Planning application
Public Realm Areas Chalmers Street Ardrishaig Argyll And Bute
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Public realm improvements to spaces associated with the two community halls and along the waterfront with associated tree planting, seating and cycle racks. Reorganising of the car park to free up space and create better links between waterfront and town. Relocation of the bus stop to create space for an improved and safer crossing point over the A83.
As published by the council, reference 21/00868/PP
Application record
- Reference
- 21/00868/PP
- Type
- Planning Permission
- Status
- Decided
- Decision
- Granted As published: Application Approved
- Received
- 21 Apr 2021
- Validated
- 17 May 2021
- Decided
- 29 Sep 2021
- Ward
- Mid Argyll
- Parish
- Ardrishaig Community Council
- Decision by
- Local Delegated Decision
Timeline
Dates from the published record
-
21 Apr 2021
Received by Argyll and Bute
-
17 May 2021
Validated
Checked as complete and ready for consideration.
-
29 Sep 2021
Decision issued: Application Approved
-
2 Oct 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
26 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Argyll and Bute granted permission on 29 September 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Morrisons Daily 43 Chalmers Street Ardrishaig Lochgilphead Argyll And Bute PA30 8EY
Installation of 2x fascia signs, 3x digitally printed diamond signs and 2x window graphics (retrospective)
Granted Advertising Windows or glazing 17 docs -
43 Chalmers Street Ardrishaig Lochgilphead Argyll And Bute PA30 8EY
Non material amendment to planning permission 19/00928/PP (Repair and alterations to existing building and landscaping works) Proposed translucent, back-lit polycarbonate panel cladding to front fascia of building and area of wall adjacent to main entrance doors, to be replaced with mid-grey colour, powder-coated aluminium panels. The details and the sizes of the panels remains as per the consented scheme.
Granted Amendments 7 docs -
Ardrishaig Public Hall Chalmers Street Ardrishaig Argyll And Bute PA30 8EY
Alterations to entrance to form porch
Granted Full applications ExtensionSmall domestic -
55 Chalmers Street Ardrishaig Argyll And Bute PA30 8EY
97% historically approved · decision due ~2 Jul
Installation of air conditioning and external condensers
Awaiting decision Full applications -
The Grey Gull Inn Glenburn Road Ardrishaig Lochgilphead Argyll And Bute PA30 8EU
Alterations and erection of single storey extension
Granted Full applications Extension 27 docsSmall domestic -
The Grey Gull Inn Glenburn Road Ardrishaig Lochgilphead Argyll And Bute PA30 8EU
Installation of hardstanding area with fencing and installation of 2 flagpoles (part retrospective)
Granted Full applications 29 docs
Other full applications
In Argyll and Bute
-
26/01070/PP Granted
MacLeod Construction Kilmory Industrial Estate Lochgilphead Argyll And Bute PA31 8RR
Formation of accessible access to existing offices, removal of existing stepped entrance and internal alterations to form accessible toilet, kitchen, and private office space
-
26/01578/PP Awaiting decision
Achavit Dunmore Argyll And Bute PA29 6XZ
Erection of extension to dwellinghouse
-
26/00695/PP Granted
Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute
Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant
-
26/01551/PP Awaiting decision
Land Approx 640 Metres West Of Dererach Pennyghael Isle Of Mull Argyll And Bute
Formation of hardstanding for timber stacking and relocation of rock to form small causeway and interface with floating linkspan and barge
-
26/01548/PP Awaiting decision
Ashfield Bungalow Achnamara Argyll And Bute PA31 8PT
Erection of annexe for underground cellar and bar area, double garage and storage buildings and connecting pergola