Planning application
26/00292/PP
Site 8 Kilmory Industrial Estate Lochgilphead Argyll And Bute PA31 8RR
Proposal
Change of use of part of site from concrete batching plant to facility for timber business, including installation of modular building for office use and siting of 2 containers
As published by the council, reference 26/00292/PP
Timeline
Dates from the published record
-
16 Feb 2026
Received by Argyll and Bute
-
19 Feb 2026
Validated
Checked as complete and ready for consideration.
-
15 Apr 2026
Decision issued: Application Approved
-
28 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/00755/PAWAY Awaiting decision
Unit 8 Kilmory Industrial Estate Lochgilphead Argyll And Bute PA31 8RR
Formation of turning area
-
26/00755/PNWAY Awaiting decision
Unit 8 Kilmory Industrial Estate Lochgilphead Argyll And Bute PA31 8RR
Formation of turning area
-
26/00755/DOC01 Awaiting decision
Unit 8 Kilmory Industrial Estate Lochgilphead Argyll And Bute PA31 8RR
Request to discharge conditions relative to application 26/00755/PAWAY, specifically Condition 2 (Biodiversity Enhancement) and Condition 3 (Tree Protection)
-
26/01202/LIB Awaiting decision
Kilmory Castle Kilmory Industrial Estate Lochgilphead Argyll And Bute PA31 8RT
Replacement flat roof over print room and removal of redundant metal chimney
-
26/00363/NMA Granted
Crawford House Kilmory Industrial Estate Lochgilphead Argyll And Bute PA31 8RR
Non Material Amendment relatvie to Planning Permission 23/00769/PP (Erection of workshop, office and showroom and formation of industrial area (part retrospective) - Amended Windows, external walls raised and roof changed to inverted (not visible from ground etc)
-
26/01070/PP Awaiting decision
MacLeod Construction Kilmory Industrial Estate Lochgilphead Argyll And Bute PA31 8RR
Formation of accessible access to existing offices, removal of existing stepped entrance and internal alterations to form accessible toilet, kitchen, and private office space
Other full applications applications
In Argyll and Bute
-
26/01276/PP Awaiting decision
Flat 9 Clyde Court 123 West Clyde Street Helensburgh Argyll And Bute G84 8EU
Installation of patio doors in place of window, formation of step and patio area
-
26/01099/PP Granted
The Dhorlin Longsdale Road Oban Argyll And Bute PA34 5DZ
Proposed alterations and loft conversion
-
25/01983/PP Granted
Garden Ground Of Craig Villa Dalmally Argyll And Bute
Erection of small shepherd hut for short-term holiday accommodation (retrospective)
-
26/01229/PP Awaiting decision
The Taynuilt Inn Taynuilt Argyll And Bute PA35 1JN
Formation of 3 short term letting units in lieu of bedrooms
-
26/01206/PP Awaiting decision
Flat A 36 Glencruitten Drive Oban Argyll And Bute PA34 4EJ
Change of use of dwellinghouse to allow short term holiday letting