Skip to content
PlanIndex Get alerts
Menu

Planning application

Gearach Farm (ili Distillery) Port Charlotte Isle Of Islay Argyll And Bute

Granted Argyll and Bute 25/01636/PP Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Section 42 Application to vary conditions 9, 12, 13, 14 and 23 of planning permission 21/02718/PP (Erection of distillery and visitor centre, with associated and ancillary development including support warehousing buildings, Installation of sewage treatment plant, two solar panel sites and formation of accesses) amendment to wording and implementation timeframes, extending period of permission by three years

As published by the council, reference 25/01636/PP

Application record

Reference
25/01636/PP
Type
Planning Permission
Status
Decided
Decision
Granted As published: Application Approved
Received
1 Oct 2025
Validated
3 Oct 2025
Decided
10 Mar 2026
Ward
Kintyre And The Islands
Parish
Islay Community Council
Decision by
Major Delegated Decision

Site history

Applications at this address on the Argyll and Bute register

This site has had 3 applications since 2021: 1 approved, 0 refused.

  • 25/01365/SCREEN Decided

    Gearach Farm (Ili Distillery) Port Charlotte Isle Of Islay Argyll And Bute

    Screening opinion to vary conditions related to planning permission 21/02718/PP (Erection of distillery and visitor centre, with associated and ancillary development including support warehousing buildings, Installation of sewage treatment plant, two solar panel sites and formation of accesses)

    Decided 16 Sep 2025 Outline
  • 21/01629/PAN Decided

    Gearach Farm (ili Distillery) Port Charlotte Isle Of Islay Argyll And Bute

    Proposal of Application Notice for a proposed distillery and visitor centre. Associated and ancillary development to include; distillery, warehouse buildings, services and hardstanding areas, parking, access roads and footpaths. Associated plant and infrastructure including; renewable energy infrastructure (hydrogen plant, solar panels and a wind turbine upto 76.5 metres high to blade tip, drainage arrangements, electrical sub-station, hard and soft landscaping

    Decided 22 Sep 2021

Timeline

Dates from the published record

  1. 1 Oct 2025

    Received by Argyll and Bute

  2. 3 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 10 Mar 2026

    Decision issued: Application Approved

  4. 28 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

Documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Argyll and Bute granted permission on 10 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Gearach Farm (ili Distillery) Port Charlotte Isle Of Islay Argyll And Bute

    21/01629/PAN Submitted 17 Aug 2021 200 yards away

    Proposal of Application Notice for a proposed distillery and visitor centre. Associated and ancillary development to include; distillery, warehouse buildings, services and hardstanding areas, parking, access roads and footpaths. Associated plant and infrastructure including; renewable energy infrastructure (hydrogen plant, solar panels and a wind turbine upto 76.5 metres high to blade tip, drainage arrangements, electrical sub-station, hard and soft landscaping

    Decided 14 docs

In Argyll and Bute

  • 26/01578/PP Awaiting decision

    Achavit Dunmore Argyll And Bute PA29 6XZ

    Erection of extension to dwellinghouse

    9 Sep 2026 Full applications
  • 26/00695/PP Granted

    Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute

    Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant

    Received 27 Apr, published by the council 28 Jul 2026 Full applications
  • 26/01551/PP Awaiting decision

    Land Approx 640 Metres West Of Dererach Pennyghael Isle Of Mull Argyll And Bute

    Formation of hardstanding for timber stacking and relocation of rock to form small causeway and interface with floating linkspan and barge

    Received 3 Sep, published by the council 8 Sep 2026 Full applications
  • 26/01548/PP Awaiting decision

    Ashfield Bungalow Achnamara Argyll And Bute PA31 8PT

    Erection of annexe for underground cellar and bar area, double garage and storage buildings and connecting pergola

    Received 3 Sep, published by the council 9 Sep 2026 Full applications
  • 25/01665/PP Withdrawn

    Land East Of Former Gunpowder Store Kames Argyll And Bute

    Erection of dwellinghouse and shed. Installation of septic tank and soakaway and formation of access track

    Received 7 Oct, published by the council 28 Jul 2026 Full applications