Skip to content
PlanIndex Get alerts
Menu

Planning application

Talatoll Clachan Argyll And Bute

Granted Argyll and Bute 23/02205/PP Planning Permission

Works: Demolition Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of existing dwellinghouse and erection of replacement dwellinghouse, conversion of byre to form 2 self catering units, installation of septic tank and formation vehicular access

As published by the council, reference 23/02205/PP

Application record

Reference
23/02205/PP
Type
Planning Permission
Status
Decided
Decision
Granted As published: Application Approved
Received
16 Nov 2023
Validated
5 Dec 2023
Decided
27 Nov 2024
Ward
Kintyre And The Islands
Parish
West Kintyre Community Council
Decision by
Local Delegated Decision

Site history

Applications at this address on the Argyll and Bute register

This site has had 4 applications since 2019: 3 approved, 0 refused.

  • 26/00786/PP Decided

    Talatoll Clachan Argyll And Bute

    Variation of condition 5 relative to planning permission reference 23/02205/PP (Demolition of existing dwellinghouse and erection of replacement dwellinghouse, conversion of byre to form 2 self catering units, installation of septic tank and formation vehicular access) amendment to the wording from "no development" to "no construction" to allow a meaningful start to be attained

    Submitted 7 May 2026
  • 25/00302/PP Granted

    Talatoll Clachan Argyll And Bute

    Variation of conditions 3 and 4 relative to planning permission reference 23/02205/PP (Demolition of existing dwellinghouse and erection of replacement dwellinghouse, conversion of byre to form 2 self catering units, installation of septic tank and formation vehicular access) amendment to conditions in relation to water supply and contaminated land

    Decided 13 Aug 2025 Full applications
  • 19/02228/FGS Granted

    Talatoll Clachan Argyll And Bute

    Forest Grant Scheme

    Decided 13 Nov 2019

Timeline

Dates from the published record

  1. 16 Nov 2023

    Received by Argyll and Bute

  2. 5 Dec 2023

    Validated

    Checked as complete and ready for consideration.

  3. 27 Nov 2024

    Decision issued: Application Approved

  4. 2 Oct 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

39 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Argyll and Bute granted permission on 27 November 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Talatoll Clachan Argyll And Bute

    25/00302/PP Submitted 26 Feb 2025 100 yards away

    Variation of conditions 3 and 4 relative to planning permission reference 23/02205/PP (Demolition of existing dwellinghouse and erection of replacement dwellinghouse, conversion of byre to form 2 self catering units, installation of septic tank and formation vehicular access) amendment to conditions in relation to water supply and contaminated land

    Granted Full applications Demolition
    Domestic

In Argyll and Bute

  • 26/01070/PP Granted

    MacLeod Construction Kilmory Industrial Estate Lochgilphead Argyll And Bute PA31 8RR

    Formation of accessible access to existing offices, removal of existing stepped entrance and internal alterations to form accessible toilet, kitchen, and private office space

    Received 23 Jun, published by the council 28 Jul 2026 Full applications
  • 26/01578/PP Awaiting decision

    Achavit Dunmore Argyll And Bute PA29 6XZ

    Erection of extension to dwellinghouse

    9 Sep 2026 Full applications
  • 26/00695/PP Granted

    Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute

    Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant

    Received 27 Apr, published by the council 28 Jul 2026 Full applications
  • 26/01551/PP Awaiting decision

    Land Approx 640 Metres West Of Dererach Pennyghael Isle Of Mull Argyll And Bute

    Formation of hardstanding for timber stacking and relocation of rock to form small causeway and interface with floating linkspan and barge

    Received 3 Sep, published by the council 8 Sep 2026 Full applications
  • 26/01548/PP Awaiting decision

    Ashfield Bungalow Achnamara Argyll And Bute PA31 8PT

    Erection of annexe for underground cellar and bar area, double garage and storage buildings and connecting pergola

    Received 3 Sep, published by the council 9 Sep 2026 Full applications