Planning application
Filling Station Crossapol Isle Of Tiree Argyll And Bute PA77 6UP
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of solar PV panels and battery storage and associated works
As published by the council, reference 24/01950/PP
Application record
- Reference
- 24/01950/PP
- Type
- Planning Permission
- Status
- Decided
- Decision
- Granted As published: Application Approved
- Received
- 28 Oct 2024
- Validated
- 25 Nov 2024
- Decided
- 25 Mar 2025
- Ward
- Oban South And The Isles
- Parish
- Tiree Community Council
- Decision by
- Local Delegated Decision
- Postcode
- PA77 6UP
Timeline
Dates from the published record
-
28 Oct 2024
Received by Argyll and Bute
-
25 Nov 2024
Validated
Checked as complete and ready for consideration.
-
25 Mar 2025
Decision issued: Application Approved
-
26 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
37 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Argyll and Bute granted permission on 25 March 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land East Of MacLeods Store Crossapol Isle Of Tiree Argyll And Bute
Erection of a self service community fuel station, with all related infrastructure and drainage required to operate the facility safely
Granted Full applications 67 docs -
Tiree Business Centre Crossapol Isle Of Tiree Argyll And Bute PA77 6UP
Installation of 9 air source heat pumps
Granted Full applications 19 docs -
Ionad Iomairt Thiriodh Crossapol Isle Of Tiree Argyll And Bute PA77 6UP
Installation of ground mounted solar PV panels and erection of battery storage building
Withdrawn Full applications -
Ionad Iomairt Thiriodh Crossapol Isle Of Tiree Argyll And Bute PA77 6UP
Request to discharge conditions relative to application 25/00388/PP - specifically conditions 1,2,3 and 4
Withdrawn Conditions -
Ionad Iomairt Thiriodh Crossapol Isle Of Tiree Argyll And Bute PA77 6UP
Installation of ground mounted solar PV panels and erection of battery storage building
Granted Full applications -
Ionad Iomairt Thiriodh Crossapol Isle Of Tiree Argyll And Bute PA77 6UP
Request to discharge conditions relative to application 25/01801/PP. Specifically conditions 1, 2, and 3
Granted Conditions
Other full applications
In Argyll and Bute
-
26/01070/PP Granted
MacLeod Construction Kilmory Industrial Estate Lochgilphead Argyll And Bute PA31 8RR
Formation of accessible access to existing offices, removal of existing stepped entrance and internal alterations to form accessible toilet, kitchen, and private office space
-
26/01578/PP Awaiting decision
Achavit Dunmore Argyll And Bute PA29 6XZ
Erection of extension to dwellinghouse
-
26/00695/PP Granted
Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute
Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant
-
26/01551/PP Awaiting decision
Land Approx 640 Metres West Of Dererach Pennyghael Isle Of Mull Argyll And Bute
Formation of hardstanding for timber stacking and relocation of rock to form small causeway and interface with floating linkspan and barge
-
26/01548/PP Awaiting decision
Ashfield Bungalow Achnamara Argyll And Bute PA31 8PT
Erection of annexe for underground cellar and bar area, double garage and storage buildings and connecting pergola