Planning application
Dungallan House Hotel Gallanach Road Oban Argyll And Bute PA34 4PD
Works: Loft or dormer
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of rooflights and internal works to form en-suite, dressing area and sauna within roof space to an existing bedroom
As published by the council, reference 22/02618/LIB
Application record
- Reference
- 22/02618/LIB
- Type
- Application for Listed Building Consent
- Status
- Decided
- Decision
- Granted As published: Application Approved
- Received
- 23 Dec 2022
- Validated
- 23 Jan 2023
- Decided
- 6 Apr 2023
- Ward
- Oban South And The Isles
- Parish
- Oban Community Council
- Decision by
- Local Delegated Decision
- Postcode
- PA34 4PD
Site history
Applications at this address on the Argyll and Bute register
This site has had 7 applications since 2022: 4 approved, 0 refused.
-
26/01696/PP Awaiting decision
Dungallan House Hotel Gallanach Road Oban Argyll And Bute PA34 4PD
Siting of 4 holiday cabins and associated works
-
25/02022/LIB Granted
Dungallan House Hotel Gallanach Road Oban Argyll And Bute PA34 4PD
Proposed internal alterations
-
24/02302/NMA Withdrawn
Dungallan House Hotel Gallanach Road Oban Argyll And Bute PA34 4PD
Non material amendment relative to Planning Permission 24/01699/PP Erection of 2 staff accommodation buildings - Buildings 1 and 2 moved together, building 2 mirrored, windows and door positions amended for both, steps, gate and path added to south end, existing gate and steps removed at north end
-
24/01699/PP Granted
Dungallan House Hotel Gallanach Road Oban Argyll And Bute PA34 4PD
Erection of 2 staff accommodation buildings
-
24/01698/LIB Withdrawn
Dungallan House Hotel Gallanach Road Oban Argyll And Bute PA34 4PD
Erection of 2 staff accommodation buildings
-
22/02617/PP Granted
Dungallan House Hotel Gallanach Road Oban Argyll And Bute PA34 4PD
Installation of rooflights
Timeline
Dates from the published record
-
23 Dec 2022
Received by Argyll and Bute
-
23 Jan 2023
Validated
Checked as complete and ready for consideration.
-
6 Apr 2023
Decision issued: Application Approved
-
2 Oct 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Argyll and Bute granted permission on 6 April 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Dungallan House Hotel Gallanach Road Oban Argyll And Bute PA34 4PD
Installation of rooflights
Granted Full applications Loft or dormer 12 docs -
Dungallan House Hotel Gallanach Road Oban Argyll And Bute PA34 4PD
Erection of 2 staff accommodation buildings
Granted Full applications 19 docs -
Dungallan House Hotel Gallanach Road Oban Argyll And Bute PA34 4PD
Erection of 2 staff accommodation buildings
Withdrawn Heritage and listed buildings 11 docs -
Dungallan House Hotel Gallanach Road Oban Argyll And Bute PA34 4PD
Proposed internal alterations
Granted Heritage and listed buildings -
Dungallan House Hotel Gallanach Road Oban Argyll And Bute PA34 4PD
Non material amendment relative to Planning Permission 24/01699/PP Erection of 2 staff accommodation buildings - Buildings 1 and 2 moved together, building 2 mirrored, windows and door positions amended for both, steps, gate and path added to south end, existing gate and steps removed at north end
Withdrawn Amendments Windows or glazing 5 docs -
Ardghillean Crannaig-a-mhinister Oban Argyll And Bute PA34 4LU
Non material amendment relative to Planning Permission 25/00881/PP - Demolition of existing extension, erection of extensions to either side of dwellinghouse and alterations - The proposed amendments relate to the approved terrace balustrades and associated terrace detailing. The revisions involve replacing the previously approved balustrade arrangement with a fabricated flat steel bar system together with associated amendments to the terrace edge detailing. The changes do not alter the approved siting, scale, footprint, use, height, massing or overall appearance of the development and are considered to be non-material.
Decided Amendments Extension DemolitionDomestic
Other heritage and listed building applications
In Argyll and Bute
-
26/01533/LIB Awaiting decision
41 Colquhoun Street Helensburgh Argyll And Bute G84 9JW
Installation of replacement windows and back door
-
26/01477/LIB Awaiting decision
Bloomhill House Carman Road Cardross Argyll And Bute G82 5LA
Alterations to listed building consent application reference 25/00285/LIB (Demolition of sections of care home and erection of extension to form 2 duplex apartments and associated works) comprising reduction of overall height, marginal increase in external wall width, slight reduction in roof pitch to ensure the finished ridge height is no higher than unit 5 and increase in size of new apartments by 1200mmm to the rear
-
25/01691/LIB Granted
Trinity Church 26 Castle Street Rothesay Isle Of Bute Argyll And Bute PA20 9HA
Conversion of existing church and church hall to form family entertainment activity centre including erection of single storey link extension
-
26/00158/LIB Withdrawn
Barcaldine Castle Benderloch Argyll And Bute PA37 1SA
Installation of standing stones and associated works including engineering operations (part retrospective)
-
26/01405/LIB Awaiting decision
Woodcote Pier Road Rhu Argyll And Bute G84 8LJ
Renewal of listed building consent reference 23/01260/LIB (Replacement of existing windows, doors, and rooflights; alterations to kitchen window to form door; replacement of slate roof tiling, rainwater goods and formation of plat and steps)