Planning application
Lands 545m south east of the Eastway entrance, bound by the adjacent railway line to the south and Beverage Plastics and NIE Network Plants workshop to the north, at Silverwood Business Park, Craigavon
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge of Condition No.2 of LA08/2024/1023/F which states: No development shall take place until a Wastewater Impact Assessment has been submitted to and approved in writing by the Council, in consultation with NI Water, with the Wastewater Impact Assessment demonstrating that the development can be served by the public sewerage system or that acceptable alternative provision for the disposal of sewerage has been made. Any mitigation measures contained therein shall be implemented prior to the commencement of the development hereby permitted, or in accordance with a programme to be submitted to and agreed in writing with the Council.
As published by the council, reference LA08/2025/1545/DC
Application record
- Reference
- LA08/2025/1545/DC
- Type
- Discharge of Condition
- Status
- Determined
- Decision
- Granted As published: Condition Discharged
- Received
- 16 Dec 2025
- Validated
- 16 Dec 2025
- Decided
- 30 Jan 2026
- Ward
- Derrytrasna
Site history
Applications at this address on the Armagh City, Banbridge and Craigavon register
This site has had 2 applications since 2025: 2 approved, 0 refused.
-
LA08/2026/0047/DC Granted
Lands 545m south east of the Eastway entrance, bound by the adjacent railway line to the south and Beverage Plastics and NIE Network Plants workshop to the north, at Silverwood Business Park, Craigavon
Discharge of Condition No. 4 of LA08/2024/1023/F which states: No development or piling work should commence on this site until a piling risk assessment, undertaken in full accordance with the methodology contained within the Environment Agency document on “Piling and Penetrative Ground Improvement Methods on Land Affected by Contamination: Guidance on Pollution Prevention”, has been submitted in writing and agreed with the Planning Authority. The methodology is available at: http://webarchive.nationalarchives.gov.uk/20140329082415/http://cdn.environment-agency.gov.uk/scho0501bitt-e-e.pdf.
Timeline
Dates from the published record
-
16 Dec 2025
Received by Armagh City, Banbridge and Craigavon
-
30 Jan 2026
Decision issued: Condition Discharged
-
29 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
TSA Planning Ltd Agent, a planning consultancy registered in Belfast
Active · incorporated 2007 · Belfast
221 applications on PlanIndex · across 11 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Armagh City, Banbridge and Craigavon granted permission on 30 January 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Lands 545m south east of the Eastway entrance, bound by the adjacent railway line to the south and Beverage Plastics and NIE Network Plants workshop to the north, at Silverwood Business Park, Craigavon
Discharge of Condition No. 4 of LA08/2024/1023/F which states: No development or piling work should commence on this site until a piling risk assessment, undertaken in full accordance with the methodology contained within the Environment Agency document on “Piling and Penetrative Ground Improvement Methods on Land Affected by Contamination: Guidance on Pollution Prevention”, has been submitted in writing and agreed with the Planning Authority. The methodology is available at: http://webarchive.nationalarchives.gov.uk/20140329082415/http://cdn.environment-agency.gov.uk/scho0501bitt-e-e.pdf.
Granted Conditions 5 docs -
Lands immediately adjacent and north, north east and north west of 22 Ballynamoney Lane, Lurgan and 335m west of No12 Halfpenny Valley Industrial Estate, Lurgan BT66 8TP.
97% historically approved · decision due ~9 Mar
Erection of food factory (Use Class B3) with associated ancillary outbuildings, tanks, car and lorry parking, hard and soft landscaping and associated site works (amended plans and supporting information received).
Awaiting decision Full applications 62 docs -
Approximately 110 metres North West of No. 3 Halfpenny Valley Industrial Estate, Portadown Road, Lurgan, BT66 8TP
Section 54 application to remove Conditions Nos. 3, 4 and 5 of planning approval LA08/2022/1502/F (construction of an access road, utilities and drainage to facilitate further development of land zoned for industry). Condition 3 states: "No site works of any nature or development shall take place until a programme of archaeological work (POW) has been prepared by a qualified archaeologist, submitted by the applicant and approved in writing by Armagh City, Banbridge and Craigavon Borough Council in consultation with Historic Environment Division, Department for Communities. The POW shall provide for: The identification and evaluation of archaeological remains within the site; Mitigation of the impacts of development through licensed excavation recording or by preservation of remains in-situ; Post-excavation analysis sufficient to prepare an archaeological report, to publication standard if necessary; and Preparation of the digital, documentary and material archive for deposition." Condition 4 states: "No site works of any nature or development shall take place other than in accordance with the programme of archaeological work approved under condition no.3." Condition 5 states: "A programme of post-excavation analysis, preparation of an archaeological report, dissemination of results and preparation of the excavation archive shall be undertaken in accordance with the programme of archaeological work approved under condition no.3. These measures shall be implemented and a final archaeological report shall be submitted to Armagh City, Banbridge and Craigavon Borough Council within 12 months of the completion of archaeological site works, or as otherwise agreed in writing with Armagh City, Banbridge and Craigavon Borough Council."
