Planning application
Phase 2 Grianach Drive Port Appin Argyll And Bute
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of 6 dwellinghouses, formation of play area and proposed landscaping
As published by the council, reference 25/00160/PP
Application record
- Reference
- 25/00160/PP
- Type
- Planning Permission
- Status
- Decided
- Decision
- Granted As published: Application Approved
- Received
- 3 Feb 2025
- Validated
- 20 Feb 2025
- Decided
- 4 Jun 2025
- Ward
- Oban North And Lorn
- Parish
- Appin Community Council
- Decision by
- Local Delegated Decision
Site history
Applications at this address on the Argyll and Bute register
This site has had 2 applications since 2025: 2 approved, 0 refused.
-
25/00160/DOC01 Granted
Phase 2 Grianach Drive Port Appin Argyll And Bute
Request to discharge conditions relative to application 25/00160/PP. Specifically conditions 2, 3, 4, 7 and 8
Timeline
Dates from the published record
-
3 Feb 2025
Received by Argyll and Bute
-
20 Feb 2025
Validated
Checked as complete and ready for consideration.
-
4 Jun 2025
Decision issued: Application Approved
-
24 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
2 later applications on the register refer to this one:
-
25/01390/DOC01 Granted
Halfway Filling Station Dunbeg Argyll And Bute PA37 1PX
Request to discharge conditions relative to application 25/00160/PP. Specifically condition 2.
-
25/00160/DOC01 Granted
Phase 2 Grianach Drive Port Appin Argyll And Bute
Request to discharge conditions relative to application 25/00160/PP. Specifically conditions 2, 3, 4, 7 and 8
Documents
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Argyll and Bute granted permission on 4 June 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Phase 2 Grianach Drive Port Appin Argyll And Bute
Request to discharge conditions relative to application 25/00160/PP. Specifically conditions 2, 3, 4, 7 and 8
Granted Conditions -
Land North Of Bealach-na-mara Port Appin Argyll And Bute
Erection of 6 dwellinghouses and formation of vehicular access
Granted Full applications 41 docsSeveral homes -
Land North Of Bealach-Na-Mara Port Appin Argyll And Bute
Non material amendment to planning permission ref. 21/01259/PP (Erection of 6 dwellinghouses and formation of vehicular access) Plot 5 and 6 orientation rotated
Granted Amendments 8 docsSeveral homes -
Garden Ground Of Sycheida Port Appin Argyll And Bute
Site for the erection of dwellinghouse
Granted OutlineDomestic -
The Skerries Port Appin Argyll And Bute PA38 4DE
Formation of agricultural track
Granted Full applications -
Other full applications
In Argyll and Bute
-
26/01070/PP Granted
MacLeod Construction Kilmory Industrial Estate Lochgilphead Argyll And Bute PA31 8RR
Formation of accessible access to existing offices, removal of existing stepped entrance and internal alterations to form accessible toilet, kitchen, and private office space
-
26/01578/PP Awaiting decision
Achavit Dunmore Argyll And Bute PA29 6XZ
Erection of extension to dwellinghouse
-
26/00695/PP Granted
Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute
Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant
-
26/01551/PP Awaiting decision
Land Approx 640 Metres West Of Dererach Pennyghael Isle Of Mull Argyll And Bute
Formation of hardstanding for timber stacking and relocation of rock to form small causeway and interface with floating linkspan and barge
-
26/01548/PP Awaiting decision
Ashfield Bungalow Achnamara Argyll And Bute PA31 8PT
Erection of annexe for underground cellar and bar area, double garage and storage buildings and connecting pergola