Skip to content
PlanIndex Get alerts
Menu

Planning application

Lands located approximately 75m north of 37A Annahugh Road, approximately 110m northeast of 41 Annahugh Road and approximately 76m north east of 45 Annahugh Road,Loughgall, Armagh, BT61 8PQ.

Granted Armagh City, Banbridge and Craigavon LA08/2025/1065/F Full

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed erection of distribution warehouse for established tyre distribution business (Use Class B4 Storage or Distribution) with roof mounted solar panels.

As published by the council, reference LA08/2025/1065/F

Application record

Reference
LA08/2025/1065/F
Type
Full
Status
Determined
Decision
Granted
Received
8 Sep 2025
Validated
24 Sep 2025
Decided
12 Jun 2026
Ward
Loughgall
Postcode
BT61 8PQ

Timeline

Dates from the published record

  1. 8 Sep 2025

    Received by Armagh City, Banbridge and Craigavon

  2. 24 Sep 2025

    Validated

    Checked as complete and ready for consideration.

  3. 12 Jun 2026

    Decision issued: Granted

  4. 29 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Donaldson Planning LTD Agent, a planning consultancy registered in Donaghadee

Active · incorporated 2017 · Donaghadee

70 applications on PlanIndex · across 8 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

45 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Armagh City, Banbridge and Craigavon granted permission on 12 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 53 Annahugh Road, Loughgall, Armagh, BT61 8PQ

    LA08/2025/1285/F Submitted 13 Oct 2025 200 yards away

    Erection of single-storey extension to the existing dwelling with an extension of the residential curtilage to the rear.

    Granted Full applications Extension 14 docs
    Small domestic
  • Land Approximately 100m North of 32 Bloom Hill Road, Kilmore, Armagh, BT61 8NZ

    LA08/2026/0640/F Submitted 8 Jun 2026 400 yards away

    98% historically approved · decision due ~3 Aug

    Erection of a Free Range Poultry Shed with 2No. Feed Bins, a Storage Shed, a NAP Compliant Slurry Wash Tank and all associated Site Works (Poultry Shed to Contain 20,000 Free Range Egg Laying Hens)

    Awaiting decision Full applications 16 docs
    Small domestic

In Armagh City, Banbridge and Craigavon

  • LA08/2026/0316/F Withdrawn

    Lands immediately adjacent to and east of No.89 Blackskull Road, Dromore, BT25 1JN

    Erection of 2 no. dwellings with attached garages and associated site works.

    Received 23 Mar, published by the council 29 Jul 2026 Full applications
  • 198 Lurgan Road, Gamblestown, Dromore, BT25 1HL

    Extension to curtilage of dwelling, extension and alterations to rear of dwelling to include larger kitchen/dining area, and home office, erection of external raised terrace area and external steps, erection of replacement outbuilding to provide domestic games room, gym, W.C and storage area, and re-grading of ground levels to rear of outbuilding.

    Received 20 Feb, published by the council 7 Aug 2026 Full applications
  • 3 Mellifont Park, Armagh, BT61 9HS

    Proposed single storey side extension

    Received 20 Aug, published by the council 2 Sep 2026 Full applications
  • Immediately adjacent and north of Mountnorris Primary School 7 Main Street, Mountnorris, Armagh, BT60 2TR

    Demolition of existing single storey traditional build garage to be replaced with pre-fabricated double modular classroom and general store. Works also include: retaining wall, alterations to existing pedestrian fencing, new pedestrian fencing and bitmac footpath.

    Received 8 Jul, published by the council 7 Aug 2026 Full applications
  • Cormeen Community Hall, Tullycallidy Road, Armagh, BT60 4NE

    Two-storey extension to existing community hall to provide a music room, gymnasium, access stair, lift and associated external works and service connections (amended plans and additional information received)

    Received 7 Jul, published by the council 7 Aug 2026 Full applications