Skip to content
PlanIndex Get alerts
Menu

Planning application

LA08/2025/1128/F

14 Gosselin Drive, Lurgan, Craigavon, BT66 6JZ

Proposal

Erection of a single storey Bedroom/Shower room extension to the rear with rear access ramp and a single storey dining room extension to the gable of dwelling and internal alterations.

As published by the council, reference LA08/2025/1128/F

Timeline

Dates from the published record

  1. 19 Sep 2025

    Received by Armagh City, Banbridge and Craigavon

  2. 29 Sep 2025

    Validated

    Checked as complete and ready for consideration.

  3. 25 Nov 2025

    Decision issued: Granted

  4. 29 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • LA08/2025/1340/O Awaiting decision

    Front garden area of No. 11 College Walk (between No.8 and No.14 College Walk), Lurgan, BT66 6JN

    Site for up to two (2) no. dwellings and garages with associated site works and repositioning of vehicular access serving No.11 College Walk.

    29 Oct 2025 229m away Outline
  • Lands approx 200m south of 1 Hunters Lodge, Lurgan, Craigavon, BT66 6NB and approx 100m south east of no.1-11 (odd no.s) The Grange, Lurgan, Craigavon, BT67 9BU.

    Discharge of condition No. 10 of LA08/2024/0545/F which reads: A programme of post-excavation analysis, preparation of an archaeological report, dissemination of results and preparation of the excavation archive shall be undertaken in accordance with POW approved under condition 8. These measures shall be implemented and a final archaeological report shall be submitted to the Council within 12 months of the completion of archaeological site works, or as otherwise agreed in writing with the Council. Reason: To ensure that the results of archaeological works are appropriately analysed and disseminated and the excavation archive is prepared to a suitable standard for deposition.

    17 Sep 2025 326m away Conditions
  • Lands approx 200m south of 1 Hunters Lodge, Lurgan, Craigavon, BT66 6NB and approx 100m south east of no.1-11 (odd no.s) The Grange, Lurgan, Craigavon, BT67 9BU.

    Proposed discharge of Condition 8 of planning approval LA08/2024/0545/F. Condition 8 states: No site works of any nature or development shall take place until a programme of archaeological work (POW) has been prepared by a qualified archaeologist and submitted to and approved in writing by the Council. The POW shall provide for: - The identification and evaluation of archaeological remains within the site; - Mitigation of the impacts of development through licensed excavation recording or by preservation of remains in-situ; - Post-excavation analysis sufficient to prepare an archaeological report, to publication standard if necessary; and - Preparation of the digital, documentary and material archive for deposition. Reason: To ensure that archaeological remains within the application site are properly identified and protected or appropriately recorded.

    3 Nov 2025 326m away Conditions
  • LA08/2026/0733/F Awaiting decision

    Site 95metres North of No.1 Woodville Elms, Lurgan with access located between No 11 and No 13 Woodville Elms Lurgan.

    Erection Of Two Storey Dwelling And Associated Site Works,

    30 Jun 2026 335m away Full applications
  • Lands immediately adjacent to and approximately 35m southwest and south of No's 5 and 6 College Walk, Lurgan and accessed from College Lane located between No's 4 and 5 College Walk, Lurgan, BT66 6JN

    Erection of 2 no. dwellings and detached garages (Plots 7 and 8), 1 no. dwelling and attached garage (Plot 13) and 1 no. dwelling (Plot 14) (4 no dwellings in total) with all associated site works and landscaping (change of house type to that approved under N/2008/0419/F).

    7 Aug 2025 420m away Full applications
  • LA08/2026/0498/F Awaiting decision

    Nos 31, 32, 33, 34, 35, 36 and 37 Hunter's Lodge, Drumnakelly, Lurgan, Craigavon BT66 6NB

    Retention of 7 dwellings, garages and all associated site and access works, (in substitution of those as previously approved under N/2013/0150/F)

    20 Apr 2026 458m away Full applications

In Armagh City, Banbridge and Craigavon

  • 107 Kilmore House Cornakinnegar Road, Cornakinnegar Road, Craigavon, BT67 9JP

    Demolition of part of the ground floor wall to create a larger kitchen and dining area, including opening up the existing low ceiling to form a vaulted space with provision of ridge glazing. Also included is the reconfiguring existing Bedroom to provide a dedicated dressing area and and shower room.

    22 Apr 2026 Full applications
  • Carrick Primary School, Sloan Avenue, Lurgan, Craigavon BT66 8NY

    Provision of 1no Modular Classroom and associated siteworks

    21 Apr 2026 Full applications
  • 260 Kernan Hill Manor, Portadown, Craigavon BT63 5WU

    Ground Floor Bedroom & Shower Room Rear Extension & Level Access to Front Door

    16 Feb 2026 Full applications
  • 97 Brownstown Road, Portadown, BT62 3PZ

    Retention of domestic garage and increased curtilage

    2 Dec 2025 Full applications
  • 42 Iveagh Drive, Banbridge, BT32 3YE

    Erection of two storey side extension, internal alterations and associated site works

    22 May 2026 Full applications