Skip to content
PlanIndex Get alerts
Menu

Planning application

Land Approximately 2.5 Km South West Of Cladich Argyll And Bute

Granted Argyll and Bute 24/00260/PP Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Section 42 application for the removal of condition 11 relative to planning permission reference 22/00782/PP (To construct and operate a 132/275 kilovolt (kV) GIS substation and associated infrastructure that will connect the existing 132 kV overhead line (OHL) from Taynuilt to Inveraray to a proposed 275 kV OHL to Dalmally. The works will comprise cut and fill to tie the platform into the existing ground level, landscaping, Sustainable Drainage Systems (SuDS) basins, new permanent access and upgrades to existing tracks)

As published by the council, reference 24/00260/PP

Application record

Reference
24/00260/PP
Type
Planning Permission
Status
Decided
Decision
Granted As published: Application Approved
Received
12 Feb 2024
Validated
15 Feb 2024
Decided
23 Oct 2024
Ward
Oban North And Lorn
Parish
Glenorchy And Inishail Community Council
Decision by
Major Committee Decision

Site history

Applications at this address on the Argyll and Bute register

This site has had 3 applications since 2024: 3 approved, 0 refused.

  • 24/01880/NMA Granted

    Land Approximately 2.5 Km South West Of Cladich Argyll And Bute

    Non material amendment to planning permission 22/00782/PP (To construct and operate a 132/275 kilovolt (kV) GIS substation and associated infrastructure. The finished platform level for the substation has been reduced from 209.00 m A.O.D. to 208.00 m A.O.D. and the external dimensions of the 2 main substation buildings have been reduced in size.

    Decided 11 Dec 2024 Amendments
  • 24/00914/PP Granted

    Land Approximately 2.5 Km South West Of Cladich Argyll And Bute

    Proposed Sustainable Drainage Systems (SuDS) pond and formation of part of an access track

    Decided 15 Jan 2025 Full applications

Timeline

Dates from the published record

  1. 12 Feb 2024

    Received by Argyll and Bute

  2. 15 Feb 2024

    Validated

    Checked as complete and ready for consideration.

  3. 23 Oct 2024

    Decision issued: Application Approved

  4. 6 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

29 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Argyll and Bute granted permission on 23 October 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Land Approximately 2.5 Km South West Of Cladich Argyll And Bute

    24/01880/NMA Submitted 15 Oct 2024 50 yards away

    Non material amendment to planning permission 22/00782/PP (To construct and operate a 132/275 kilovolt (kV) GIS substation and associated infrastructure. The finished platform level for the substation has been reduced from 209.00 m A.O.D. to 208.00 m A.O.D. and the external dimensions of the 2 main substation buildings have been reduced in size.

    Granted Amendments 11 docs
  • Land Approximately 2.5 Km South West Of Cladich Argyll And Bute

    24/00914/PP Submitted 20 May 2024 200 yards away

    Proposed Sustainable Drainage Systems (SuDS) pond and formation of part of an access track

    Granted Full applications 28 docs
  • Keppochan Forest Inveraray Argyll And Bute

    23/00714/DOC01 Submitted 22 Jun 2026 200 yards away

    99% historically approved · decision due ~3 Sep

    Request to discharge conditions relative to application 23/00714/S37. Specifically condition 12 & 13

    Awaiting decision Conditions

In Argyll and Bute

  • 26/01070/PP Granted

    MacLeod Construction Kilmory Industrial Estate Lochgilphead Argyll And Bute PA31 8RR

    Formation of accessible access to existing offices, removal of existing stepped entrance and internal alterations to form accessible toilet, kitchen, and private office space

    Received 23 Jun, published by the council 28 Jul 2026 Full applications
  • 26/01578/PP Awaiting decision

    Achavit Dunmore Argyll And Bute PA29 6XZ

    Erection of extension to dwellinghouse

    9 Sep 2026 Full applications
  • 26/00695/PP Granted

    Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute

    Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant

    Received 27 Apr, published by the council 28 Jul 2026 Full applications
  • 26/01551/PP Awaiting decision

    Land Approx 640 Metres West Of Dererach Pennyghael Isle Of Mull Argyll And Bute

    Formation of hardstanding for timber stacking and relocation of rock to form small causeway and interface with floating linkspan and barge

    Received 3 Sep, published by the council 8 Sep 2026 Full applications
  • 26/01548/PP Awaiting decision

    Ashfield Bungalow Achnamara Argyll And Bute PA31 8PT

    Erection of annexe for underground cellar and bar area, double garage and storage buildings and connecting pergola

    Received 3 Sep, published by the council 9 Sep 2026 Full applications