing Suite 1 Buxton Crescent Angmering BN16 4SQ
Approval of details reserved by condition under A/248/21/PL relating to condition 29- Surface Water Drainage.
-
BE/53/26/DOC Decided
Land to the east of Shripney Road Shripney Bognor Regis PO22 9NW
Approval of details reserved by condition under BE/109/19/OUT (Appeal Ref: APP/C3810/W/20/3264105) relating to condition 20- External Lighting.