Planning application
Dunbeg Phase 4 Dunbeg Argyll And Bute
Works: New dwelling
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Formation of new roads and roundabouts in detail to serve residential development (Dunbeg Residential Area Phase 4), and mixed use development (Dunbeg Commercial Area) including ground remodelling; above and below ground infrastructure, including SUDs; core path crossing point; and landscaping, including biodiversity enhancement
As published by the council, reference 24/02248/PP
Application record
- Reference
- 24/02248/PP
- Type
- Planning Permission
- Status
- Decided
- Decision
- Granted As published: Application Approved
- Received
- 9 Dec 2024
- Validated
- 24 Feb 2025
- Decided
- 30 Mar 2026
- Ward
- Oban North And Lorn
- Parish
- Dunbeg Community Council
- Decision by
- Major Delegated Decision
Site history
Applications at this address on the Argyll and Bute register
This site has had 3 applications since 2024: 3 approved, 0 refused.
-
24/02246/PP Granted
Dunbeg Phase 4 Dunbeg Argyll And Bute
Residential development comprising social housing (236 units), student accommodation (31 units) and retirement accommodation (33 units), with shared community space; EV charging points; roads, including connection to previously consented roundabout, parking, and servicing areas; ground remodelling; above ground and below ground infrastructure, including SUDs; open space and landscaping, including biodiversity enhancement; modification to core path network; and peat management and restoration
-
24/02245/PPP Granted
Dunbeg Phase 4 Dunbeg Argyll And Bute
Mixed use development in principle for Dunbeg commercial area comprising two food and drink units (Class 3), including drive throughs; business units (Class 4), offices and light industry; storage and distribution units (Class 6); hotel (Class 7); park and ride; EV charging points; new roads, including link to previously consented roundabout, parking and servicing areas; ground remodelling; above ground and below ground infrastructure; SUDs; landscaping and biodiversity enhancement
Timeline
Dates from the published record
-
9 Dec 2024
Received by Argyll and Bute
-
24 Feb 2025
Validated
Checked as complete and ready for consideration.
-
30 Mar 2026
Decision issued: Application Approved
-
24 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Argyll and Bute granted permission on 30 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Dunbeg Phase 4 Dunbeg Argyll And Bute
Mixed use development in principle for Dunbeg commercial area comprising two food and drink units (Class 3), including drive throughs; business units (Class 4), offices and light industry; storage and distribution units (Class 6); hotel (Class 7); park and ride; EV charging points; new roads, including link to previously consented roundabout, parking and servicing areas; ground remodelling; above ground and below ground infrastructure; SUDs; landscaping and biodiversity enhancement
Granted Outline -
Land North West Of Pennyfuir Cottage Oban Argyll And Bute
Installation of 11 metre light wooden pole
Withdrawn Telecoms -
Land Opposite Pennyfuir Cottage Dunbeg Argyll And Bute
Installation of 1 x 11M wooden light pole
Withdrawn Telecoms -
Garden Ground Of Pennyfuir Cottage Dunbeg Oban Argyll And Bute
Erection of 2 glamping pods for short term holiday letting use (retrospective)
Granted Full applications 20 docs -
Dunbeg Phase 4 Land West Of Dunstaffnage Mains Farm Dunbeg Argyll And Bute
Scoping Opinion for Dunbeg Phase 4 housing development
Decided Outline 21 docs -
Halfway Filling Station Dunbeg Argyll And Bute PA37 1PX
Request to discharge conditions relative to application 25/00160/PP. Specifically condition 2.
Granted Conditions
Other full applications
In Argyll and Bute
-
26/01070/PP Granted
MacLeod Construction Kilmory Industrial Estate Lochgilphead Argyll And Bute PA31 8RR
Formation of accessible access to existing offices, removal of existing stepped entrance and internal alterations to form accessible toilet, kitchen, and private office space
-
26/01578/PP Awaiting decision
Achavit Dunmore Argyll And Bute PA29 6XZ
Erection of extension to dwellinghouse
-
26/00695/PP Granted
Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute
Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant
-
26/01551/PP Awaiting decision
Land Approx 640 Metres West Of Dererach Pennyghael Isle Of Mull Argyll And Bute
Formation of hardstanding for timber stacking and relocation of rock to form small causeway and interface with floating linkspan and barge
-
26/01548/PP Awaiting decision
Ashfield Bungalow Achnamara Argyll And Bute PA31 8PT
Erection of annexe for underground cellar and bar area, double garage and storage buildings and connecting pergola