Skip to content
PlanIndex Get alerts
Menu

Planning application

LA08/2025/1431/F

159 Plantation Road, Portadown, Bleary, Craigavon BT63 5NN

Proposal

Erection of single storey side and rear extension, erection of 1&1/2 storey detached garage, repositioning of access and creation of new laneway including all other associated siteworks

As published by the council, reference LA08/2025/1431/F

Timeline

Dates from the published record

  1. 20 Nov 2025

    Received by Armagh City, Banbridge and Craigavon

  2. 27 Nov 2025

    Validated

    Checked as complete and ready for consideration.

  3. 24 Apr 2026

    Decision issued: Granted

  4. 29 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25a Calvertstown Road, Portadown, Craigavon, BT63 5NY

    Erection of single storey side extension to provide kitchen/dining area and covered patio.

    10 Oct 2025 366m away Full applications
  • Lands immediately adjacent and west of No.54 The Slopes Portadown, Craigavon, BT63 5NT

    Discharge Condition 10 of planning approval LA08/2020/0359/O (and relates to planning approval LA08/2023/2963/RM). Condition 10 states: No development shall commence until a Consent to Discharge Sewage Effluent from a septic tank has been granted by the Northern Ireland Environment Agency under the Water (Northern Ireland) Order 1999 or any legislation that revokes and amends this legislation in the future and details of the proposed sewage treatment has been submitted to and approved by the Council and thereafter implemented. Reason: In the interests of public health and so as not to create or add to a pollution problem.

    27 Nov 2025 390m away Conditions
  • Adjoining and to the North of No. 139 Plantation Road, Bleary, Craigavon, BT63 5NN

    Proposed site for dwelling and garage

    16 Dec 2025 408m away Outline

In Armagh City, Banbridge and Craigavon

  • 107 Kilmore House Cornakinnegar Road, Cornakinnegar Road, Craigavon, BT67 9JP

    Demolition of part of the ground floor wall to create a larger kitchen and dining area, including opening up the existing low ceiling to form a vaulted space with provision of ridge glazing. Also included is the reconfiguring existing Bedroom to provide a dedicated dressing area and and shower room.

    22 Apr 2026 Full applications
  • Carrick Primary School, Sloan Avenue, Lurgan, Craigavon BT66 8NY

    Provision of 1no Modular Classroom and associated siteworks

    21 Apr 2026 Full applications
  • 260 Kernan Hill Manor, Portadown, Craigavon BT63 5WU

    Ground Floor Bedroom & Shower Room Rear Extension & Level Access to Front Door

    16 Feb 2026 Full applications
  • 97 Brownstown Road, Portadown, BT62 3PZ

    Retention of domestic garage and increased curtilage

    2 Dec 2025 Full applications
  • 42 Iveagh Drive, Banbridge, BT32 3YE

    Erection of two storey side extension, internal alterations and associated site works

    22 May 2026 Full applications