Planning application
Taobhan Achadh Ford Lochgilphead Argyll And Bute PA31 8RJ
Works: Extension Demolition Domestic
Read from the description, not a valuation. How we read the register
Relates to 21/00554/PP
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Renewal of planning permission reference 21/00554/PP (Alterations and extensions to dwellinghouse including formation of decking areas, demolition of existing garage and erection of replacement garage)
As published by the council, reference 24/01501/PP
Application record
- Reference
- 24/01501/PP
- Type
- Planning Permission
- Status
- Decided
- Decision
- Granted As published: Application Approved
- Received
- 15 Aug 2024
- Validated
- 21 Aug 2024
- Decided
- 5 Nov 2024
- Ward
- Mid Argyll
- Parish
- Dunadd Community Council
- Decision by
- Local Delegated Decision
- Postcode
- PA31 8RJ
Timeline
Dates from the published record
-
15 Aug 2024
Received by Argyll and Bute
-
21 Aug 2024
Validated
Checked as complete and ready for consideration.
-
5 Nov 2024
Decision issued: Application Approved
-
16 Sep 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
21/00554/PP Granted
Taobhan Achadh Ford Argyll And Bute PA31 8RJ
Alterations and extensions to dwellinghouse including formation of decking areas, demolition of existing garage and erection of replacement garage
Who's behind it
Company information only, from the register and Companies House
Architecture Limited Agent, an architecture practice registered in Kilmarnock
Dissolved · incorporated 1992 · Kilmarnock
36 applications on PlanIndex · across 23 councils · 87% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Argyll and Bute granted permission on 5 November 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Taobhan Achadh Ford Argyll And Bute PA31 8RJ
Alterations and extensions to dwellinghouse including formation of decking areas, demolition of existing garage and erection of replacement garage
Granted Full applications Extension Demolition 10 docsDomestic -
Ford Church Ford Argyll And Bute PA31 8RH
97% historically approved · decision due ~24 Jun
Alterations to artist's studio to include installation of new rooflight and glazed doors, and erection of outdoor terrace/decking
Awaiting decision Full applications Loft or dormer Windows or glazing -
Land Outside Telephone Exchange Balure Road Ford Argyll And Bute
Installation of subtended headend sidepod onto existing cabinet
Withdrawn Telecoms -
3 Finnish Houses Ford Lochgilphead Argyll And Bute PA31 8RH
Replacement of front and rear porch with front and rear extension and erection of side extension
Granted Full applications Extension 13 docsSmall domestic -
3 Finnish Houses Ford Lochgilphead Argyll And Bute PA31 8RH
Non material amendment to 24/01575/PP - ( Replacement of front and rear porch with front and rear extension and erection of side extension) Amended - Replace previously specified timber cladding on the gable extension with Cedral fibre-cement weatherboard cladding. The Cedral lap timber-effect boards will be installed vertically in a board-on-board arrangement.
Granted Amendments ExtensionSmall domestic -
Telecommunications Mast North East Of 6 Finnish Houses (Ford Tree Line) Ford Argyll And Bute
Upgrade of existing telecommunications base station, comprising the addition of 1 generator and ancillary development thereto
Decided Telecoms
Other full applications
In Argyll and Bute
-
26/01578/PP Awaiting decision
Achavit Dunmore Argyll And Bute PA29 6XZ
Erection of extension to dwellinghouse
-
26/00695/PP Granted
Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute
Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant
-
26/01551/PP Awaiting decision
Land Approx 640 Metres West Of Dererach Pennyghael Isle Of Mull Argyll And Bute
Formation of hardstanding for timber stacking and relocation of rock to form small causeway and interface with floating linkspan and barge
-
26/01548/PP Awaiting decision
Ashfield Bungalow Achnamara Argyll And Bute PA31 8PT
Erection of annexe for underground cellar and bar area, double garage and storage buildings and connecting pergola
-
25/01665/PP Withdrawn
Land East Of Former Gunpowder Store Kames Argyll And Bute
Erection of dwellinghouse and shed. Installation of septic tank and soakaway and formation of access track