Skip to content
PlanIndex Get alerts
Menu

Planning application

Ardchiavaig House Bunessan Isle Of Mull Argyll And Bute PA67 6DT

Granted Argyll and Bute 23/00394/PP Planning Permission

Works: Extension

Relates to 21/00186/PP

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of one and a half storey side extension (Amended design relative to planning permission 21/00186/PP - Erection of one and a half storey side extension)

As published by the council, reference 23/00394/PP

Application record

Reference
23/00394/PP
Type
Planning Permission
Status
Decided
Decision
Granted As published: Application Approved
Received
1 Mar 2023
Validated
1 Mar 2023
Decided
26 Apr 2023
Ward
Oban South And The Isles
Parish
Mull Community Council
Decision by
Local Delegated Decision
Postcode
PA67 6DT

Site history

Applications at this address on the Argyll and Bute register

This site has had 2 applications since 2021: 2 approved, 0 refused.

  • 21/00186/PP Granted

    Ardchiavaig House Bunessan Isle Of Mull Argyll And Bute PA67 6DT

    Erection of one and half storey side extension

    Decided 24 Aug 2021 Full applications

Timeline

Dates from the published record

  1. 1 Mar 2023

    Received by Argyll and Bute

  2. 26 Apr 2023

    Decision issued: Application Approved

  3. 6 Sep 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 21/00186/PP Granted

    Ardchiavaig House Bunessan Isle Of Mull Argyll And Bute PA67 6DT

    Erection of one and half storey side extension

    Decided 24 Aug 2021 Full applications

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Argyll and Bute granted permission on 26 April 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Argyll and Bute

  • 26/01070/PP Granted

    MacLeod Construction Kilmory Industrial Estate Lochgilphead Argyll And Bute PA31 8RR

    Formation of accessible access to existing offices, removal of existing stepped entrance and internal alterations to form accessible toilet, kitchen, and private office space

    Received 23 Jun, published by the council 28 Jul 2026 Full applications
  • 26/01578/PP Awaiting decision

    Achavit Dunmore Argyll And Bute PA29 6XZ

    Erection of extension to dwellinghouse

    9 Sep 2026 Full applications
  • 26/00695/PP Granted

    Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute

    Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant

    Received 27 Apr, published by the council 28 Jul 2026 Full applications
  • 26/01551/PP Awaiting decision

    Land Approx 640 Metres West Of Dererach Pennyghael Isle Of Mull Argyll And Bute

    Formation of hardstanding for timber stacking and relocation of rock to form small causeway and interface with floating linkspan and barge

    Received 3 Sep, published by the council 8 Sep 2026 Full applications
  • 26/01548/PP Awaiting decision

    Ashfield Bungalow Achnamara Argyll And Bute PA31 8PT

    Erection of annexe for underground cellar and bar area, double garage and storage buildings and connecting pergola

    Received 3 Sep, published by the council 9 Sep 2026 Full applications