Planning application
Glen Scotia Distillery High Street Campbeltown Argyll And Bute PA28 6DS
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of extension to external tank farm, installation of cooling tower, installation of additional ventilation to still house and reconfiguration of external access staircase
As published by the council, reference 24/00187/PP
Application record
- Reference
- 24/00187/PP
- Type
- Planning Permission
- Status
- Decided
- Decision
- Granted As published: Application Approved
- Received
- 31 Jan 2024
- Validated
- 14 Feb 2024
- Decided
- 12 Mar 2025
- Ward
- South Kintyre
- Parish
- Campbeltown Community Council
- Decision by
- Local Delegated Decision
- Postcode
- PA28 6DS
Site history
Applications at this address on the Argyll and Bute register
This site has had 3 applications since 2024: 3 approved, 0 refused.
-
25/00835/PP Granted
Glen Scotia Distillery High Street Campbeltown Argyll And Bute PA28 6DS
Proposed re-roofing of the existing bonded warehouse and installation of roof vents. Replacement of existing fence and access gate and installation of feature wall
-
24/00186/LIB Granted
Glen Scotia Distillery High Street Campbeltown Argyll And Bute PA28 6DS
Erection of extension to external tank farm, installation of cooling tower, installation of additional ventilation to still house and reconfiguration of external access staircase
Timeline
Dates from the published record
-
31 Jan 2024
Received by Argyll and Bute
-
14 Feb 2024
Validated
Checked as complete and ready for consideration.
-
12 Mar 2025
Decision issued: Application Approved
-
19 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
40 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Argyll and Bute granted permission on 12 March 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Glen Scotia Distillery High Street Campbeltown Argyll And Bute PA28 6DS
Erection of extension to external tank farm, installation of cooling tower, installation of additional ventilation to still house and reconfiguration of external access staircase
Granted Heritage and listed buildings Extension 19 docs -
19-9E John Street, 21-33 John Street, 1-5 Princes Street, 7-15 Princes Street, 17-21 Princes Street And 24-26 High Street Campbeltown Argyll And Bute19-9
Erection of 37 residential units
Granted Full applications -
Glen Scotia Distillery High Street Campbeltown Argyll And Bute PA28 6DS
Proposed re-roofing of the existing bonded warehouse and installation of roof vents. Replacement of existing fence and access gate and installation of feature wall
Granted Full applicationsSmall domestic -
39 Saddell Street Campbeltown Argyll And Bute PA28 6DR
Change of use of garden shed to form dog grooming business (retrospective)
Granted Full applications 17 docsSmall domestic -
Hillpark Princes Street Campbeltown Argyll And Bute PA28 6DU
Demolition of existing dilapidated ground floor extension and erection side extension with terrace
Granted Full applications Extension Demolition 23 docs -
Dalintober School Dalaruan Street Campbeltown Argyll And Bute PA28 6HG
Erection of small extension to primary school kitchen to create larger cooking/prep area, staff office and staff W.C.
Granted Outline Extension 19 docs
Other full applications
In Argyll and Bute
-
26/01578/PP Awaiting decision
Achavit Dunmore Argyll And Bute PA29 6XZ
Erection of extension to dwellinghouse
-
26/00695/PP Granted
Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute
Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant
-
26/01551/PP Awaiting decision
Land Approx 640 Metres West Of Dererach Pennyghael Isle Of Mull Argyll And Bute
Formation of hardstanding for timber stacking and relocation of rock to form small causeway and interface with floating linkspan and barge
-
26/01548/PP Awaiting decision
Ashfield Bungalow Achnamara Argyll And Bute PA31 8PT
Erection of annexe for underground cellar and bar area, double garage and storage buildings and connecting pergola
-
25/01665/PP Withdrawn
Land East Of Former Gunpowder Store Kames Argyll And Bute
Erection of dwellinghouse and shed. Installation of septic tank and soakaway and formation of access track