Skip to content
PlanIndex Get alerts
Menu

Planning application

Croit A'Bhealaich Tayvallich Lochgilphead Argyll And Bute PA31 8PW

Granted Argyll and Bute 23/00915/PP Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of dwellinghouse, installation of septic tank and temporary siting of residential caravan

As published by the council, reference 23/00915/PP

Application record

Reference
23/00915/PP
Type
Planning Permission
Status
Decided
Decision
Granted As published: Application Approved
Received
9 May 2023
Validated
11 Jul 2023
Decided
17 Jan 2024
Ward
Mid Argyll
Parish
North Knapdale Community Council
Decision by
Local Delegated Decision
Postcode
PA31 8PW

Site history

Applications at this address on the Argyll and Bute register

This site has had 2 applications since 2023: 2 approved, 0 refused.

  • 24/00662/NMA Granted

    Croit A'Bhealaich Tayvallich Lochgilphead Argyll And Bute PA31 8PW

    Non material amendment to planning permission 23/00915/PP - (Erection of dwellinghouse, installation of septic tank and temporary siting of residential caravan). Applicant proposes minor changes to window layouts to suit structural form.

    Decided 9 May 2024 Amendments

Timeline

Dates from the published record

  1. 9 May 2023

    Received by Argyll and Bute

  2. 11 Jul 2023

    Validated

    Checked as complete and ready for consideration.

  3. 17 Jan 2024

    Decision issued: Application Approved

  4. 11 Oct 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

31 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Argyll and Bute granted permission on 17 January 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Land Approx 77M North West Of 1 Salen Tayvallich Argyll And Bute

    21/00691/PNAGRI Submitted 26 Mar 2021 50 yards away

    Erection of agricultural building

    Granted Other 10 docs
  • Croit A'Bhealaich Tayvallich Lochgilphead Argyll And Bute PA31 8PW

    24/00662/NMA Submitted 9 Apr 2024 50 yards away

    Non material amendment to planning permission 23/00915/PP - (Erection of dwellinghouse, installation of septic tank and temporary siting of residential caravan). Applicant proposes minor changes to window layouts to suit structural form.

    Granted Amendments Windows or glazing 7 docs
    Domestic
  • 1 Salen Tayvallich Argyll And Bute PA31 8PW

    25/01932/PP Submitted 20 Nov 2025 100 yards away

    Alterations and extension to dwellinghouse and formation of vehicular access

    Granted Full applications Extension
    Domestic
  • Tayvallich Television Station Tayvallich Argyll And Bute

    23/01533/TELNOT Submitted 3 Aug 2023 250 yards away

    Upgrading works to include; Removal and replacement of 3No. Antenna at 17.5m, installation of 1No. GPS at 3m on gantry pole, installation of UHF filter, Installation of 6No. RRUs behind Antenna on support poles. removal of 3No. RRUs and associated ancillary equipment

    Decided Telecoms 7 docs
  • Tayvallich Telecommunications Mast Tayvallich Argyll And Bute

    26/01471/TELNOT Submitted 20 Aug 2026 300 yards away

    Upgrade of existing base station, comprising the installation of a containerised 10kVA permanent back-up power generator with associated fuel apparatus, internal upgrade of existing cabinets, and all ancillary works thereto

    Withdrawn Telecoms
  • B8025 South Of Tayvallich Lochgilphead Argyll And Bute

    23/00278/TELNOT Submitted 14 Feb 2023 300 yards away

    Replacement of 15m high telegraph pole with new 15m high pole. Installation of GPS node and associated ancillary equipment. Replacement of cabinet at ground level

    Granted Telecoms 8 docs

In Argyll and Bute

  • 26/01070/PP Granted

    MacLeod Construction Kilmory Industrial Estate Lochgilphead Argyll And Bute PA31 8RR

    Formation of accessible access to existing offices, removal of existing stepped entrance and internal alterations to form accessible toilet, kitchen, and private office space

    Received 23 Jun, published by the council 28 Jul 2026 Full applications
  • 26/01578/PP Awaiting decision

    Achavit Dunmore Argyll And Bute PA29 6XZ

    Erection of extension to dwellinghouse

    9 Sep 2026 Full applications
  • 26/00695/PP Granted

    Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute

    Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant

    Received 27 Apr, published by the council 28 Jul 2026 Full applications
  • 26/01551/PP Awaiting decision

    Land Approx 640 Metres West Of Dererach Pennyghael Isle Of Mull Argyll And Bute

    Formation of hardstanding for timber stacking and relocation of rock to form small causeway and interface with floating linkspan and barge

    Received 3 Sep, published by the council 8 Sep 2026 Full applications
  • 26/01548/PP Awaiting decision

    Ashfield Bungalow Achnamara Argyll And Bute PA31 8PT

    Erection of annexe for underground cellar and bar area, double garage and storage buildings and connecting pergola

    Received 3 Sep, published by the council 9 Sep 2026 Full applications