Skip to content
PlanIndex Get alerts
Menu

Planning application

5m south of No.2 Dunbarton Street, Gilford, BT63 6HJ

Granted Armagh City, Banbridge and Craigavon LA08/2024/0977/F Full

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of Northern Ireland Centennial Stone

As published by the council, reference LA08/2024/0977/F

Application record

Reference
LA08/2024/0977/F
Type
Full
Status
Determined
Decision
Granted
Received
21 Aug 2024
Validated
6 Sep 2024
Decided
15 Nov 2024
Ward
Gilford
Postcode
BT63 6HJ

Timeline

Dates from the published record

  1. 21 Aug 2024

    Received by Armagh City, Banbridge and Craigavon

  2. 6 Sep 2024

    Validated

    Checked as complete and ready for consideration.

  3. 15 Nov 2024

    Decision issued: Granted

  4. 7 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

8 applications on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Lands incorporating Castle Hill, extending from Mill Street to Community Hall at 14 Castle Hill, existing path south of 3 Castle Hill from Castle Hill to Castle View, Lands to the front of 2-6 and 3-7 Dunbarton Street, Existing Path from Dunbarton Street to Riverside Walk, Lands from the front of Health Centre Castle Street, extending to Bridge Street/Wall Road Junction, and incorporating the car park at Bridge Street, lands to the front of 2-6 and 1-7 Mill Street, Gilford.

    LA08/2026/0026/DC Submitted 12 Jan 2026 84m away

    95% historically approved · decision due ~9 Mar

    Discharge of Condition No. 10 of LA08/2024/0141/F. Condition No. 10 states: "No development activity, including ground preparation or vegetation clearance,shall take place until a final Construction and Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Planning Authority. The approved CEMP shall be implemented in accordance with the approved details and all works on site shall conform to the approved CEMP, unless otherwise agreed in writing by the Planning Authority. The CEMP shall include, but not be limited to, the following: a. Constructionmethodology and timings of works; b. Pollution Prevention Plan; including suitable buffers between the location of all construction works, storage of excavated spoil and construction materials, any refuelling, storage of oil/fuel, concrete mixing and washing areas and any watercourses or surface drains present on or adjacent to the site; c. Site Drainage Management Plan; including Sustainable Drainage Systems (SuDS), foul water disposal and silt management measures; d. Spoil Management Plan; including identification of spoil storage areas, management and handling of spoil and details of the reinstatement of excavated soil and mitigation measures for badgers and other wildlife; e. Water Quality Monitoring Plan; f. Ecological Mitigation such as vegetation clearance outside of the bird breeding season and pre-construction surveys; g. Environmental Emergency Plan; h. Effective avoidance and mitigation methodologies planned for the protection of the water environment."

    Awaiting decision Conditions 8 docs
  • 3, 5 & 7 Mill Street, Gilford, Craigavon, BT63 6HQ

    LA08/2025/1394/F Submitted 31 Oct 2025 145m away

    Demolition of existing two-storey buildings and erection of new two-storey building comprising two ground floor retail units, internal bin storage, one first floor apartment and all associated siteworks.

    Granted Full applications Demolition 20 docs
  • Gilford Primary School, Castle Hill, Gilford, Craigavon, BT63 6HH

    LA08/2026/0173/F Submitted 13 Jan 2026 176m away

    97% historically approved · decision due ~21 Apr

    Erection of a double modular classroom with toilet facilities and associated site works.

    Awaiting decision Full applications 16 docs
  • 1 and 4 Banbridge Road, Gilford, Craigavon BT63 6DJ

    LA08/2024/0673/DC Submitted 10 Jun 2024 247m away

    Discharge of Condition No. 11 of LA08/2017/0912/F. Condition No. 11 states: "The development hereby permitted shall not be occupied until the remediation measures as described in Section 6.2 of the WYG Detailed Quantitative Risk Assessment. Gilford Petrol Filing Station. Ref. A099612. V1.1. dated April 2020, have been implemented to the satisfaction of the Council The Council shall be given 2 weeks written notification prior to the commencement of remediation work." Condition No. 13 states: "After completing the remediation works under Conditions 11, 12 and 14; and prior to occupation of the development, a verification report shall be submitted to and agreed in writing with the council. This report shall be completed by competent persons in accordance with the Land Contamination Risk Management (LC:RM) guidance. The verification report shall present all the remediation and monitoring works undertaken and demonstrate the effectiveness of the works in managing all the risks and achieving the remedial objectives." Discharge of Condition No. 14 of LA08/2017/0912/F. Condition No. 14 states: "Evidence shall be presented in the Verification Report that all fuel storage tanks (and associated infra-structure) have either been retained for use and been integrity tested under high pressure or have been fully decommissioned and removed in line with current Guidance for Pollution prevention (GPP 2) and the Pollution Prevention Guidance (PPG27) or have been fully decommissioned, backfilled with concrete and left in-situ, and the quality of surrounding soils and groundwater has been verified. Should contamination be identified during this process, Condition 10 shall apply."

    Decided Conditions 7 docs
  • 7A Bannview, Gilford, BT63 6JX

    LA08/2026/0418/F Submitted 15 Apr 2026 340m away

    97% historically approved · decision due ~10 Jun

    Erection of 7 no. dwellings comprising of 6 no. semi detached and 1 no. detached along with associated site works.

    Awaiting decision Full applications 18 docs
    Several homes
  • 7 Drumaran View, Gilford, Craigavon, BT63 6BF

    LA08/2026/0901/F Submitted 17 Aug 2026 489m away

    97% historically approved · decision due ~20 Oct

    Addition of a single-storey rear extension and conversion of garage to downstairs bedroom

    Awaiting decision Full applications Extension 15 docs
    Small domestic

In Armagh City, Banbridge and Craigavon

  • 156a Navan Fort Road, Killylea, Armagh, BT60 4PY

    Extension and alterations to dwelling, erection of retaining walling and fencing, and associated site works

    11 Jul 2026 Full applications
  • Lands 25m North-West of No.120 Hanslough Road, Middletown, BT60 4JJ

    Erection of Replacement Agricultural Building to provide agricultural machinery storage building and associated works

    8 Dec 2025 Full applications
  • Lands 50m South of 51 Corran Road, Clady More, Armagh BT60 2EU (with access onto Vestry Road).

    Erection of dwelling and garage - change of house type to dwelling & garage approved under planning application Ref: LA08/2017/1219/RM

    27 Apr 2026 Full applications
  • Site located approximately 31m north-east of 12 Boggle Hill, Gilford, Craigavon, BT63 6AF

    Erection of dwelling and garage with associated site works (Amended plans)

    10 Nov 2025 Full applications
  • Lands approximately 14 metres southwest of No.70 Foxwood Hall, Lurgan, BT66 7XS and 18 metres east of No.25 Pines Court, Lurgan, Craigavon BT66 7BZ

    Erection of 2 no. single storey dwellings with sunrooms (with garage for site 192), solar panels and associated landscaping and siteworks (change of house type to replace 2 no. single storey dwellings without sunrooms on sites 192 and 193 to that approved under LA08/2019/1419/F).

    10 Jun 2026 Full applications