Planning application
Land West Of Port Ellen Distillery Port Ellen Isle Of Islay Argyll And Bute
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of 2 dwellinghouses with detached garages and formation of vehicular access
As published by the council, reference 23/01996/PP
Application record
- Reference
- 23/01996/PP
- Type
- Planning Permission
- Status
- Decided
- Decision
- Granted As published: Application Approved
- Received
- 11 Oct 2023
- Validated
- 5 Dec 2023
- Decided
- 21 Oct 2024
- Ward
- Kintyre And The Islands
- Parish
- Islay Community Council
- Decision by
- Local Delegated Decision
Timeline
Dates from the published record
-
11 Oct 2023
Received by Argyll and Bute
-
5 Dec 2023
Validated
Checked as complete and ready for consideration.
-
21 Oct 2024
Decision issued: Application Approved
-
2 Oct 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
23 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Argyll and Bute granted permission on 21 October 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Port Ellen Distillery Port Ellen Isle Of Islay Isle Of Islay Argyll And Bute PA42 7AH
91% historically approved · decision due ~24 Apr
Non material amendment to planning permission 19/00917/PP (Erection of a new distillery at the Diageo Port Ellen Maltings site, including provision of new process and guest experience buildings, modification and downtakings of existing buildings, new site infrastructure and hardstandings, external tankfarm, boilerhouse, water treatment plant and SUD's). Updated internal layout to ground and first floor.
Awaiting decision Amendments 16 docs -
Land East Of Dail Na Mara (Imeraval Phase 5) Port Ellen Isle Of Islay Argyll And Bute
Approval of matters specified in conditions 3, 4, 5, and 6 and 7, alongside submission of details pursuant to conditions 9, and 10 relative to planning permission in principle reference 21/00370/PPP (Site for the erection of 20 dwellinghouses with associated access road, footpath, landscaping and play area). *as amended 16.05.24
Granted Conditions 65 docsMajor scheme -
Land East Of Dail Na Mara Port Ellen Isle Of Islay Argyll And Bute
Site for the erection of residential development
Granted Outline New dwelling 12 docs -
Imeraval Phase 6 Land East Of Dail Na Mara Port Ellen Isle Of Islay Argyll And Bute
Erection of 13 terraced and semi-detached dwellinghouses, formation of vehicular access and associated works
Granted Full applications 46 docs -
Caravans Land East Of Dail Na Mara Port Ellen Isle Of Islay Argyll And Bute
91% historically approved · decision due ~17 Sep
Non Material Amendment relatvie to Planning Permission 23/01229/PP (Erection of 13 terraced and semi-detached dwellinghouses, formation of vehicular access and associated works) - Site plan layout has been updated to omit a semi-detached house and include a SUDs pond.
Awaiting decision Amendments New dwelling -
Land North East Of 2 Holystone Glen Port Ellen Isle Of Islay Argyll And Bute PA42 7AH
Non material amendment to planning permission 22/01563/PP (Erection of dwellinghouse and garden room, installation of package treatment plant and associated hard/soft landscaping works) Amended proposed internal floor area has been increased by approximately 6sqm by moving the northern external wall outwards. The roof design now has both of the roof pitches sloping to the rear of the dwelling and the rooflight previously located above the shower room has been removed. New openings in Bedroom 2 and shower room. Level path around perimeter of dwelling has been added. Ground mounted solar PV arrray has been located to rear of site.
Granted Amendments Loft or dormer 15 docsSmall domestic
Other full applications
In Argyll and Bute
-
26/01070/PP Granted
MacLeod Construction Kilmory Industrial Estate Lochgilphead Argyll And Bute PA31 8RR
Formation of accessible access to existing offices, removal of existing stepped entrance and internal alterations to form accessible toilet, kitchen, and private office space
-
26/01578/PP Awaiting decision
Achavit Dunmore Argyll And Bute PA29 6XZ
Erection of extension to dwellinghouse
-
26/00695/PP Granted
Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute
Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant
-
26/01551/PP Awaiting decision
Land Approx 640 Metres West Of Dererach Pennyghael Isle Of Mull Argyll And Bute
Formation of hardstanding for timber stacking and relocation of rock to form small causeway and interface with floating linkspan and barge
-
26/01548/PP Awaiting decision
Ashfield Bungalow Achnamara Argyll And Bute PA31 8PT
Erection of annexe for underground cellar and bar area, double garage and storage buildings and connecting pergola