Skip to content
PlanIndex Get alerts
Menu

Planning application

Violet Cottage Kames Argyll And Bute PA21 2AB

Granted Argyll and Bute 25/01359/PP Planning Permission

Works: Extension Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Alterations and erection of extension to dwellinghouse

As published by the council, reference 25/01359/PP

Application record

Reference
25/01359/PP
Type
Planning Permission
Status
Decided
Decision
Application Approved
Received
15 Aug 2025
Validated
21 Aug 2025
Decided
1 Oct 2025
Ward
Cowal
Parish
Kilfinan Community Council
Decision by
Local Delegated Decision
Postcode
PA21 2AB

Timeline

Dates from the published record

  1. 15 Aug 2025

    Received by Argyll and Bute

  2. 21 Aug 2025

    Validated

    Checked as complete and ready for consideration.

  3. 1 Oct 2025

    Decision issued: Application Approved

  4. 12 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

Documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Land Outside Aliwal North Kames Argyll And Bute

    26/01311/TELNOT Submitted 28 Jul 2026 68m away

    Installation of 1 x 9M light wooden pole

    Decided Telecoms
  • Land Outside Aliwal North Kames Argyll And Bute

    26/01309/TELNOT Submitted 28 Jul 2026 69m away

    Installation of 9m light wooden pole

    Decided Telecoms
  • Wharf Cottage Kames Argyll And Bute PA21 2AD

    26/00584/NMA Submitted 2 Apr 2026 102m away

    Non Material Amendment of Planning Permission 23/01705/PP (Refurbishment and extensions to dwellinghouse, erection of detached garage/covered deck and installation of sewage treatment plant) - Various Revisions Existing - Removal of Stone gate post - Additional external wall removed at Elevation A Additional external wall removed at Elevation D Proposed External Stair at deck relocated Air Source Heat Pump, Phase 2 location External Steps at garage relocated Ramp to Garage from Deck amended Window sizes reduced at Garage gables Plant room added to Unheated Store Internal Access between Unheated Store and Ground Level added Storage space added under Garage Open Deck over garage now enclosed Minor amendments to glazing transoms on Sash'n'Case Look-a-Like windows

    Granted Amendments Extension Windows or glazing
    Domestic
  • 2 Piermount Buildings Kames Tighnabruaich Argyll And Bute PA21 2AE

    21/00751/PP Submitted 6 Apr 2021 128m away

    Alterations and extension to dwellinghouse including erection of external stair and formation of dormer window

    Granted Full applications Extension Loft or dormer +1 6 docs
    Domestic
  • Land South East Of Bute View Shore Road Kames Tighnabruaich Argyll And Bute PA21 2AF

    22/01598/PP Submitted 5 Aug 2022 139m away

    Erection of dwellinghouse

    Withdrawn Full applications 134 docs
    Domestic
  • Land South West Of Sulpher Springs Kames Argyll And Bute

    26/00545/PP Submitted 26 Mar 2026 142m away

    98% historically approved · decision due ~21 May

    Variation of Standard Time Limit Condition relative to planning permission reference 22/00376/PP (Erection of dwellinghouse) - extension to time period for a further 3 years

    Awaiting decision Full applications Extension
    Domestic

In Argyll and Bute

  • 26/00695/PP Granted

    Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute

    Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant

    27 Apr 2026 Full applications
  • 25/01665/PP Withdrawn

    Land East Of Former Gunpowder Store Kames Argyll And Bute

    Erection of dwellinghouse and shed. Installation of septic tank and soakaway and formation of access track

    7 Oct 2025 Full applications
  • 25/00238/PP Granted

    Iain Woodrow Electrical Glenegedale Industrial Estate Glenegedale Port Ellen Isle Of Islay Argyll And Bute PA42 7AS

    Erection of 2 pods for short term letting and associated works

    17 Feb 2025 Full applications
  • 26/00550/PP Granted

    7 Duchess Drive Helensburgh Argyll And Bute G84 9PR

    Erection of single storey front extension

    27 Mar 2026 Full applications
  • 26/00652/PP Granted

    The Old Stables 7 Kennedy Drive Helensburgh Argyll And Bute G84 9AR

    Demolition of existing extensions and bay window and erection of new single storey extensions

    20 Apr 2026 Full applications