Planning application
Kilblain Pier Road Tarbert Argyll And Bute PA29 6UG
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Formation of vehicular access, alterations to boundary wall, erection of detached garage and retaining wall
As published by the council, reference 23/02457/PP
Application record
- Reference
- 23/02457/PP
- Type
- Planning Permission
- Status
- Decided
- Decision
- Granted As published: Application Approved
- Received
- 21 Dec 2023
- Validated
- 19 Jan 2024
- Decided
- 28 Aug 2024
- Ward
- Kintyre And The Islands
- Parish
- Tarbert And Skipness Community Council
- Decision by
- Local Delegated Decision
- Postcode
- PA29 6UG
Timeline
Dates from the published record
-
21 Dec 2023
Received by Argyll and Bute
-
19 Jan 2024
Validated
Checked as complete and ready for consideration.
-
28 Aug 2024
Decision issued: Application Approved
-
2 Oct 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Kathryn Macdonald Agent, registered in Beccles
Active · incorporated 2003 · Beccles
50 applications on PlanIndex · 94% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
20 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Argyll and Bute granted permission on 28 August 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Plot 2 Land South Of Fernhill Mealdarroch Tarbert Argyll And Bute
Site for the erection of dwellinghouse
Withdrawn OutlineDomestic -
Plot 1 Land West Of Mealldarroch Road Tarbert Argyll And Bute
Site for the erection of dwellinghouse
Withdrawn OutlineDomestic -
Factory East Pier Pier Road Tarbert Argyll And Bute PA29 6UF
Installation of three portable containers to form one covered refrigerated unit (retrospective), and reduction in height of external wall
Granted Full applications -
East Pier Pier Road Tarbert Argyll And Bute PA29 6UF
Erection of steel enclosure to existing shellfish processing business
Withdrawn Full applications 30 docs
Other full applications
In Argyll and Bute
-
26/01070/PP Granted
MacLeod Construction Kilmory Industrial Estate Lochgilphead Argyll And Bute PA31 8RR
Formation of accessible access to existing offices, removal of existing stepped entrance and internal alterations to form accessible toilet, kitchen, and private office space
-
26/01578/PP Awaiting decision
Achavit Dunmore Argyll And Bute PA29 6XZ
Erection of extension to dwellinghouse
-
26/00695/PP Granted
Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute
Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant
-
26/01551/PP Awaiting decision
Land Approx 640 Metres West Of Dererach Pennyghael Isle Of Mull Argyll And Bute
Formation of hardstanding for timber stacking and relocation of rock to form small causeway and interface with floating linkspan and barge
-
26/01548/PP Awaiting decision
Ashfield Bungalow Achnamara Argyll And Bute PA31 8PT
Erection of annexe for underground cellar and bar area, double garage and storage buildings and connecting pergola