Planning application
1 And 2 The Dairy Flora Street Bowmore Isle Of Islay Argyll And Bute PA43 7JX
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of external wall insulation system
As published by the council, reference 25/01072/PP
Application record
- Reference
- 25/01072/PP
- Type
- Planning Permission
- Status
- Decided
- Decision
- Granted As published: Application Approved
- Received
- 26 Jun 2025
- Validated
- 30 Jun 2025
- Decided
- 8 Jun 2026
- Ward
- Kintyre And The Islands
- Parish
- Islay Community Council
- Decision by
- Local Delegated Decision
- Postcode
- PA43 7JX
Timeline
Dates from the published record
-
26 Jun 2025
Received by Argyll and Bute
-
30 Jun 2025
Validated
Checked as complete and ready for consideration.
-
8 Jun 2026
Decision issued: Application Approved
-
5 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Argyll and Bute granted permission on 8 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
2 The Dairy Flora Street Bowmore Isle Of Islay Argyll And Bute PA43 7JX
Installation of external wall insulation system to exposed walls
Refused Full applications 10 docs -
1 - 21 Donald Caskie Square Bowmore Isle Of Islay Argyll And Bute PA43 7JW
Installation of roof mounted solar panels
Granted Full applications -
8 Donald Caskie Square Bowmore Isle Of Islay Argyll And Bute PA43 7JW
Installation of access ramp and removal of existing window and replace with accessible doors
Granted Full applications Windows or glazing -
12 Stanalane Bowmore Isle Of Islay Argyll And Bute PA43 7LA
Installation of modular galvanised steel access ramp
Granted Full applications 14 docs -
Maltings Building Morrison Bowmore Distillers Ltd School Street Bowmore Isle Of Islay Argyll And Bute PA43 7JS
Installation of replacement roof covering
Granted Full applications Roofing -
The Royal Bank Of Scotland Plc Main Street Bowmore Isle Of Islay Argyll And Bute PA43 7JJ
Display of 1 replacement fascia sign and 2 projecting signs (illuminated). Display of nameplate, digital screen and illuminated ATM surround, and vinyl window graphics
Granted Advertising Windows or glazing 20 docs
Other full applications
In Argyll and Bute
-
26/01070/PP Granted
MacLeod Construction Kilmory Industrial Estate Lochgilphead Argyll And Bute PA31 8RR
Formation of accessible access to existing offices, removal of existing stepped entrance and internal alterations to form accessible toilet, kitchen, and private office space
-
26/01578/PP Awaiting decision
Achavit Dunmore Argyll And Bute PA29 6XZ
Erection of extension to dwellinghouse
-
26/00695/PP Granted
Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute
Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant
-
26/01551/PP Awaiting decision
Land Approx 640 Metres West Of Dererach Pennyghael Isle Of Mull Argyll And Bute
Formation of hardstanding for timber stacking and relocation of rock to form small causeway and interface with floating linkspan and barge
-
26/01548/PP Awaiting decision
Ashfield Bungalow Achnamara Argyll And Bute PA31 8PT
Erection of annexe for underground cellar and bar area, double garage and storage buildings and connecting pergola