Skip to content
PlanIndex Get alerts
Menu

Planning application

33 Lenaderg Road Lenaderg Banbridge Down BT32 4PT

Granted Armagh City, Banbridge and Craigavon LA08/2023/1927/F Full

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed single storey rear extension

As published by the council, reference LA08/2023/1927/F

Application record

Reference
LA08/2023/1927/F
Type
Full
Status
Determined
Decision
Granted
Received
7 Mar 2023
Validated
7 Mar 2023
Decided
31 May 2023
Ward
Banbridge North
Postcode
BT32 4PT

Timeline

Dates from the published record

  1. 7 Mar 2023

    Received by Armagh City, Banbridge and Craigavon

  2. 31 May 2023

    Decision issued: Granted

  3. 4 Oct 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Armagh City, Banbridge and Craigavon granted permission on 31 May 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 50 metres North West of 30 Lenaderg Road Banbridge BT32 4PT

    LA08/2022/1124/F Submitted 16 Aug 2022 150 yards away

    Proposed change of house type and siting position of rural detached dwelling house under implemented planning application Q/2009/0514/F, along with proposed erection of new detached garage, rural entrance pillars and gate, additional landscaping and associated site works.

    Granted Full applications New dwelling 28 docs
    Domestic
  • Lands Approximately 50 metres North West of 30 Lenaderg Road Banbridge BT32 4PT

    LA08/2024/0447/S54 Submitted 19 Apr 2024 150 yards away

    A Section 54 application to vary Condition 3 of planning approval LA08/2022/1124/F which states - The dwelling hereby permitted shall be occupied only by Ivan Berry for a period of 5 years from the date the dwelling is first occupied. Reason: Planning permission is granted solely because of the applicant's special circumstances. To: The dwelling hereby permitted shall be occupied by Ivan Berry and his family members for a period of 5 years from the date the dwelling is first occupied. Reason: Planning permission is granted solely because of the applicant's special circumstances.

    Granted 5 docs
    Domestic
  • Lands to the rear of and 60 metres northwest of 46 Lenaderg Road, Banbridge, BT32 4PT

    LA08/2026/0041/F Submitted 12 Jan 2026 350 yards away

    97% historically approved · decision due ~10 Apr

    Erection of Agricultural shed on a farm for the purposes of feed/hay and machinery storage. No underground tanks will be installed.

    Awaiting decision Full applications 18 docs
    Small domestic

In Armagh City, Banbridge and Craigavon

  • LA08/2026/0316/F Withdrawn

    Lands immediately adjacent to and east of No.89 Blackskull Road, Dromore, BT25 1JN

    Erection of 2 no. dwellings with attached garages and associated site works.

    Received 23 Mar, published by the council 29 Jul 2026 Full applications
  • 198 Lurgan Road, Gamblestown, Dromore, BT25 1HL

    Extension to curtilage of dwelling, extension and alterations to rear of dwelling to include larger kitchen/dining area, and home office, erection of external raised terrace area and external steps, erection of replacement outbuilding to provide domestic games room, gym, W.C and storage area, and re-grading of ground levels to rear of outbuilding.

    Received 20 Feb, published by the council 7 Aug 2026 Full applications
  • 3 Mellifont Park, Armagh, BT61 9HS

    Proposed single storey side extension

    Received 20 Aug, published by the council 2 Sep 2026 Full applications
  • Immediately adjacent and north of Mountnorris Primary School 7 Main Street, Mountnorris, Armagh, BT60 2TR

    Demolition of existing single storey traditional build garage to be replaced with pre-fabricated double modular classroom and general store. Works also include: retaining wall, alterations to existing pedestrian fencing, new pedestrian fencing and bitmac footpath.

    Received 8 Jul, published by the council 7 Aug 2026 Full applications
  • Cormeen Community Hall, Tullycallidy Road, Armagh, BT60 4NE

    Two-storey extension to existing community hall to provide a music room, gymnasium, access stair, lift and associated external works and service connections (amended plans and additional information received)

    Received 7 Jul, published by the council 7 Aug 2026 Full applications