Granted 10 docs -
Lands adjacent to and west of no.1 (Crossbows Optical) and 80m east of no.3 (Plaswire) Halfpenny Valley Industrial Estate, Lurgan, Craigavon BT66 8TP
Discharge of condition No. 16 of LA08/2024/1237/F which reads: No development shall take place until a final Construction and Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Council. This shall reflect all the mitigation and avoidance measures detailed in the outline CEMP. The approved CEMP shall be implemented in accordance with the approved details and all works on site shall conform to the approved CEMP, unless otherwise agreed in writing by the Council.
Granted Conditions 8 docs
Other condition discharge and variation applications
In Armagh City, Banbridge and Craigavon
-
LA08/2025/0534/DC Granted
100 CORNAKINNEGAR ROAD KILMORE LURGAN BT67 9JP
Proposed discharge of condition 2 of planning approval LA08/2020/1280/F. Condition 2 states: No site works of any nature or development shall take place until a programme of archaeological work (POW) has been prepared by a qualified archaeologist, submitted by the applicant and approved in writing by Armagh City, Banbridge and Craigavon Borough Council in consultation with Historic Environment Division, Department for Communities. The POW shall provide for: - The identification and evaluation of archaeological remains within the site; - Mitigation of the impacts of development through licensed excavation recording or by preservation of remains in-situ; - Post-excavation analysis sufficient to prepare an archaeological report, to publication standard if necessary; and - Preparation of the digital, documentary and material archive for deposition. Reason: To ensure that archaeological remains within the application site are properly identified and protected or appropriately recorded.
-
LA08/2026/0579/DC Granted
29 Derryclone Road, Craigavon, BT67 0BN
Discharge of Conditions 3 and 4 of planning ref: LA08/2025/0799/F which read: Conditon 3: Within twenty four hours prior to demolition, the existing buildings on the site shall be checked for bat presence by a competent ecologist and all demolition works shall be monitored by a competent ecologist. A report of the demolition shall be submitted to the Planning Authority for approval in writing within 2 weeks. Reason: To ensure protection to bats and their roosts. Condition 4: No demolition of buildings or structures shall take place between 1 March and 31 August inclusive, unless a competent ecologist has undertaken a detailed check for active bird’s nests immediately before demolition and provided written confirmation that no nests are present/birds will be harmed and/or there are appropriate measures in place to protect nesting birds. Any such written confirmation shall be submitted to the Planning Authority within 6 weeks of works commencing. Reason: To protect breeding birds.
-
LA08/2026/0943/DC Awaiting decision
Lands at No.19 Church Road extending from the rear of No's. 1 - 17a Church Road and south and east of Glen Dimplex premises Lurgan Road, Portadown.
Discharge of condition 08 of LA08/2019/1595/F as it relates to sites 15 and 16; the condition reads as follows: After completing any remediation works required under Conditions 5, 6 and 7 and prior to occupation of the development, a verification report shall be submitted and approved in writing by the Council. This report shall be completed by competent persons in accordance with the Model Procedures for the Management of Land Contamination (CLR11). The verification report shall present all the remediation and monitoring works undertaken and demonstrate the effectiveness of the works in managing all the risks and achieving the remedial objectives.
-
LA08/2026/0935/DC Awaiting decision
Nos 31, 32, 33, 34, 35, 36 and 37 Hunter's Lodge, Drumnakelly, Lurgan, Craigavon BT66 6NB
Discharge of Condition No.4 of LA08/2026/0498/F which reads: Within three 3 calendar months of the date of this decision, the developer shall submit to the Council for its written approval a landscaping scheme showing the location, numbers, species and sizes of trees and shrubs to be planted. The scheme of planting as finally approved shall be carried out during the first planting season after the Council’s final approval of that landscaping scheme. Trees or shrubs dying, removed or becoming seriously damaged within the lifetime of the development, shall be replaced in the next planting season with others of a similar size and species unless the Council gives written consent to any variation. Reason: In the interest of visual amenity and to ensure the provision, establishment and maintenance of a high standard of landscape.
-
LA08/2026/0919/DC Awaiting decision
Lands at and immediately south and west of 1 Clare Road, Clare, Tandragee, BT62 2EY
Discharge of conditions 5 and 6 of LA08/2023/2288/F - Demolition of existing dwelling, erection of 4no. semi-detached two-storey dwellings, erection of retaining walling, creation of new access onto Cloghoge Road, and associated site works