Skip to content
PlanIndex Get alerts
Menu

Planning application

Garden Ground Of Pennyfuir Cottage Dunbeg Oban Argyll And Bute

Granted Argyll and Bute 23/00506/PP Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of 2 glamping pods for short term holiday letting use (retrospective)

As published by the council, reference 23/00506/PP

Application record

Reference
23/00506/PP
Type
Planning Permission
Status
Decided
Decision
Granted As published: Application Approved
Received
13 Mar 2023
Validated
23 May 2023
Decided
20 Dec 2023
Ward
Oban North And Lorn
Parish
Oban Community Council
Decision by
Local Delegated Decision

Timeline

Dates from the published record

  1. 13 Mar 2023

    Received by Argyll and Bute

  2. 23 May 2023

    Validated

    Checked as complete and ready for consideration.

  3. 20 Dec 2023

    Decision issued: Application Approved

  4. 11 Oct 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

20 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Argyll and Bute granted permission on 20 December 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Land Opposite Pennyfuir Cottage Dunbeg Argyll And Bute

    26/00820/TELNOT Submitted 13 May 2026 50 yards away

    Installation of 1 x 11M wooden light pole

    Withdrawn Telecoms
  • Land North West Of Pennyfuir Cottage Oban Argyll And Bute

    26/00548/TELNOT Submitted 25 Mar 2026 50 yards away

    Installation of 11 metre light wooden pole

    Withdrawn Telecoms
  • Halfway Filling Station Dunbeg Argyll And Bute PA37 1PX

    25/01390/DOC01 Submitted 12 Jan 2026 150 yards away

    Request to discharge conditions relative to application 25/00160/PP. Specifically condition 2.

    Granted Conditions
  • Halfway Filling Station Dunbeg Oban Argyll And Bute PA37 1PX

    24/02095/ADV Submitted 20 Nov 2024 150 yards away

    Installation of illuminated ATM surround signage

    Granted Advertising 13 docs
  • Halfway Filling Station Dunbeg Argyll And Bute PA37 1PX

    25/01390/PP Submitted 20 Aug 2025 200 yards away

    Removal of 2x existing containers and fenced bin area, erection of single storey side and rear extension to provide enlarged retail shop floor, new kitchen facilities, seating area for customers and storage and toilet facilities. Upgrade of rear concrete hardstanding to accommodate 15 additional parking spaces and formation of new access road linking the forecourt to the rear parking

    Granted Full applications Extension
    Small domestic
  • Dunbeg Phase 4 Dunbeg Argyll And Bute

    24/02245/PPP Submitted 9 Dec 2024 300 yards away

    Mixed use development in principle for Dunbeg commercial area comprising two food and drink units (Class 3), including drive throughs; business units (Class 4), offices and light industry; storage and distribution units (Class 6); hotel (Class 7); park and ride; EV charging points; new roads, including link to previously consented roundabout, parking and servicing areas; ground remodelling; above ground and below ground infrastructure; SUDs; landscaping and biodiversity enhancement

    Granted Outline

In Argyll and Bute

  • 26/01070/PP Granted

    MacLeod Construction Kilmory Industrial Estate Lochgilphead Argyll And Bute PA31 8RR

    Formation of accessible access to existing offices, removal of existing stepped entrance and internal alterations to form accessible toilet, kitchen, and private office space

    Received 23 Jun, published by the council 28 Jul 2026 Full applications
  • 26/01578/PP Awaiting decision

    Achavit Dunmore Argyll And Bute PA29 6XZ

    Erection of extension to dwellinghouse

    9 Sep 2026 Full applications
  • 26/00695/PP Granted

    Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute

    Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant

    Received 27 Apr, published by the council 28 Jul 2026 Full applications
  • 26/01551/PP Awaiting decision

    Land Approx 640 Metres West Of Dererach Pennyghael Isle Of Mull Argyll And Bute

    Formation of hardstanding for timber stacking and relocation of rock to form small causeway and interface with floating linkspan and barge

    Received 3 Sep, published by the council 8 Sep 2026 Full applications
  • 26/01548/PP Awaiting decision

    Ashfield Bungalow Achnamara Argyll And Bute PA31 8PT

    Erection of annexe for underground cellar and bar area, double garage and storage buildings and connecting pergola

    Received 3 Sep, published by the council 9 Sep 2026 Full applications