Skip to content
PlanIndex Get alerts
Menu

Planning application

Approximately 65m south east of 104 Boghill Road, Templepatrick, BT39 0HS

Granted Antrim and Newtownabbey LA03/2024/0786/O Outline

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Dwelling

As published by the council, reference LA03/2024/0786/O

Application record

Reference
LA03/2024/0786/O
Type
Outline
Status
Determined
Decision
Granted
Received
31 Oct 2024
Validated
31 Oct 2024
Decided
18 Dec 2024
Ward
Clady
Postcode
BT39 0HS

Timeline

Dates from the published record

  1. 31 Oct 2024

    Received by Antrim and Newtownabbey

  2. 18 Dec 2024

    Decision issued: Granted

  3. 30 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Hazel Grove

43 applications on PlanIndex · across 11 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

22 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • Approximately 35m south east of 104 Boghill Road, Templepatrick, BT39 0HS

    LA03/2024/0785/O Submitted 31 Oct 2024 28m away

    Dwelling

    Granted Outline 22 docs
    Domestic
  • Approximately 10m south of 100 Boghill Road, Templepatrick, BT39 0HS

    LA03/2026/0271/F Submitted 24 Apr 2026 200m away

    96% historically approved · decision due ~24 Jun

    Proposed conversion and extension of existing vernacular barn to a dwelling

    Awaiting decision Full applications Extension 23 docs
    Domestic
  • 100 Boghill Road, Templepatrick, BT39 0HS

    LA03/2026/0272/O Submitted 24 Apr 2026 248m away

    79% historically approved · decision due ~19 Jun

    Proposed off-site replacement dwelling

    Awaiting decision Outline 22 docs
    Domestic
  • 300m east of no. 105 Boghill Road, Templepatrick, BT39 0HS

    LA03/2026/0444/S54 Submitted 23 Jun 2026 395m away

    Proposed (Vesta) V52 wind turbine (hub height 51.9 and tip height 77.9), one substation, one electrical cabinet, hardstanding, access lane, cabling and all associated and ancillary works (Variation of Condition 6 and 9 from planning approval LA03/2022/0615/F regarding noise monitoring survey and scheme for the assessment and regulation of amplitude modulation)

    Granted 12 docs
  • 300m east of no. 105 Boghill Road, Templepatrick, BT39 0HS

    LA03/2026/0420/DC Submitted 16 Jun 2026 395m away

    92% historically approved · decision due ~11 Aug

    Proposed (Vesta) V52 wind turbine (hub height 51.9 and tip height 77.9), one substation, one electrical cabinet, hardstanding, access lane, cabling and all associated and ancillary worksBat Monitoriing and Mitigation Plan as specified in the condition (Discharge of condition 15 from planning approval LA03/2022/0615/F regarding the submission of a Bat Monitoring and Mitigation Plan)

    Awaiting decision Conditions 4 docs
  • 300m east of no.105 Boghill Road, Templepatrick, BT39 0HS

    LA03/2026/0551/S54 Submitted 29 Jul 2026 395m away

    92% historically approved · decision due ~1 Oct

    Proposed (Vesta) V52 wind turbine (hub height 51.9 and tip height 77.9), one substation, one electrical cabinet, hardstanding, access lane, cabling and all associated and ancillary works. (Removal of Condition 13 of planning approval LA03/2026/0444/S54 regarding the submission of an aviation lighting scheme)

    Awaiting decision 6 docs

In Antrim and Newtownabbey

  • LA03/2026/0601/O Awaiting decision

    50M SW of 7 Ballynoe Lane, Antrim, BT41 2RA

    Dwelling and garage on a farm

    19 Aug 2026 Outline
  • LA03/2026/0597/O Awaiting decision

    52 Rathmore Road, Dunadry, Antrim, BT41 2HG

    Site for dwelling including all ancilliary works.

    18 Aug 2026 Outline
  • LA03/2026/0590/O Awaiting decision

    70m SE of 183 Portglenone Road, Randalstown, accessed from Mucklerammer Road

    Dwelling and garage on a farm

    17 Aug 2026 Outline
  • 50m SE OF 29 Dundrod Road, Nutts Corner, Crumlin, BT29 4SR

    Dwelling

    1 Jun 2026 Outline
  • LA03/2026/0537/O Awaiting decision

    42m NE of 64F Tildarg Road, Ballyclare, BT42 3NY

    Dwelling and Garage

    21 Jul 2026 Outline