Planning application
Land West Of Kilona Isle Of Iona Argyll And Bute
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of dwellinghouse and self-contained dwelling with studio, installation of septic tank and air source heat pumps, and formation of new vehicular access
As published by the council, reference 24/01700/PP
Application record
- Reference
- 24/01700/PP
- Type
- Planning Permission
- Status
- Decided
- Decision
- Application Approved
- Received
- 13 Sep 2024
- Validated
- 11 Oct 2024
- Decided
- 17 Dec 2024
- Ward
- Oban South And The Isles
- Parish
- Iona Community Council
- Decision by
- Local Delegated Decision
Timeline
Dates from the published record
-
13 Sep 2024
Received by Argyll and Bute
-
11 Oct 2024
Validated
Checked as complete and ready for consideration.
-
17 Dec 2024
Decision issued: Application Approved
-
6 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
23 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Land West Of Machair Isle Of Iona Argyll And Bute
Request to discharge conditions relative to application 25/00440/PP. Specifically conditions 4 and 5
Decided Conditions
Other full applications applications
In Argyll and Bute
-
26/00695/PP Granted
Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute
Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant
-
25/01665/PP Withdrawn
Land East Of Former Gunpowder Store Kames Argyll And Bute
Erection of dwellinghouse and shed. Installation of septic tank and soakaway and formation of access track
-
25/00238/PP Granted
Iain Woodrow Electrical Glenegedale Industrial Estate Glenegedale Port Ellen Isle Of Islay Argyll And Bute PA42 7AS
Erection of 2 pods for short term letting and associated works
-
26/00550/PP Granted
7 Duchess Drive Helensburgh Argyll And Bute G84 9PR
Erection of single storey front extension
-
26/00652/PP Granted
The Old Stables 7 Kennedy Drive Helensburgh Argyll And Bute G84 9AR
Demolition of existing extensions and bay window and erection of new single storey extensions