Planning application
Land South Of Langa Quarry And Adjacent To Clochkeil Cottages Machrihanish Campbeltown Argyll And Bute
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Request to modify condition 4 (restricted public events) and removal of condition 5 (restricted numbers per day) relative to planning permission 04/01924/DET (Proposed 18 hole links golf course, 20 fractional ownership units,12 suites, reception/leisure unit, 6 residential units, sewage treatment works and car parking)
As published by the council, reference 21/01794/PP
Application record
- Reference
- 21/01794/PP
- Type
- Planning Permission
- Status
- Decided
- Decision
- Application Approved
- Received
- 25 Aug 2021
- Validated
- 21 Sep 2021
- Decided
- 8 Jun 2026
- Ward
- South Kintyre
- Parish
- The Laggan Community Council
- Decision by
- Local Delegated Decision
Timeline
Dates from the published record
-
25 Aug 2021
Received by Argyll and Bute
-
21 Sep 2021
Validated
Checked as complete and ready for consideration.
-
8 Jun 2026
Decision issued: Application Approved
-
5 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Other full applications applications
In Argyll and Bute
-
26/00695/PP Granted
Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute
Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant
-
25/01665/PP Withdrawn
Land East Of Former Gunpowder Store Kames Argyll And Bute
Erection of dwellinghouse and shed. Installation of septic tank and soakaway and formation of access track
-
25/00238/PP Granted
Iain Woodrow Electrical Glenegedale Industrial Estate Glenegedale Port Ellen Isle Of Islay Argyll And Bute PA42 7AS
Erection of 2 pods for short term letting and associated works
-
26/00550/PP Granted
7 Duchess Drive Helensburgh Argyll And Bute G84 9PR
Erection of single storey front extension
-
26/00652/PP Granted
The Old Stables 7 Kennedy Drive Helensburgh Argyll And Bute G84 9AR
Demolition of existing extensions and bay window and erection of new single storey extensions