Planning application
Beinn An Tuirc Windfarm Bellochantuy Campbeltown Argyll And Bute
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Application under Section 42 to Vary Condition 2 of Planning Permission 98/00597/DET (Erection of 46 wind turbines and associated infrastructure) - to extend the operational lifespan for an additional 6 years to 2034
As published by the council, reference 24/01681/PP
Application record
- Reference
- 24/01681/PP
- Type
- Planning Permission
- Status
- Awaiting decision
- Decision
- Permitted
- Received
- 11 Sep 2024
- Validated
- 16 Sep 2024
- Decided
- 5 Feb 2026
- Ward
- Kintyre And The Islands
- Parish
- West Kintyre Community Council
Timeline
Dates from the published record
-
11 Sep 2024
Received by Argyll and Bute
-
16 Sep 2024
Validated
Checked as complete and ready for consideration.
-
5 Feb 2026
Decision issued: Permitted
-
6 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
35 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Argyll and Bute granted permission on 5 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Argyll and Bute
-
26/00695/PP Granted
Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute
Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant
-
25/01665/PP Withdrawn
Land East Of Former Gunpowder Store Kames Argyll And Bute
Erection of dwellinghouse and shed. Installation of septic tank and soakaway and formation of access track
-
25/00238/PP Granted
Iain Woodrow Electrical Glenegedale Industrial Estate Glenegedale Port Ellen Isle Of Islay Argyll And Bute PA42 7AS
Erection of 2 pods for short term letting and associated works
-
26/00550/PP Granted
7 Duchess Drive Helensburgh Argyll And Bute G84 9PR
Erection of single storey front extension
-
26/00652/PP Granted
The Old Stables 7 Kennedy Drive Helensburgh Argyll And Bute G84 9AR
Demolition of existing extensions and bay window and erection of new single storey extensions