Planning application
Land To West Of Earra Gael Harbour Street Tarbert Argyll And Bute
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of 21 bollards and 6 solar lamp stands (amended proposal)
As published by the council, reference 21/00856/PP
Application record
- Reference
- 21/00856/PP
- Type
- Planning Permission
- Status
- Decided
- Decision
- Granted As published: Application Approved
- Received
- 20 Apr 2021
- Validated
- 7 Jun 2021
- Decided
- 29 Jul 2021
- Ward
- Kintyre And The Islands
- Parish
- Tarbert And Skipness Community Council
- Decision by
- Local Delegated Decision
Timeline
Dates from the published record
-
20 Apr 2021
Received by Argyll and Bute
-
7 Jun 2021
Validated
Checked as complete and ready for consideration.
-
29 Jul 2021
Decision issued: Application Approved
-
5 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
19 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Argyll and Bute granted permission on 29 July 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
The Red Herring And Loch Fyne Fish Bar Stanley Place Harbour Street Tarbert Argyll And Bute PA29 6UD
Installation of 2 replacement doors, repainting of shopfront and erection of signage
Granted Full applications Windows or glazing 12 docs -
The Red Herring And Loch Fyne Fish Bar Stanley Place Harbour Street Tarbert Argyll And Bute PA29 6UD
Erection of illuminated fascia sign
Granted Advertising 12 docs -
Argyll Gift Company Harbour Street Tarbert Argyll And Bute PA29 6UD
Erection of fascia sign (non illuminated) - retrospective
Granted Advertising 9 docs -
Anchorage Restaurant Harbour Street Tarbert Argyll And Bute PA29 6UD
Change of use from restaurant to residential and internal alterations
Withdrawn Full applications -
Land Adjacent To Earra Gael Harbour Street Tarbert Argyll And Bute
Extension to seating area with viewpoint
Granted Full applications Extension 31 docs -
Anchorage Restaurant Harbour Street Tarbert Argyll And Bute PA29 6UD
97% historically approved · decision due ~29 Oct
Change of use of restaurant to form escape rooms (part retrospective)
Awaiting decision Full applications
Other full applications
In Argyll and Bute
-
26/01070/PP Granted
MacLeod Construction Kilmory Industrial Estate Lochgilphead Argyll And Bute PA31 8RR
Formation of accessible access to existing offices, removal of existing stepped entrance and internal alterations to form accessible toilet, kitchen, and private office space
-
26/01578/PP Awaiting decision
Achavit Dunmore Argyll And Bute PA29 6XZ
Erection of extension to dwellinghouse
-
26/00695/PP Granted
Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute
Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant
-
26/01551/PP Awaiting decision
Land Approx 640 Metres West Of Dererach Pennyghael Isle Of Mull Argyll And Bute
Formation of hardstanding for timber stacking and relocation of rock to form small causeway and interface with floating linkspan and barge
-
26/01548/PP Awaiting decision
Ashfield Bungalow Achnamara Argyll And Bute PA31 8PT
Erection of annexe for underground cellar and bar area, double garage and storage buildings and connecting pergola