Planning application
Lands approx. 218m east of 20 Greenhill Road Belfast
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Proposed erection of a 1mw battery energy storage system facility (BESS) including BESS control room on existing wind turbine to store and stabilise energy supply for wind turbine
As published by the council, reference LA03/2022/0899/F
Application record
- Reference
- LA03/2022/0899/F
- Type
- Full
- Status
- Determined
- Decision
- Granted
- Received
- 14 Oct 2022
- Validated
- 14 Oct 2022
- Decided
- 5 May 2023
- Ward
- Clady
Timeline
Dates from the published record
-
14 Oct 2022
Received by Antrim and Newtownabbey
-
5 May 2023
Decision issued: Granted
-
12 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
TSA Planning Ltd Agent, a planning consultancy registered in Belfast
Active · incorporated 2007 · Belfast
217 applications on PlanIndex · across 11 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
28 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Antrim and Newtownabbey granted permission on 5 May 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
218m east of No. 20 Greenhill Road, Ballyutoag, Belfast, BT14 8SH
Erection of replacement wind turbine with a 40m hub height and 27m blade length to replace existing wind turbine. associated 2no. electricity cabinets and site works (Partial discharge of Condition 12 from approval LA03/2020/0422/F regarding submission of Bat monitoring and mitigation plan)
Granted Conditions 9 docs -
218m east of No. 20 Greenhill Road, Ballyutoag, Belfast, BT14 8SH
100% historically approved · decision due ~13 May
Erection of replacement wind turbine with a 40m hub height and 27m blade length to replace existing wind turbine. associated 2no. electricity cabinets and site works (Partial Discharge of Condition 12 from planning approval LA03/2020/0422/F regarding the submission of bat monitoring report for Year 4 (2025) in accordance with the agreed bat monitoring & mitigation plan
Awaiting decision Conditions 6 docs
Other full applications
In Antrim and Newtownabbey
-
LA03/2026/0511/F Granted
Public footpath along Ballymena Road, approximately 16 metres SW of 208 Meadow Lands, Antrim, BT41 4EZ
Proposed installation of telephone kiosk on public footpath
-
LA03/2026/0036/F Granted
Unit 32, Antrim Business Park, 25 Randalstown Road, Antrim, BT41 4LD
Change of use from an existing warehouse unit to a gym (Retrospective)
-
LA03/2026/0375/F Granted
Steel Mac Distribution (SMD) Ltd. Unit 1a Global Point Avenue, Newtownabbey, BT36 5TB
Extensions and alterations to existing factory for Steel Mac Distribution (SMD) Ltd. and all ancillary site works and infrastructure
-
LA03/2026/0660/F Awaiting decision
Abbots Cross Primary School, 86 Doagh Road, Newtownabbey, BT37 9QW
Erection of 1 no. modular classroom
-
LA03/2026/0312/F Withdrawn
15m north of 58 The Diamond Road, Aldergrove, Crumlin, BT29 4QY
Retention of temporary mobile home and adjacent stoned area for car parking