Planning application
Highland Cottage, Rose Cottage, Thistle Cottage And Studio Isle Of Iona Argyll And Bute PA76 6SJ
Works: Demolition Windows or glazing Domestic
Read from the description, not a valuation. How we read the register
Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.
Proposal
Alterations and installation of replacement windows and doors to dwellinghouse, and demolition and reconfiguration of ancillary accommodation
As published by the council, reference 24/00843/PP
Application record
- Reference
- 24/00843/PP
- Type
- Planning Permission
- Status
- Decided
- Decision
- Withdrawn As published: Application Withdrawn
- Received
- 8 May 2024
- Validated
- 10 Jul 2024
- Decided
- 15 Nov 2024
- Ward
- Oban South And The Isles
- Parish
- Iona Community Council
- Decision by
- Local Delegated Decision
- Postcode
- PA76 6SJ
Timeline
Dates from the published record
-
8 May 2024
Received by Argyll and Bute
-
10 Jul 2024
Validated
Checked as complete and ready for consideration.
-
15 Nov 2024
Decision issued: Application Withdrawn
-
2 Oct 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
37 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat withdrawal means
The applicant withdrew this application before Argyll and Bute decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Highland Cottage Isle Of Iona Argyll And Bute PA76 6SJ
Refurbishment of Highland Cottage to improve it's sustainability and demolition and reconfiguration of sections of existing ancillary accommodation to improve their use and appearance
Granted Full applications Demolition 34 docs -
Argyll Hotel Isle Of Iona Argyll And Bute PA76 6SJ
Erection of 2 accommodation pods
Granted Full applications -
Staffa Cottage Isle Of Iona Argyll And Bute PA76 6SJ
Request to discharge conditions relative to application 24/01512/PP. Specifically conditions 4 and 5
Granted Conditions -
Staffa Cottage Isle Of Iona Argyll And Bute PA76 6SJ
Complete demolition of existing extensions and outbuilding
Granted Heritage and listed buildings Extension Demolition 23 docs -
Staffa Cottage Isle Of Iona Argyll And Bute PA76 6SJ
Alterations to dwellinghouse, demolition of existing extensions and outbuildings and erection of replacement rear extensions and ancillary dwellinghouse
Granted Full applications Extension Demolition 26 docsDomestic -
Tigh-Na-Beargh Isle Of Iona Argyll And Bute PA76 6SJ
Installation of external insulated wall cladding system to dwellinghouse
Granted Full applications 19 docsDomestic
Other full applications
In Argyll and Bute
-
26/01578/PP Awaiting decision
Achavit Dunmore Argyll And Bute PA29 6XZ
Erection of extension to dwellinghouse
-
26/00695/PP Granted
Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute
Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant
-
26/01551/PP Awaiting decision
Land Approx 640 Metres West Of Dererach Pennyghael Isle Of Mull Argyll And Bute
Formation of hardstanding for timber stacking and relocation of rock to form small causeway and interface with floating linkspan and barge
-
26/01548/PP Awaiting decision
Ashfield Bungalow Achnamara Argyll And Bute PA31 8PT
Erection of annexe for underground cellar and bar area, double garage and storage buildings and connecting pergola
-
25/01665/PP Withdrawn
Land East Of Former Gunpowder Store Kames Argyll And Bute
Erection of dwellinghouse and shed. Installation of septic tank and soakaway and formation of access track