Planning application
South Ledaig Croft North Connel Oban Argyll And Bute
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of dwellinghouse and installation of air source heat pump and private drainage system
As published by the council, reference 24/00059/PP
Application record
- Reference
- 24/00059/PP
- Type
- Planning Permission
- Status
- Decided
- Decision
- Granted As published: Application Approved
- Received
- 12 Jan 2024
- Validated
- 12 Jan 2024
- Decided
- 19 Mar 2024
- Ward
- Oban North And Lorn
- Parish
- Ardchattan Community Council
- Decision by
- Local Delegated Decision
Timeline
Dates from the published record
-
12 Jan 2024
Received by Argyll and Bute
-
19 Mar 2024
Decision issued: Application Approved
-
2 Oct 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
28 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Argyll and Bute granted permission on 19 March 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Gypsy/Traveller Site Bayview Ledaig Argyll And Bute PA37 1AG
96% historically approved · decision due ~6 Aug
Redevelopment of existing Gypsy/Traveller site, replacing the existing amenity blocks and wardens office with new build chalets with associated infrastructure
Decided New dwelling -
Land North Of The Bunker North Connel Oban Argyll And Bute
Formation of vehicular access
Withdrawn Full applications 23 docs -
Oban Airport North Connel Oban Argyll And Bute PA37 1SW
Erection of office building and hanger area with associated parking and drainage
Granted Full applications 29 docs -
Oban Airport North Connel Argyll And Bute PA37 1SW
Non Material Amendment to Planning Permission 25/00864/PP - (Erection of helicopter hanger building with associated office and sleeping accommodation, together with helipad hard standing and site landscaping/car parking) - elevations adjustments and adjustments to car park layout
Granted Amendments
Other full applications
In Argyll and Bute
-
26/01070/PP Granted
MacLeod Construction Kilmory Industrial Estate Lochgilphead Argyll And Bute PA31 8RR
Formation of accessible access to existing offices, removal of existing stepped entrance and internal alterations to form accessible toilet, kitchen, and private office space
-
26/01578/PP Awaiting decision
Achavit Dunmore Argyll And Bute PA29 6XZ
Erection of extension to dwellinghouse
-
26/00695/PP Granted
Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute
Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant
-
26/01551/PP Awaiting decision
Land Approx 640 Metres West Of Dererach Pennyghael Isle Of Mull Argyll And Bute
Formation of hardstanding for timber stacking and relocation of rock to form small causeway and interface with floating linkspan and barge
-
26/01548/PP Awaiting decision
Ashfield Bungalow Achnamara Argyll And Bute PA31 8PT
Erection of annexe for underground cellar and bar area, double garage and storage buildings and connecting pergola