Skip to content
PlanIndex Get alerts
Menu

Planning application

Cameron House Albany Street Oban Argyll And Bute PA34 4AE

Granted Argyll and Bute 19/02268/PP Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of metal roof guard rails and PV panels on existing flat roof

As published by the council, reference 19/02268/PP

Application record

Reference
19/02268/PP
Type
Planning Permission
Status
Decided
Decision
Granted As published: Application Approved
Received
29 Oct 2019
Validated
29 Oct 2019
Decided
2 Dec 2019
Ward
Oban South And The Isles
Parish
Oban Community Council
Decision by
Local Delegated Decision
Postcode
PA34 4AE

Timeline

Dates from the published record

  1. 29 Oct 2019

    Received by Argyll and Bute

  2. 2 Dec 2019

    Decision issued: Application Approved

  3. 26 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Argyll and Bute granted permission on 2 December 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Court House Albany Street Oban Argyll And Bute PA34 4AL

    26/01159/PP Submitted 7 Jul 2026 50 yards away

    96% historically approved · decision due ~10 Sep

    External alterations including, formation of new opening in wall to create accessible access, new secure door in existing window opening and installation of new louvred ventilation grilles. Internal alterations to create a new secure custody suite and facilitate better accessibility with installation of a lift to provide access to the first-floor Courtroom as well as the adjacent ancillary rooms.

    Decided Windows or glazing
  • Court House Albany Street Oban Argyll And Bute PA34 4AL

    26/01000/LIB Submitted 11 Jun 2026 50 yards away

    96% historically approved · decision due ~10 Sep

    External alterations including, formation of new opening in wall to create accessible access, new secure door in existing window opening and installation of new louvred ventilation grilles. Internal alterations to create a new secure custody suite and facilitate better accessibility with installation of a lift to provide access to the first-floor Courtroom as well as the adjacent ancillary rooms.

    Decided Windows or glazing
  • 9 John Anderson House Shore Street Oban Argyll And Bute PA34 4NT

    23/00403/PP Submitted 28 Feb 2023 50 yards away

    97% historically approved · decision due ~14 Aug

    Change of use from residential status to short term let (retrospective)

    Awaiting decision Full applications 24 docs
  • Skills Development Scotland Albany Street Oban Argyll And Bute PA34 4AG

    24/01294/PP Submitted 9 Jul 2024 100 yards away

    Proposed alterations, conversion and change of use from offices to 4 residential apartments for self-catering use

    Granted Full applications New dwelling 24 docs
  • Land At The Car Park Shore Street Oban Argyll And Bute

    21/01584/PP Submitted 2 Aug 2021 100 yards away

    97% historically approved · decision due ~26 Nov

    Erection of hotel

    Awaiting decision Full applications 85 docs
  • Office 1 Campbell Street Oban Argyll And Bute PA34 4BQ

    23/01352/PP Submitted 12 Jul 2023 100 yards away

    Alterations to workshop/office

    Granted Full applications 18 docs

In Argyll and Bute

  • 26/01070/PP Granted

    MacLeod Construction Kilmory Industrial Estate Lochgilphead Argyll And Bute PA31 8RR

    Formation of accessible access to existing offices, removal of existing stepped entrance and internal alterations to form accessible toilet, kitchen, and private office space

    Received 23 Jun, published by the council 28 Jul 2026 Full applications
  • 26/01578/PP Awaiting decision

    Achavit Dunmore Argyll And Bute PA29 6XZ

    Erection of extension to dwellinghouse

    9 Sep 2026 Full applications
  • 26/00695/PP Granted

    Land At Alt An T-Seilich The Oa Isle Of Islay Argyll And Bute

    Installation of 4 glamping pods, new borehole and installation of package sewage treatment plant

    Received 27 Apr, published by the council 28 Jul 2026 Full applications
  • 26/01551/PP Awaiting decision

    Land Approx 640 Metres West Of Dererach Pennyghael Isle Of Mull Argyll And Bute

    Formation of hardstanding for timber stacking and relocation of rock to form small causeway and interface with floating linkspan and barge

    Received 3 Sep, published by the council 8 Sep 2026 Full applications
  • 26/01548/PP Awaiting decision

    Ashfield Bungalow Achnamara Argyll And Bute PA31 8PT

    Erection of annexe for underground cellar and bar area, double garage and storage buildings and connecting pergola

    Received 3 Sep, published by the council 9 Sep 2026 Full applications